Letter Sequence Other |
---|
|
|
MONTHYEARML13172A0092013-07-0101 July 2013 Nd 2, Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3) Concerning Significant Emergency Core Cooling System Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation Project stage: Other 2013-07-01
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Report
MONTHYEARML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20091L9852021-05-0404 May 2021 Record of Decision ML20091L9832021-05-0404 May 2021 SLR License ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20076A5762020-05-28028 May 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19163A1542019-06-0606 June 2019 SLRA - Attachment 4D Letter - Draft to Dominion ML19140A2762019-05-20020 May 2019 Essential Fish Habitat Mapper Results for Surry Power Station ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML18108A1232018-04-11011 April 2018 Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) ML17325A7792017-11-22022 November 2017 Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15335A0932015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML15097A0782015-04-0707 April 2015 Soarca Surry 2005 Site File ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 ML15078A2882015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 2023-05-31
[Table view] Category:Miscellaneous
MONTHYEARML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML20091L9832021-05-0404 May 2021 SLR License ML20091L9852021-05-0404 May 2021 Record of Decision ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20076A5762020-05-28028 May 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML19163A1542019-06-0606 June 2019 SLRA - Attachment 4D Letter - Draft to Dominion ML19140A2762019-05-20020 May 2019 Essential Fish Habitat Mapper Results for Surry Power Station ML18108A1232018-04-11011 April 2018 Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) ML17325A7792017-11-22022 November 2017 Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) ML15335A0932015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review ML15097A0782015-04-0707 April 2015 Soarca Surry 2005 Site File ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 ML15078A2872015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 1 Through 2-114 ML15078A2892015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-219 Through the End ML15078A2882015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 ML14251A0352014-08-28028 August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML14086A1942014-04-0909 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14092A4142014-03-31031 March 2014 Response to March 12, 2012 Information Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1 ML13172A0092013-07-0101 July 2013 Nd 2, Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3) Concerning Significant Emergency Core Cooling System Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation ML12293A4512012-10-22022 October 2012 ACRS Assessment of the Quality of Selected NRC Research Projects- Fy 2012 ML12257A0862012-09-20020 September 2012 Review of the 2011 Refueling Outage System Generator Tube Inservice Inspection Report ML12166A1342012-06-27027 June 2012 Closeout of Bulletin 2011-01, Mitigating Strategies. ML12166A5192012-06-14014 June 2012 Transmittal of Final Accident Sequence Precursor (ASP) Analysis ML12073A3852012-03-0808 March 2012 Resources Services, Inc., Notification Letter That Surry Power Station Not Received a Copy of the Waste Shipment Record (Wsr) Signed by the Owner or Operator of the Designated Waste Disposal Site ML12046A8492012-02-27027 February 2012 Review of the Steam Generator Tube Inservice Inspection Report for the Refueling Outage in 2010 ML12024A0782011-12-28028 December 2011 State-of-the-Art Reactor Consequence Analysis (Soarca); Exclusive Summary for the Full NUREG for Peach Bottom and Surry ML1120701442011-07-26026 July 2011 Draft Letter Report, Entitled Risk-Informing EP Oversight: Evaluation of EALs Using Saphia Pilot Study of Peach Bottom and Surry ML1019304172010-05-0606 May 2010 Tritium Database Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML12124A2972010-03-11011 March 2010 Soarca Documents Review/Approval Process ML12124A2962010-02-25025 February 2010 Soarca Peer Review Comments ML0929905702009-10-26026 October 2009 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules ML0921908942009-08-0404 August 2009 Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A ML0820701992008-07-18018 July 2008 Order EA-03-009 Sixty-Day Report Reactor Pressure Vessel Head Inspection Results ML0705903272007-02-27027 February 2007 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0623300712006-08-16016 August 2006 Fitness-for-Duty Program Semi-Annual Performance Data Report ML0634101622006-02-27027 February 2006 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0523501142005-08-22022 August 2005 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0523504842005-08-22022 August 2005 Owner'S Activity Reports ML0518804802005-07-0707 July 2005 Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0514603252005-05-25025 May 2005 .2 & 3, North Anna Power Station Units 1 & 2, Surry Power Station Units 1 & 2 - Nuclear Liability Insurance Endorsement ML0506001202005-02-28028 February 2005 Owner'S Activity Reports ML0505403042005-02-22022 February 2005 Fitness-for-Duty Program Semi-Annual Performance Data Report Correction of Information ML0505300392005-02-21021 February 2005 Fitness-for-duty Program Semi-Annual Performance Data Report ML0424501642004-08-31031 August 2004 Transmittal of Fitness-for-Duty Program Semi-Annual Performance Data Report for Millstone, North Anna, and Surry Power Stations ML0318903372003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Millstone, Nort ML0234303432002-12-0202 December 2002 Response to Request for Additional Information, Dominion'S Reload Nuclear Design Methodology Topical Report ML19094A2461971-11-0404 November 1971 Transmittal of Final Report Concerning the Operating License Review 2023-02-22
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 1, 2013 Mr. David A Heacock President and Chief Nuclear Officer Virginia Electric and Power Company lnnsbrook Technical Center 5000 Dominion Blvd.
Glenn Allen, VA 23060
SUBJECT:
SURRY POWER STATION, UNIT NOS., 1 AND 2- CLOSURE EVALUATION FOR REPORT PURSUANT TO 10 CFR 50.46(a)(3) CONCERNING SIGNIFICANT EMERGENCY CORE COOLING SYSTEM EVALUATION MODEL ERROR RELATED TO NUCLEAR FUEL THERMAL CONDUCTIVITY DEGRADATION (TAC NOS. MF0599 AND MF0600)
Dear Mr. Heacock:
The Virginia Electric and Power Company (Dominion), the licensee for Surry Power Station, Unit Nos. 1 and 2 (SPS), submitted a report pursuant to Title 10 of the Federal Code of Regulations (1 0 CFR) 50.46(a)(3), describing the estimated effect of thermal conductivity degradation on the predicted peak cladding temperature associated with the emergency core cooling system (ECCS) evaluation model for large-break loss-of-coolant accidents in their letter dated July 10, 2012.
The U.S. Nuclear Regulatory Commission (NRC) has completed the review. Upon evaluating the report, the NRC staff has determined that the SPS satisfies the reporting requirements of 10 CFR 50.46(a)(3), and also the intent of the reporting requirements, as discussed in the statement of considerations published on September 16, 1988, in the Federal Register (FR),
for the realistic ECCS evaluations revision of 10 CFR 50.46 (53 FR 35996).
A copy of the Closure Evaluation is enclosed.
If you have any questions regarding this matter, I may be reached at (301) 415-1438 or via e-mail at karen.cotton@nrc.gov.
Sincerely,
~~
Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-280 and 50-281
Enclosure:
As stated cc w/encl: Distribution via Listserv
CLOSURE EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNIT NOS. 1 AND 2
- REPORT DESCRIBING THE NATURE OF AND ESTIMATED EFFECT ON PEAK CLADDING TEMPERATURE OF A SIGNIFICANT EMERGENCY CORE COOLING SYSTEM EVALUATION MODEL ERROR DOCKET NOS. 50-280 AND 50-281
1.0 INTRODUCTION
By letter dated July 10, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12199A061), Virginia Electric and Power Company (Dominion),
submitted a report describing a significant error identified in the emergency core cooling system (ECCS) evaluation model, and an estimate of the effect of the error on the predicted peak
- cladding temperature (PCT) for Surry Power Station (SPS), Unit Nos. 1 and 2. This report was submitted pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 50, Section 46 (1 0 CFR 50.46), paragraph (a)(3).
The U.S. Nuclear Regulatory Commission (NRC, or Commission) staff has evaluated the report, along with its supplemental information, and determined that it satisfies the reporting requirements of 10 CFR 50.46(a)(3), and also the intent of the reporting requirements, as discussed in the statement of considerations published on September 16, 1988, in the Federal Register (FR), for the realistic ECCS evaluations revision of 10 CFR 50.46 (53 FR 35996). The staff review is discussed in the following sections of this closure evaluation.
2.0 REGULATORY EVALUATION
2.1 Requirements Contained in 10 CFR 50.46 Acceptance criteria for ECCSs for light water nuclear power reactors are promulgated at 10 CFR 50.46. In particular, 10 CFR 50.46(a)(3)(i) requires licensees to estimate the effect of any change to, or error in, an acceptable evaluation model or in the application of such a model to determine if the change or error is significant. For the purpose of 10 CFR 50.46, a significant change or error is one which results in a calculated peak fuel cladding temperature different by more than 50 degrees Fahrenheit (°F) from the temperature calculated for the limiting transient using the last acceptable model, or is a cumulation of changes and errors such that the sum of the absolute magnitudes of the respective temperature changes is greater than 50 °F.
Enclosure
For each change to or error discovered in an acceptable evaluation model or in the application of such a model, paragraph (a)(3)(ii) to 10 CFR 50.46 requires the affected licensee to report the nature of the change or error and its estimated effect on the limiting ECCS analysis to the Commission at least annually. If the change or error is significant, the licensee is required to provide this report within 30 days and include with the report a proposed schedule for providing a re-analysis or taking other action as may be needed to show compliance with 10 CFR 50.46 requirements.
2.2 Additional Guidance Additional clarification concerning the intent of the reporting requirements is discussed in the statement of considerations published on September 16, 1988, in the FR for the best estimate loss-of-coolant-accident (LOCA) revision of 10 CFR 50.46 (53 FR 35996):
[Paragraph (a)(3) of Section 50.46] requires that all changes or errors in approved evaluation models be reported at least annually and does not require any further action by the licensee until the error is reported. Thereafter, although re-analysis is not required solely because of such minor error, any subsequent calculated evaluation of ECCS performance requires use of a model with such error, and any prior errors, corrected. The NRC needs to be apprised of even minor errors or changes in order to ensure that they agree with the applicant's or licensee's assessment of the significance of the error or change and to maintain cognizance of modifications mC!de subsequent to NRC review of the evaluation model. ..
Significant errors require more timely attention since they may be important to the safe operation of the plant and raise questions as to the adequacy of the overall evaluation model. .. More timely reporting (30 days) is required for significant errors or changes ...
the final rule revision also allows the NRC to determine the schedule for re-analysis based on the importance to safety relative to other applicant or licensee requirements.
The NRC staff considered the discussion in the Federal Register in its evaluation of the error report submitted by the licensee.
3.0 TECHNICAL EVALUATION
The report submitted by the licensee described the effects of an error in the ECCS evaluation model associated with the degradation of thermal conductivity in nuclear fuel. This issue is discussed in NRC Information Notice (IN) 2009-23, "Nuclear Fuel Thermal Conductivity Degradation," and its potential effects in realistic emergency core cooling system evaluation models are described in IN 2011-21, "Realistic Emergency Core Cooling System Evaluation Model Effects Resulting from Nuclear Fuel Thermal Conductivity Degradation [TCD]."
Based on the nature of the reported error, and on the magnitude of its effect on the PCT calculation, the NRC staff determined that a detailed technical review is necessary .. Based on the regulatory evaluation discussed above, the staff's review was performed to ensure that the NRC staff agrees with the licensee's assessment of the significance of the error, and to enable the staff to verify that the evaluation model, as a whole, remains adequate. Finally, the NRC staff's review also establishes that the licensee's proposed schedule for re-analysis is acceptable in light of the safety significance of the reported error.
Overview of ASTRUM The licensee uses the NRC-approved Automated Statistical Treatment of Uncertainty Method (ASTRUM), documented in WCAP-16009-NP-A (ADAMS Accession Nos. ML050910157, ML050910159, and ML050910161 ), to evaluate ECCS performance. ASTRUM relies on an approach based on order statistics, in which a set number of cases with randomly varied initial conditions are analyzed using the WCOBRAITRAC (WC/T) reactor system analysis code. The number of cases is chosen so that the highest predicted PCT within the case set becomes a predictor of the 95/95 upper tolerance limit for the PCT associated with a hypothetical populations of LOCA scenarios. The result is used to show compliance with the 10 CFR 50.46(b)(1) acceptance criterion concerning PCT.
3.1 SUMM~RY OF TECHNICAL INFORMATION IN THE REPORT The licensee's report indicated that the effect of the TCD error was 183 oF for Units 1 and 2.
The nature of the error, and the method used to estimate its effect on the calculated peak fuel cladding temperature, is discussed in greater detail in Attachment 3 to the licensee's July 10, 2012, report. The report also disclosed the estimated effect of a model change to account for a non-uniform pellet radial profile, which had an estimated effect of -13 oF on the predicted peak' cladding temperature.
TCD Error Correction The error in the ECCS evaluation model was caused by the inability of the Westinghouse Improved Fuel Rod Performance and Design (PAD 4.0) fuel performance model to account for the effects of TCD with increasing fuel burnup. This error caused fuel temperature initial conditions to be non-conservatively low for higher burn up fuel rods that were analyzed in the ECCS evaluation. In order to correct for the error, a burnup-dependent term was added to the nuclear fuel thermal conductivity equation, which caused the predicted initial fuel temperatures to compare better with experimental data obtained from the Halden Reactor Projed. The results from the modified PAD (PAD 4.0 + TCD) code were then used to re-initialize the WC/T cases that are performed in execution of ASTRUM.
- Note that the TCD correction also includes a peaking factor burndown effect, which captures a reduction in the core peaking factors that naturally occurs through fuel life. This phenomenon partially offsets the net effect of TCD by lowering the initial stored energy in the fuel.
Estimation of the Effect of TCD in the PCT Calculation In order to estimate the PCT effect of the TCD error correction, the licensee systematically identified a subset of 45 cases within the ASTRUM analysis that had the potential to produce a limiting result, once corrected for TCD. These cases were re-analyzed within WC/T, using the adapted initial conditions described above. The following passage from Section 3.0 of to Dominion's July 10, 2012, letter, describes this process in greater detail:
1 Although comparisons of PAD 4.0 and PAD 4.0 + TCD predictions to Halden Reactor measurements and data are Westinghouse proprietary information, related information and similar comparisons are available from the NRC's FRAPCON computer code in NUREG/CR-7022, "FRAPCON-3.4: Integral Assessment" See in particular Chapter 3 of NUREG/CR-7022.
To estimate the effect of fuel TCD and peaking factor burndown, a total of 45 WCOBRA/TRAC [WC/T] executions were performed. The uncertainty attributes of these executions were taken from among the most limiting cases from the original 124-run ASTRUM analysis. The evaluation considered an adequate range of burnup such that the effects of TCD and related burn up effects were captured ...
The estimated effect of TCD was then taken as the difference between the maximum PCT when considering the effects of fuel TCD and peaking factor burn down and the 95/95 PCT from the Surry ASTRUM analysis with 15x15 Upgrade Fuel.
Reported Results
- Following the correction for TCD and the model change, the current predicted PCT for SPS Units 1 and 2 is 2037 °F. The licensee also stated that Dominion will conduct a re-analysis following approval by the NRC of a revised large-break loss-of-coolant accident (LBLOCA) evaluation model that includes the effects of TCD and accommodates the 10 CFR 50.46(c) rulemaking process.
3.2 Summary of Staff Evaluation In its evaluation, the NRC staff reviewed (1) the approach used to estimate the effects of TCD, (2) the estimated effect of TCD at both units, and (3) the licensee's schedule for re-analysis in consideration of the approach used to estimate the effects of TCD. As discussed in the following paragraphs, the NRC staff determined that the licensee's estimate and proposal for re-analysis are acceptable.
To estimate the effects of TCD, the licensee used a modified uranium thermal conductivity model to account for TCD, andre-executed the most sensitive WC/T cases using inputs from the revised thermal conductivity model. The explicit fuel performance model is described in a March 7, 2012, Westinghouse letter to the Commission (ADAMS Accession No. ML12072A036). A proprietary enclosure to the Westinghouse letter also provides information to show that the modified uranium thermal conductivity model more accurately reflects available high-burnup data, as described in Section 3.1 in this evaluation. The NRC staff also notes that the licensee has examined the ASTRUM run set to identify the WC/T cases with potential to be most significantly affected by TCD, and explicitly re-analyzed these cases with initial conditions that accurately capture the TCD phenomenon.
The NRC staff has reviewed estimating techniques for the same phenomena in the generically approved ASTRUM evaluation model for several other licensing actions. In a recent request for extended power uprate, the licensee addressed a staff request for additional information by identifying a limiting subset of cases to re-execute, and then by completely re'-executing the entire ASTRUM run set. In this investigation, the original, limited set of cases contained the new limiting PCT. Also, s~veral reports submitted pursuant to 50.46 have provided TCD effect estimates by re-executing a more limited subset of the original ASTRUM run set. In the case of the uprate, the NRC staff concluded that the licensee had acceptably accounted for the effects of TCD in its ECCS evaluation; in the case of the 50.46 reports, the NRC staff determined that the estimates provided in the reports satisfied the applicable reporting requirements.
Based on the following considerations: (1) The PAD 4.0 + TCD and revised HOTSPOT fuel performance models generate fuel stored energy initial conditions that in reasonable agreement with available high burnup data, and (2) the licensee has identified the limiting WC/T cases and re-executed them using the revised fuel performance models, the NRC staff concludes that the licensee's estimate of the effects of TCD is acceptable. The NRC staff also notes, as discussed above, that this approach has been applied previously at other licensed facilities and accepted by the staff.
- The estimated effect of TCD at Surry is 183 oF for Units 1 and 2. Recently received explicit estimates of the effects of TCD using the ASTRUM evaluation model have ranged from 73 oF to 384 oF; these estimates fall within that range. The updated PCTs, which also include the effect of the pellet radial power profile change, are 2037 oF for Units 1 and 2, which fall within the regulatory acceptance criterion of 2200 oF. Because the effect of TCD is consistent with other, similar estimates, and because the updated PCTs meet the 10 CFR 50.46(b)(1) acceptance criteria, the staff did not identify any significant issues with the estimates.
In its cover letter, Dominion stated the following:
Before June 15, 2017, Dominion will submit to the NRC for review and approval a LBLOCA analysis that applies NRC-approved methods that include the effects of fuel TCD. The date for the analysis submittal is based on the following milestones, which must be completed in order to perform a revised licensing basis LBLOCA analysis with an NRC-approved ECCS EM that explicitly accounts for TCD:
- 1. NRC approval of a fuel performance analysis methodology that includes the effects of TCD. The new methodology for developing inputs to the LBLOCA EM would replace the current SPS licensing basis methodology in WCAP-15063-P-A, Revision 1, which is referenced in Section 3.4 of the SPS Updated Final Safety Analysis Report (UFSAR).
- 2. NRC approval of a LBLOCA EM that includes the effects of TCD and accommodates the ongoing 10 CFR 50.46(c) rulemaking process. The new methodology would replace the current licensing basis analysis methodology in WCAP-16009-P-A, which is referenced in Section 14.5 of the SPS UFSAR.
10 CFR 50.46(a)(3)(ii) states, in part, that the licensee "shall include with the report a proposed schedule for providing a re-analysis or taking other action as may be needed to show compliance with [1 0 CFR] 50.46 requirements." As described in the Regulatory Evaluation, the statements of consideration explain further that "the final rule revision also allows the NRC to determine the schedule for re-analysis based on the importance to safety relative to other applicant or licensee requirements." The NRC staff determines herewith, based on the provided date of prior to June 15, 2017, the licensee will submit to the NRC for review and approval a LBLOCA that applies NRC-approved methods that include the effects of fuel TCD, that the re-analysis requirement is satisfied.
In summary, the NRC staff reviewed the licensees report estimating the effect of TCD on the large break LOCA analyses for SPS, Units 1 and 2. Based on the technical rigor employed by the licensee, which included correcting the TCD error using a model that agrees with available experimental data and explicitly re-evaluating a limiting subset of WC/T cases, the NRC staff
concluded that the TCD estimate was acceptable. The NRC staff did determine that the licensee satisfied the re-analysis requirement set forth in 10 CFR 50.46(a)(3)(ii) providing a re-analysis submittal date of June 15, 2017.
4.0 CONCLUSION
Based on the considerations discussed above, the NRC staff finds that the report* submitted pursuant to 10 CFR 50.46(a)(3), concerning an ECCS evaluation model error pertaining to TCD, satisfies the intent of the 10 CFR 50.46 reporting requirements. The report and supplemental information enabled the staff to ( 1) determine that it agrees with the licensee's assessment of the significance of the error, (2) confirm that the evaluation model remains adequate, and (3) verify that the licensee continues to meet the PCT acceptance criterion promulgated by 10 CFR 50.46(b). The licensee did include a proposed schedule for providing a re-analysis, June 15, 2017, the NRC staff did conclude that the licensee satisfied this aspect of the 10 CFR 50.46(a)(3)(ii) reporting requirement.