MONTHYEARPMNS20230649, Meeting with Oklo to Discuss Seismic Design Categorization and Site Characterization2023-05-19019 May 2023 Meeting with Oklo to Discuss Seismic Design Categorization and Site Characterization Project stage: Request ML23249A1732023-09-11011 September 2023 Summary of Meeting to Discuss Fitness for Duty for the Oklo Auroa X Design Project stage: Meeting ML23220A4342023-09-18018 September 2023 May 30 2023 Oklo Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting ML23237A7412023-09-18018 September 2023 Oklo August 1, 2023 Meeting Summary Cover Letter and Enclosure 1 Cyber Project stage: Meeting ML23240A7132023-09-29029 September 2023 Oklo August 8, 2023 Meeting Summary Cover Letter and Enclosure 1 Operations Project stage: Meeting ML23242A1562023-10-0303 October 2023 Oklo Meeting Summary August 1 2023 (Cover Letter and Enclosure 1) Project stage: Meeting PMNS20231337, Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design2023-11-27027 November 2023 Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design Project stage: Request PMNS20231336, Meeting with Oklo to Discuss Future Iterations of Its Design2023-11-30030 November 2023 Meeting with Oklo to Discuss Future Iterations of Its Design Project stage: Request ML23249A1352024-01-16016 January 2024 Summary of Partially Closed Public Meeting with Oklo, Inc., to Discuss Materials for the Oklo Advanced Reactor Design Project stage: Meeting ML23256A2772024-01-16016 January 2024 August 8, 2023, Summary of the Meeting to Discuss Safety Classification and Instrumentation and Controls the Reactor Trip System for the Oklo Aurora X Design Project stage: Meeting ML23249A1182024-01-17017 January 2024 June 29, 2023 Oklo Meeting Summary Materials- Cover Letter and Enclosure 1 Project stage: Meeting ML23256A2822024-01-17017 January 2024 June 30, 2023, Summary of the Partially Closed Public Meeting with Oklo to Discuss Probabilistic Risk Assessment for the Oklo Advanced Reactor Design Project stage: Meeting ML23312A0812024-01-18018 January 2024 August 8, 2023, Summary of the Partially Closed Meeting with Oklo to Discuss Safety Analysis for the Oklo Advanced Reactor Design Project stage: Meeting ML23159A1402024-01-31031 January 2024 Summary of Meeting to Discuss Safety Classification for the Oklo Advanced Reactor Design Project stage: Meeting ML24036A0822024-02-0505 February 2024 July 31, 2023, Summary of the Partially Closed Public Meeting with Oklo to Discuss Safety Classification and Regulatory Controls for the Oklo Advanced Reactor Design Project stage: Meeting ML24064A2272024-02-0909 February 2024 December 12, 2023, Summary of Closed Public Meeting to Discuss a Future Iteration of the Oklo Advanced Reactor Design Project stage: Meeting ML24074A3972024-03-12012 March 2024 Summary of Partially Closed Meeting with Oklo to Discuss Concept of Operations for Oklos Advanced Reactor Design Project stage: Meeting PMNS20240377, Meeting with Oklo to Discuss Physical Security for Its Advanced Reactor Design2024-03-14014 March 2024 Meeting with Oklo to Discuss Physical Security for Its Advanced Reactor Design Project stage: Request ML24226B2492024-09-13013 September 2024 June 25 2024 Oklo Met Data Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting PMNS20241182, Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design2024-09-14014 September 2024 Meeting with Oklo to Discuss Its Planned Approach to Operations for Its Advanced Reactor Design Project stage: Request ML24233A1722024-09-30030 September 2024 April 10 and 11 2024 Oklo Physical Security Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting PMNS20241327, Meeting with Oklo to Discuss the Information Required in a Combined License Application2024-10-18018 October 2024 Meeting with Oklo to Discuss the Information Required in a Combined License Application Project stage: Meeting ML24285A2232024-11-0606 November 2024 Summary of Partially Closed Meeting with Oklo to Discuss Concept of Operations for Oklos Advanced Reactor Design (EPID L-2022-LRM-0042 Project stage: Meeting PMNS20241541, Meeting with Oklo to Discuss Its Proposed Framework for Operator Licensing for Its Advanced Reactors2025-01-0606 January 2025 Meeting with Oklo to Discuss Its Proposed Framework for Operator Licensing for Its Advanced Reactors Project stage: Request ML25045A2152025-01-22022 January 2025 Fleet Model for Licensed Operator Topical Report - Public Project stage: Other ML24355A1352025-01-30030 January 2025 Summary of Meeting with Oklo, Inc., to Discuss Plan for Readiness Assessment for Future License Application Project stage: Meeting ML25045A2162025-04-11011 April 2025 Oklo, Inc., Meeting Summary January 22, 2025 Cover Letter and Enclosure 1 Project stage: Meeting ML25245A2072025-09-0202 September 2025 Oklo Pre-submittal Audit Plan Project stage: Other ML25218A2622025-11-24024 November 2025 July 23 2025 Summary of Partially Closed Meeting with Oklo to Discuss a Proposed Topical Report in the QA Program Description EPID L-2022-LRM-0042 Cover Letter and Enclosure 1 Project stage: Meeting 2024-11-06
[Table View] |
Text
March 12, 2024 MEMORANDUM TO:
William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Donna Williams, Senior Project Manager /RA/
Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE DECEMBER 11, 2023, PARTIALLY CLOSED MEETING WITH OKLO TO DISCUSS CONCEPT OF OPERATIONS FOR OKLOS ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0042)
Meeting Information:
Applicant: Oklo, Inc. (Oklo)
Project No.: 99902095 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML23331A968 Applicant Presentation Slides ADAMS Accession No.: ML24023A288 Meeting Attendees: See Enclosure 1 for a list of meeting attendees.
CONTACT: Donna Williams, NRR/DANU/UAL1 301-415-1322
W. Jessup 2
Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271). Highlights from the meeting included the following:
The NRC staff met with Oklo to discuss the concept of operations proposed for its advanced reactors.
The NRC staff had previously met with Oklo in August 2022 (ML22257A246) to discuss standardized operational programs, including Oklos approach to operations and training and exemptions that may be necessary to support implementation of its approach.
During a subsequent meeting in August 2023, Oklo provided more details on its proposed approach to operations. (ML23240A713)
In November 2023, Oklo shared a draft white paper with the NRC staff regarding its proposed concept of operations. The NRC staff discussed preliminary feedback on the draft white paper during the December 11, 2023, meeting (Enclosure 3).
NRC staff and Oklo discussed aspects of its proposed concept of operations, intended to reflect advanced reactor features. NRC staff identified some aspects of Oklo's approach that may be potentially inconsistent with current regulations and underlying statutory requirements. NRC staff discussed potential ways of navigating the issue. Oklo anticipates requesting exemptions to certain existing regulatory requirements to account for the role of humans in its facilities. Both sides agree that this is an area for further engagement.
Oklo indicated that it plans to evaluate the information provided by the NRC staff during the meeting and will determine the next steps which may include revision of the draft white paper, formal submittal, and possibly an additional meeting.
No regulatory decisions were made as a result of this meeting.
Enclosures:
- 1.
List of Attendees
- 2.
Meeting Notes (proprietary)
- 3.
Preliminary NRC staff feedback on draft WP (proprietary) cc: Oklo Powerhouse via GovDelivery w/o Enclosures 2 and 3
Package ML Letter: ML : ML : ML NRR-106 OFFICE NRR/DANU/UAL1:PM NRR/DRO/IOLB NRR/DANU/UAL1:BC NRR/DANU/UAL1:PM NAME DWilliams LNist WJessup DWilliams DATE 1/11/24 1/19/24 2/20/24 3/12/24
List of Meeting Attendees
SUMMARY
OF THE DECEMBER 11, 2023, PARTIALLY CLOSED MEETING WITH OKLO TO DISCUSS CONCEPT OF OPERATIONS FOR THE OKLOS ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0042)
Name Organization Donna Williams U.S. Nuclear Regulatory Commission (NRC)
Mohsin Ghazali NRC Candace de Messieres NRC Maurin Scheetz NRC Jesse Seymour NRC Theresa Buchanan NRC William Jessup NRC Alex Siwy NRC Trace Orf Oklo, Inc. (Oklo)
Ross Moore Oklo Tyrell Arment Oklo Alex Renner Oklo