ML23312A081

From kanterella
Jump to navigation Jump to search

August 8, 2023, Summary of the Partially Closed Meeting with Oklo to Discuss Safety Analysis for the Oklo Advanced Reactor Design
ML23312A081
Person / Time
Site: 99902095
Issue date: 01/18/2024
From: David Williams
Office of Nuclear Reactor Regulation
To: Jessup W
Office of Nuclear Reactor Regulation
References
EPID L-2022-LRM-0042
Download: ML23312A081 (1)


Text

January 18, 2024 MEMORANDUM TO:

William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:

Donna Williams, Senior Project Manager /RA/

Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE AUGUST 8, 2023, PARTIALLY CLOSED MEETING WITH OKLO TO DISCUSS SAFETY ANALYSIS FOR THE OKLO ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0042)

Meeting Information:

Applicant: Oklo, Inc. (Oklo)

Project No.: 99902095 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)

Accession No.: ML23193A986 Applicant Presentation Slides: ML23226A134 Meeting Attendees: See Enclosure 1 for a list of meeting attendees.

CONTACT: Donna Williams, NRR/DANU/UAL1 301-415-1322

W. Jessup 2

Meeting Summary:

The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271). Highlights from the meeting included the following:

Oklo stated that the goals of this meeting were to provide the NRC staff with updates on progress made regarding its safety analysis approach and receive any additional feedback on this topic prior to a pre-application readiness assessment.

Oklo provided a summary of the interactions held with NRC staff over the last 2 years regarding the topic of safety analysis and described updates and clarifications to its safety analysis approach based on continued development of this approach.

Oklo shared a list of supporting safety analysis documents, to which the discussion was limited, and Oklo indicated that the documents could be made available as part of future licensing submittal reviews. The NRC staff planned to review the list and provide feedback to Oklo on the documents that the NRC staff considers priority to perform its evaluations.

Oklo indicated that it will provide the NRC staff with updates on progress on the safety analysis during future meetings.

The NRC staff and Oklo agreed that no further pre-application interactions were necessary on this topic but this will be a topic that will be addressed during a future readiness assessment.

No regulatory decisions were made as a result of this meeting.

Enclosures:

1. List of Attendees
2. Meeting notes (proprietary) cc: Oklo Powerhouse via GovDelivery w/o enclosure 2 to this letter contains proprietary information. When separated from Enclosure 2, this letter is DECONTROLLED.

Package: ML23312A075 Letter: ML23312A081 : ML23312A083 NRR-106 OFFICE NRR/DANU/UAL1: PM NRR/DANU/UAL1:BC NRR/DANU/UAL1: PM NAME DWilliams WJessup DWilliams DATE 01/09/24 1/18/24 1/18/24

List of Meeting Attendees

SUMMARY

OF THE AUGUST 8, 2023, PARTIALLY CLOSED MEETING WITH OKLO TO DISCUSS SAFETY ANALYSIS FOR THE OKLO ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0042)

Name Organization Donna Williams U.S. Nuclear Regulatory Commission (NRC)

Jason Schaperow NRC Michelle Hart NRC Candace de Messieres NRC Reed Anzalone NRC Alex Siwy NRC Trace Orf Oklo, Inc. (Oklo)

Ross Moore Oklo Pat Everett Oklo Alan Smith Oklo Alex Renner Oklo Amrit Patel Oklo