Monthly Operating Rept for Sept 1995 for Fermi 2
ML20093H643
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1995
From: Mckeon R, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-95-0092, CON-NRC-95-92 NUDOCS 9510200273
Download: ML20093H643 (4)


Text

'

Robert McKeon s Assistard V4e Presiderd and Managor. operations .

00 Dame Hw Edison Wa"r""y 1r w. -

Reg Guide 1.16 October 12,1995 NRC-95-0092 U. S. Nuclear Regulatory Commission At:ntion: Document Control Desk Washington D. C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Ooerating Status Reoort for September.1995 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for September,1995. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in '

' NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please' contact Brian Stone, at (313) 586-5148.

Sincerely, fYW Enclosure ,

cc: T. G. Colburn D. R. Hahn M. J. Jordan

' H. J. Miller A. Vegel

. M. V. Yudasz, Jr.

Region III I bf1f[' ,

'9510200273 950930 g-PDR ADOCK 05000341 '

.. R , , . PDR ... m

OPERATING DATA REPORT ,

DOCKET,NO, 50-3e COMPLETED BY B. J. Stone DA.TE Octobe. 12.1995 TELEPHONE (313) 586-5148 OPERATING STATUS 4

1. Unit name: Fermi 2 NOTES: (1) Calculated using weighted
2. Reporting period: September.1995 averages to reflect variations in rating (MDC
3. Licensed thermal power (Mwt): 3430 and DER). (2) Currently limiting power to
4. Nameplate rating (Gross Mwe): 1179 96% CTP maximum for Startup Test
5. Design elect rating (Net Mwe): 1I16 Program. Nameplate and DER ratings
6. Max dependable cap (gross Mwe): 924 reflect 98% CTP due to turbine throttle valve
7. Max dependable cap (Net Mwe): !L76 limitations
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted,if any (Mwe Net): 96% CTP/3293 MWT
10. Reasons for restriction,if any: (2) 1 THIS MONTH YEAR TO CUMULATIVE DATE
11. Hours in reporting period 720 6.551 67.381
12. Hours reactor was critical 720 5.407 46.142.6
13. Reactor reserve shutdown hours Q Q Q
14. Hours generator on-line 720 4.302.9 43.427.30
15. Unit reserve shutdown hours 0 0 0
16. Gross thermal energy gen (MWH) 2.370.432 12.943.944 132.657.995
17. Gross elect energy gen (MWH) 664.260 M76.490 43.450.441
18. Net Elect energy gen (MWH) 632.787 3.280.194 41.513.909 '
19. Unit service factor 100 65.7 64.5 1
20. Unit availability factor 100 65.7 64.5  ;
21. Unit cap factor (using MDC net) 100.3 57.2 58.4 1
22. Unit cap factor (using DER net) 78.8 44.9 55.9
23. Unit forced outage rate Q 32.0 22.3 j
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): 1
25. If shutdown at end of report period, estimated date of startup: l
26. Units in test status (prior to commercial operation):

FORECAST ACHIEVED Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A 4

AVERAGE DAILY UNIT POWER LEVEI/

DOCKET NO. 50-341 a .

UNIT Fermi 2 DATE October 12.1995 COMPLETED BY B. J. Stone

TELEPHONE (313)586-5148
Month September.1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER

, POWER LEVEL LEVEL

(MWe-Net) (MWe-Net) 4 1 874 17 878 2 874 18 879 3 873 19 879 4 874 20 878

~

5 873 21 880 6 874 22 880 7 872 23 881 l 8 876 24 880 9 879 25 880 10 875 26 879 11 879 27 879 12 879 28 879 i l

13 878 29 878 l

14 878 30 878 l

15 878 16 878 I l

________-_-_______-__________l

UNIT SHUTDOWNS AND POWER REDUCTIONS $

DOCKET NO. 50-341 DATE October 12.1995 s

UNIT NAME Fermi 2 COMPLETED BY B.1 Stone _

TELEPHONE (313)586-5148 _

REPORT MONTH September 1995 No. (6) Date TYPE Dur (Hrs) (7) Reason (2) Method of shutting LER Sys Code (4) Comp Cause and Corrective (1) down reactor or No. Code Action to Prevent reducing power (3) (5) Recurrence (1) F: Forced (2) REASON: (3) METIIOD: (4) Instructions for preparation of data S: Scheduled A - Equipment Failure (Explain) 1 - Manual entry sheets for Licensee Event Report B - Maintenance or Test 2 - Manual Scram (LER) file (NUREG-1022)

C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued (5) Same Source as (4)

E - Operations Training and 5 - Reduced Load License Examination 9 - Other (6) R - Prefix indicates power reduction.

F- Administrative S - Prefix indicated plant shutdown.

G - Operational Error (Explain)

H - Other (Explain) (7) Duration of reductions reported as zero per regulatory guide 1.16 Revision 4