ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides
ML24302A242
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/29/2024
From:
Constellation Energy Generation
To: Robert Davis
NRC/NRR/DORL/LPL1
Klett, AL
References
EPID L-2024-LRM-0009
Download: ML24302A242 (5)


Text

NRC Pre-submittal Meeting October 29, 2024 Meeting Purpose

  • Gain alignment on the basis of the additional NRC requested documents from DI&C-ISG-06 Rev 2 Enclosure B.

Agenda

  • Introductions -Project Team
  • Requested DI&C-ISG-06 Rev 2 Enclosure B documents
  • NRC to provide regulatory basis for the requested documents

1 Constellation Energy

  • Pablo Guardado, Principal PM, PEA Project Management
  • Steve Flickinger,Prin. Reg. Specialist, Corporate Licensing

Sargent & Lundy

  • Pareez Golub - Project Director, Digital Licensing SME

2 Additional documents requested by the NRC Items submitted as part of the ARP

  • 1.6 (Summary of) Hardware Equipment Qualification
  • 1.3 Approved Topical Report Safety Evaluation
  • 1.11 Software Requirements Specification
  • 1.4 System Description
  • 1.12 Software Design Specification
  • 1.5 System Architecture
  • 1.13 Design Analysis Reports for Platform Changes
  • 1.7 (Unified Compliance/Conformance Matrix for) IEEE
  • 1.14 System Response Time Analysis Report [Institute of Electrical and Electronics Engineers] Stds 603-1991
  • 1.16 Commercial-Grade Dedication Plan and 7-4.3.2-2003
  • 1.17 Quality Assurance Plan for Hardware
  • 1.8 (Changes to) Technical Specifications
  • 1.18 (Summary of) Hardware Development Process
  • 1.9 Setpoint Methodology and Calculations
  • 2.2 As-Manufactured, System Configuration Documentation
  • 1.10 Secure Development and Operational Environment
  • 2.3 Summary Test Reports
  • 2.6 System-Level Failure Modes and Effects Analysis
  • 2.9 (Summary of) Electromagnetic Interface, Temperature, Humidity, and Seismic Testing Results
  • 2.10 Commercial-Grade Dedication Report(s)

3

  • The project team needs to understand the basis of the additional NRC requests to ensure that what we provide in the submittal meets the necessary basis.