MONTHYEARPMNS20230649, Meeting with Oklo to Discuss Seismic Design Categorization and Site Characterization2023-05-19019 May 2023 Meeting with Oklo to Discuss Seismic Design Categorization and Site Characterization Project stage: Request ML23249A1732023-09-11011 September 2023 Summary of Meeting to Discuss Fitness for Duty for the Oklo Auroa X Design Project stage: Meeting ML23220A4342023-09-18018 September 2023 May 30 2023 Oklo Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting ML23237A7412023-09-18018 September 2023 Oklo August 1, 2023 Meeting Summary Cover Letter and Enclosure 1 Cyber Project stage: Meeting ML23240A7132023-09-29029 September 2023 Oklo August 8, 2023 Meeting Summary Cover Letter and Enclosure 1 Operations Project stage: Meeting ML23242A1562023-10-0303 October 2023 Oklo Meeting Summary August 1 2023 (Cover Letter and Enclosure 1) Project stage: Meeting PMNS20231337, Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design2023-11-27027 November 2023 Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design Project stage: Request PMNS20231336, Meeting with Oklo to Discuss Future Iterations of Its Design2023-11-30030 November 2023 Meeting with Oklo to Discuss Future Iterations of Its Design Project stage: Request ML23249A1352024-01-16016 January 2024 Summary of Partially Closed Public Meeting with Oklo, Inc., to Discuss Materials for the Oklo Advanced Reactor Design Project stage: Meeting ML23256A2772024-01-16016 January 2024 August 8, 2023, Summary of the Meeting to Discuss Safety Classification and Instrumentation and Controls the Reactor Trip System for the Oklo Aurora X Design Project stage: Meeting ML23249A1182024-01-17017 January 2024 June 29, 2023 Oklo Meeting Summary Materials- Cover Letter and Enclosure 1 Project stage: Meeting ML23256A2822024-01-17017 January 2024 June 30, 2023, Summary of the Partially Closed Public Meeting with Oklo to Discuss Probabilistic Risk Assessment for the Oklo Advanced Reactor Design Project stage: Meeting ML23312A0812024-01-18018 January 2024 August 8, 2023, Summary of the Partially Closed Meeting with Oklo to Discuss Safety Analysis for the Oklo Advanced Reactor Design Project stage: Meeting ML23159A1402024-01-31031 January 2024 Summary of Meeting to Discuss Safety Classification for the Oklo Advanced Reactor Design Project stage: Meeting ML24036A0822024-02-0505 February 2024 July 31, 2023, Summary of the Partially Closed Public Meeting with Oklo to Discuss Safety Classification and Regulatory Controls for the Oklo Advanced Reactor Design Project stage: Meeting ML24064A2272024-02-0909 February 2024 December 12, 2023, Summary of Closed Public Meeting to Discuss a Future Iteration of the Oklo Advanced Reactor Design Project stage: Meeting ML24074A3972024-03-12012 March 2024 Summary of Partially Closed Meeting with Oklo to Discuss Concept of Operations for Oklos Advanced Reactor Design Project stage: Meeting PMNS20240377, Meeting with Oklo to Discuss Physical Security for Its Advanced Reactor Design2024-03-14014 March 2024 Meeting with Oklo to Discuss Physical Security for Its Advanced Reactor Design Project stage: Request ML24226B2492024-09-13013 September 2024 June 25 2024 Oklo Met Data Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting PMNS20241182, Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design2024-09-14014 September 2024 Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design Project stage: Request ML24233A1722024-09-30030 September 2024 April 10 and 11 2024 Oklo Physical Security Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting PMNS20241327, Meeting with Oklo to Discuss the Information Required in a Combined License Application2024-10-18018 October 2024 Meeting with Oklo to Discuss the Information Required in a Combined License Application Project stage: Meeting ML24285A2232024-11-0606 November 2024 Summary of Partially Closed Meeting with Oklo to Discuss Concept of Operations for Oklos Advanced Reactor Design (EPID L-2022-LRM-0042 Project stage: Meeting PMNS20241541, Meeting with Oklo to Discuss Its Proposed Framework for Operator Licensing for Its Advanced Reactors2025-01-0606 January 2025 Meeting with Oklo to Discuss Its Proposed Framework for Operator Licensing for Its Advanced Reactors Project stage: Request ML25045A2152025-01-22022 January 2025 Fleet Model for Licensed Operator Topical Report - Public Project stage: Other ML24355A1352025-01-30030 January 2025 Summary of Meeting with Oklo, Inc., to Discuss Plan for Readiness Assessment for Future License Application Project stage: Meeting ML25045A2162025-04-11011 April 2025 Oklo, Inc., Meeting Summary January 22, 2025 Cover Letter and Enclosure 1 Project stage: Meeting ML25245A2072025-09-0202 September 2025 Oklo Pre-submittal Audit Plan Project stage: Other ML25218A2622025-11-24024 November 2025 July 23 2025 Summary of Partially Closed Meeting with Oklo to Discuss a Proposed Topical Report in the QA Program Description EPID L-2022-LRM-0042 Cover Letter and Enclosure 1 Project stage: Meeting 2024-11-06
[Table View] |
Text
October 3, 2023 MEMORANDUM TO:
William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Donna Williams, Senior Project Manager /RA/
Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE AUGUST 1, 2023, PARTIALLY CLOSED MEETING WITH OKLO TO DISCUSS THE ENVIRONMENTAL REPORT FOR THE OKLO DESIGN (EPID L-2022-LRM-0042)
Meeting Information:
Applicant: Oklo, Inc.
Project No.: 99902095 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML23193A986 Applicant Presentation Slides ADAMS Accession No.: ML23242A148 Meeting Attendees: See enclosure 1 for a list of meeting attendees.
CONTACT: Donna Williams, NRR/DANU/UAL1 301-415-1322
W. Jessup 2
Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271). Highlights from the meeting included the following:
The staff met with Oklo, Inc. (Oklo) to discuss the Environmental Report (ER) for its advanced reactors.
The staff had previously met with Oklo on August 31, 2022, to discuss several key topics for the Oklo reactor design, including the environmental review. Oklo and the staff agreed that a separate meeting should be scheduled to discuss the environmental review. Oklo asked the staff to review the ER submitted with the Aurora combined license application (COLA) and share any feedback prior to a meeting. In December 2022, the staff provided Oklo with its feedback regarding the additional information that the staff would expect to see in a future ER. In its feedback, the staff noted information that was missing in the ER submitted with the Aurora COLA and the staffs expectations for a future submittal. The purpose of the August 1, 2023, meeting was to discuss this feedback.
Oklo stated the following goals for the August 1, 2023, meeting:
o Increase familiarity with Oklo's approach to product development and its design.
o Discuss NRC feedback from the 2020 Aurora ER.
o Provide clarification on Oklos approach to meeting Title 10 of the Code of Federal Regulations (10 CFR) Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, requirements.
o Inform the changes needed to the Aurora ER to ensure the acceptability of the forthcoming ER that would be submitted as part of a future COLA.
Oklo addressed the staffs feedback from the 2020 Aurora ER. This feedback was derived from Audit Items F.1, Environmental Report, in the Summary of Audit for the Oklo Power LLC Aurora Combined License Application Acceptance Review, dated August 19, 2020 (ML20230A372).
Oklo also shared its proposed approach to the use of a site parameter envelope, exemptions to 10 CFR 51.20(b), and the use of references to the final safety analysis report in the ER. The staff stated that it would provide feedback on these proposals in a future interaction.
In various interactions with Oklo since the August 2022 meeting, the staff provided feedback regarding additional information that would be needed in an ER submitted with a future COLA.
Based on the discussions held during the August 1, 2023, meeting on the environmental review and recent interactions on this topic, Oklo determined that no additional
W. Jessup 3
discussions regarding the environmental review are needed in the pre-application phase. Oklo has indicated that this will be a topic addressed in the readiness assessment.
Enclosures:
- 1.
List of Attendees
- 2.
Meeting notes (proprietary)
- 3.
Slides (proprietary) cc: Oklo Powerhouse via GovDelivery
Package ML23242A142 Letter: ML23242A156 : ML23242A158 : ML23242A148 NRR-106 OFFICE NRR/DANU/UAL1: PM NMSS/REFS/ERNRB:BC NRR/DANU/UAL1: BC NAME DWilliams KErwin WJessup DATE 8/30/2023 9/25/2023 10/03/2023
List of Meeting Attendees Partially Closed Meeting with Oklo to Discuss the Environmental Report for the Oklo Design August 1, 2023 Name Organization Donna Williams U.S. Nuclear Regulatory Commission (NRC)
Patricia Vokoun NRC Brian Glowacki NRC Donald Palmrose NRC Laura Willingham NRC Peyton Doub NRC William Jessup NRC Alex Siwy NRC Trace Orf Oklo, Inc. (Oklo)
Ross Moore Oklo Brian Kloiber Oklo Alan Smith Oklo Alex Renner Oklo Pat Everett Oklo Scott Auerbach Oklo Emma Redfoot Oklo