Monthly Operating Rept for Nov 1994 for Fermi 2
ML20078Q005
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/30/1994
From: Gipson D, Pirkle R, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-94-0119, CON-NRC-94-119 NUDOCS 9412210094
Download: ML20078Q005 (5)


Text

_ _ . _

4-o

,, Orugt:s R. Gipson Sen.or Vice President '

! Nuclear Generaton b ' Forms 2 6400 North Dme Hrghway Newport. Michigan 48166 (313) fES249 Reg Guide 1.16 December 15, 1994 NRC-94-0119 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for November, 1994 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for November, 1994. This report includes the Operating Data Report, Average Daily Unit Power

. Level, ahd the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely, Enclosure cc: T. G. Colburn D. R. Hahn J. B. Martin M. P. Phillips P. L. Torpey A. Vegel 9412210094 941130 M I PDR ADOCK 05000341 l R PDR

, OPERATING DATA REPORT

, ' DOCKET NO. 50-341 COMPLETED BY B. J.' Stone DATE December 15, 1994' TELEPHONE (313) 586-5148 OPERATINd STATUS

1. UNIT NAME: Fermi 2 l Notes: (1) Calculated using weight-l
2. REPORTING PERIOD:_ November, 1994 l ed averages to reflect variations l 3 LICENSED THERMAL POWER (MWL): 3430 l in rating (MDC and DER). l
4. NAMEPLATE RATING (GROSS MWe): 1179 l (2) Currently limiting power to l S. DESIGN ELECT RATING (Net MWe): 1116 I 93 5% CTP maximum to limit turbine l
6. MAX DEPENDABLE CAP (GROSS MWe):1135 l component vibration. All ratings l
7. MAX DEPENDABLE CAP (Net MWe):1085 l reflect 98% CTP due to turbine l l throttle valve limitations. l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: N/A
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): (2) ,_
10. REASONS FOR RESTRICTION, IF ANY: (2) s THIS HONTH YH TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 720 8,016 60,086
12. HRS REACTOR WAS CRITICAL 0 0 40,545
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE O O 39,124.4
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 0 0 119,702,687
17. GROSS ELECT ENERGY GEN (MWH) 0 0 39.973,957 '
18. NET ELECT ENERGY GEN (MWH) 0 0 38,233,715
19. UNIT SERVICE FACTOR 0 0 65.1
20. UNIT AVAILABILITY FACTOR 0 0 65.1
21. UNIT CAP FACTOR (USING MDC NET) 0 0 59.2(1)
22. UNIT CAP FACTOR (USING DER NET) 0 0 57.9(1)
23. UNIT FORCED OUTAGE RATE 100.0 100.0 19.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

December, 1994

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

1

, AVERAGE DAILY UNIT P0tRR LETFL i DOCKET NO. 50-341 UNIT FERMI 2

, DATE December 15. 1994 -

COMPLETED BY R. Pirkle TELEPHONE (313) 586-5027  :

Month November, 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0 I

l l

_m . . - " '"

3

~

UNIT SHUTDOWNS f.ND POWE:3 CEDUCTIONS  !

DOCKET NO. 50-341 .

  • DATE- Decembar 15. 1994 .

j UNIT NAME Fermi 2 COMPLETED DV B. J. Ston9 -* ~

REPORT MONTH November. 1994 TELEPHONE (313) 586-5148 * 'n-i METHOD OF NO. SHUTTING DOWN . LER SYS COMP DATE TYPE DUR REASON THE REACTOR CAUSE & CORRECTIVE NO. CODE CODE ACTION TO PREVENT

'; I (1) (HRS) (2) OR REDUCING (4) (5)

  • l (6)  ! (7) RECURRENCE

$ I POWER (3)

(8) 6 593-06 931225 F 720 A 3 93-014 TA ' TRB Reactor tripped following trip of nm in turbine. Turbine tripped due l' to imbalance caused by loss of 5 8th i 1 stage blades in low pressure turbine l f n;mber 3. Operation without 7th and I 8th stages in all three LP turbines is planned for upcoming operating cycle. Operation without stages 7 t and 8 mill prevent recurrence, (1) F: FORCED (2) REASON:

S: SCHEDULED (3) #ETHOD: (4) INSTRUCTIONS FOR j A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA

' B - MAINTENANCE OR TEST 2 - MANUAL SCRAM C - REFUELING ENTRY SHEETS FOR LICENSEE 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED

, (NUREG-1022) g E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD

  • F - ADMINISTRATIVE 9 - OTHER G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(5) SAME SOURCE AS (4)

(6) R - PREFIX INDICATES POWER I REDUCTION.

{ 5 - PPEFIX INDICATES PLANT SHUTDOWN.

(7) DURATION OF REDUCTIONS

, REPORTED AS ZERO PER REG.

GUIDE 1.16 REV. 4 i

(8) Outage hours are a continuation of the outage which began on 12/25/93.