NRC-95-0060, Monthly Operating Rept for May 1995 for Fermi 2

From kanterella
(Redirected from NRC-95-0060)
Jump to navigation Jump to search
Monthly Operating Rept for May 1995 for Fermi 2
ML20085G130
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/31/1995
From: Gipson D, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-95-0060, CON-NRC-95-60 NUDOCS 9506200081
Download: ML20085G130 (4)


Text

-~- - - -
j. - '
  1. . -;; Drugtss R.O pson Senior Vce President l Nuclear Generation Fermi 2 r

NRC-95-0060 t-i U.- S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 '

NRC Docket No. 50-341 l

WRC Operating License No. NPF-43 l

Subject:

Monthly Operating Status Report for May. 1995 i

Enclosed for your information and use is the Fermi 2 Monthly i Operating Status Report for May, 1995. .This report includes i the Operating Data Report, Average Daily Unit Power Level, and ,

'the Summary of Unit Shutdowns and Power Reductions identified  ;

'in NRC Regulatory Guide 1.16 and Feral 2 Technical. '

Specification 6.9.1.6.  :

If you have any questions, please contact Brian Stone, at. .I (313) 586-5148. I Sincerely, Enclosure l cc: T. G. Colburn D. R. Hahn J. B. Martin

'M. P. Phillips P. L. Torpey n A.- Vegel Region III A K 0341 R PDR / di

/ -

a F

...:-.. . = - -

v.

l%

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE June 15,~1995 TELEPHONE (313) 586-5148 OPERATING STATUS  ;

1. UNIT NAME:- ' Fermi 2 l Notes: (1) Calculated using weight-l.

l

2. REPORTING PERIOD: May, 1995- .l ed averages to reflect variations l' 3 LICENSED THERMAL POWER (MWt): 3430 l in rating (MDC and DER). l

~

4. NAMEPLATE RATING (GROSS We): 1179 l (2) Currently. limiting power to l l
5. DESIGN ELECT RATING (Net MWe): 1116 l 96% CTP maximum for Startup Test l 4
6. MAX DEPENDABLE CAP (GROSS MWe):1132 l Program. All ratings reflect 98%. l 7 MAX D2PENDABLE CAP (Net Me):1085 l CTP due.to. turbine throttle valve l-l-limitations. l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)'SINCE LAST REPORT, GIVE REASONS: N/A 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (We Net):' 965 CTP/3293 MWT
10. REASONS FOR RESTRICTION, IF ANY: (2)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 3,623' 64,453 ,
12. HRS REACTOR WAS CRITICAL 673.5 2,754.5 43,490.1
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0 i
14. HOURS GENERATOR ON-LINE 626.7 -1,780.6 40,833 0
15. UNIT RESERVE' SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 1,675,272 -4,486,440 124,200,491 ,
17. GROSS ELECT ENERGY GEN (WH) 457,640 1,111,020 41,084,977
18. NET ELECT ENERGY GEN (MWH) 430.594 1,040,277- 39,273,992 l
19. UNIT SERVICE FACTOR 84.2 47.2 63.4

'20. UNIT AVAILABILITY FACTOR 84.2 47.2 63.4

21. UNIT CAP FACTOR (USING MDC NET) 53 3 26.5 56.7
22. UNIT CAP FACTOR (USING DER NET) 51.9 25.7 55 3
23. UNIT FORCED OUTAGE RATE 15.8 49.7 22 9 l
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A a r w,n-.- ---,,,,.,e.n- -

,, ---,,--n, e --ee

1..

\

  • 0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341

' UNIT FERMI 2 DATE June 15, 1995

  • COMPLETED BY B. Stone TELEPHONE (313) 586-5148 4 Month May, 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) .(MWe-Net) 1 0 17 786 2 0 18 785

, 3 0 19 785-4 ,

0 20 785 5 0 21 785

6. 149 22 781 7 149 23 794 8 211 24 815-9 376 25 824 10 442 26 837 11 788 27 850 12 789 28 847 13 660 __ 29 850 14 SS7 30. 850 15 789 31. 857 16 788

.... .- . - . .. < . . .m .. , . . - -

Jr .i

.Wy ..g I: _ s

' UNIT SHUTDOWNS AND.POWEII(LEDUCTIONS DATE

  • DOCKET NO. 50-341 June 15. 1995 UNIT NAME Fermi 2 COMPLETED BV' B. J. Stone TELEPHONE (313) 586-$148

-REPORT MONTH May. ~1995 1 METHOD OF SHUTTING DOWN .LER 5YS COMP CAUSE & CORRECTIVE NO .- DATE TYPE DUR ' REASON THE REACTOR NO. , CODE CODE ACTION TO PREVENT (1)

(HRS) (2) OR REDUCING (4) -(5) RECURRENCE -

(6) (7) POWER (3)

S95-09 950425 F 117.3 A 3 L95-005 JJ RG Automatic reactoe scram on APRM . l (B)- I neutron upscale trip resulting from l reactor' pressure rogulator.

I transient; Reactor restart 5/3/95.

R95-10 950513 F 27.5 8 5 N/A SG COND Recuced reactor power ~ to 50% to-repair tube leaks in main concenser.

I.

(1) F: FORCED (2) REASON: . (3) METHODS. (4) INSTRUCTIONS FOR S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) s 1 - MANUAL PREPARATION OF DATA S - MAINTENANCE OR TEST 2 - MANUAL 1 SCRAM ^ ENTRY SHEETS FOR LICENSEE

, C --REFUELING . 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE:

D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-1022)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE . 9 - OTHER G - OPERATIONAL ERROR (EXPLAIN)

H- OTHER (EXPLAIN) (5).SAME SOURCE AS (4)

(6) R' - PREFIX INDICATES POWEF c .t<LDUCTION.

5 - PREFIX INDICATES PLANT SHUTDOWN.

p (7) DURATION OF, REDUCTION $'.

REPORTED AS ZERO PER REG.

-GUIDE 1.16 REv. 4

"(8) UNIT RESTART MAY 3 AND.

3 TURBINE ON LINE MAY 5; 2 1995.

(8) OUTAGE HOURS ARE A CONTINUATION OF THE O' TAGE j~ WHICH BEGAN 04/25/95.

LREACTOR' CRITICAL 05/03/95

-TURBINE ON LINE 05/05/95.

4 4