Letter Sequence Request |
---|
EPID:L-2022-LLR-0084, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 (Open) |
|
MONTHYEARCNL-22-024, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-03-15015 March 2022 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 Project stage: Request ML22342B2482022-12-0808 December 2022 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Project stage: Request ML22343A0002022-12-0909 December 2022 Response to Request for RAI on ASME Operation & Maintenance Code Inservice Testing Program - Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Project stage: Request ML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information Project stage: Request ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Project stage: Other 2022-03-15
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information ML23096A1972023-04-0606 April 2023 License Amendment Request - Application of Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure - Response to Request for Additional Information ML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML23089A3542023-03-30030 March 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23044A0392023-02-11011 February 2023 Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles Response to Request for Additional Information ML23025A1252023-01-25025 January 2023 Response to Request for Additional Information License Amendment Request, NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure ML22343A0002022-12-0909 December 2022 Response to Request for RAI on ASME Operation & Maintenance Code Inservice Testing Program - Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML22342A4242022-12-0707 December 2022 Response to 3/12/2012 Request for Information Enclosure 2, Recommendation 2.0, Flooding Focused Evaluation Integrated Assessment Submittal Revised Commitment Completion Date ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI ML22300A1882022-10-27027 October 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Response to Request for Additional Information ML22220A2162022-08-0808 August 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater (AFW) Cross-Connect Capability Supplemental Information ML22164A8532022-06-13013 June 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation ML22153A1352022-06-0202 June 2022 Proposed License Amendment Request (LAR) - Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Additional Information ML21292A3022021-10-19019 October 2021 Response to Question on License Amendment Request to Revise Reactor Core Safety Limit ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21133A4212021-05-13013 May 2021 Response to NRC Request for Additional Information Regarding Proposed License Amendment Request Update of LOCA Alternative Source Term Dose Analysis ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21098A2612021-04-0808 April 2021 Subsequent License Renewal Application, Response to Request for Additional Information Re Environmental Review ML21084A2732021-03-24024 March 2021 License Amendment Request - Application of Leak-Before-Break Methodology to Reactor Coolant System Branch Piping - Response to Request for Additional Information and Clarification ML21056A5412021-02-25025 February 2021 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response ML21042B9262021-02-11011 February 2021 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative Requests S1-I5-ISl-05 and S2-I5-ISl-06 - Response to Request for Additional Information ML22040A1012021-02-0909 February 2021 Response to Request for Additional Information 2021 Steam Generator Inservice Report ML20296A7272020-10-22022 October 2020 Stations Units 1 & 2 - Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break LOCA Supplement to the Response to Request for Additional Information ML20247J6352020-09-0303 September 2020 Virginia Electric & Power Co - Subsequent License Renewal Application (SLRA) Environmental Review, Response to Request for Additional Information Concerning Aquatic Resources ML20181A4222020-06-29029 June 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Response to Request for Additional Information ML20181A3082020-06-23023 June 2020 Response to Request for Additional Information on 2019 Steam Generator Inservice Inspection Report ML20269A4072020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 2 of 3 ML20269A4062020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 3 of 3 ML20269A4082020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 1 of 3 ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20034F0532020-01-31031 January 2020 Proposed License Amendment Request: Allowed Outage Time Extension for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F Response to Request for Clarification and Additional Information ML19350A0042019-12-12012 December 2019 License Amendment Request Addition of 24-Hour Completion Time for an Inoperable Reactor Trip Breaker Response to NRC Request for Additional Information ML19283B6222019-10-10010 October 2019 Subsequent License Renewal Application Safety Review - Documentation of Draft Third Round Requests for Additional Information ML19291B0342019-10-0101 October 2019 Response to March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding Focused Evaluation/Integrated Assessment Submittal ML19269B7342019-09-19019 September 2019 Subsequent License Renewal Application - Response to Requests for Additional Information - Sets 3 and 4 Revised SLRA Mark-Ups ML19267A0422019-09-16016 September 2019 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information Set 2 ML19253B3302019-09-0303 September 2019 Response to Requests for Additional Information - Sets 3 and 4 - Subsequent License Renewal Application ML19249B7672019-08-29029 August 2019 Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs ML19204A3572019-07-17017 July 2019 Subsequent License Renewal Application Response to Request for Additional Information - Set 2 ML19198A0592019-07-11011 July 2019 Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19183A3862019-06-27027 June 2019 Subsequent License Renewal Application - Response to Requests for Additional Information - Set 1 ML19148A4212019-05-10010 May 2019 All Enclosures with Coversheets ML18304A3302018-10-25025 October 2018 Proposed License Amendment Request TSTF-490 & Update of Alternative Source Term Analyses Response to Request for Additional Information & Revised Proposed Technical Specifications ML18302A1212018-10-18018 October 2018 Response to Request for Additional Information, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules ML18303A2882018-10-18018 October 2018 Response to Request for Additional Information Regarding Relief Request S2-I5-LMT-P01 Examination Category R-A, Preservice Weld Examinations ML18267A0682018-09-18018 September 2018 Attachment - Response to Request for Clarification on Proposed Consolidated Emergency Operations Facility License Amendment Requests ML18212A2192018-07-25025 July 2018 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the First Period of the Fifth 10-Year Inservice Inspection Interval Response to Request for Additional Information 2023-08-07
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 9, 2022 10 CFR 50.55a U.S. Nuclear Regulatory Commission Serial No.: 22-374A ATTN: Document Control Desk NRA/GDM: R0 Washington, D.C. 20555-0001 Docket No.: 50-280 License No.: DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 ASME OPERATION AND MAINTENANCE (OM) CODE INSERVICE TESTING PROGRAM - REQUEST FOR APPROVAL OF ALTERNATIVE REQUEST V-01 USE OF MECHANICAL AGITATION PROCESS FOR PRESSURE ISOLATION VALVE 1-SI-241 SEAT LEAKAGE TESTING RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION By letter dated December 8, 2022 (ADAMS Accession No. ML22342B248), Virginia Electric and Power Company (Dominion Energy Virginia) submitted Alternative Request V-01 for the use of a mechanical agitation process for pressure isolation valve (PIV) 1-SI-241 seat leakage testing for Surry Unit 1 under 10 CFR 50.55a(z)(2) as a hardship alternative to specific ASME OM Code requirements for PIV 1-SI-241.
Dominion Energy Virginia requested NRC review of Alternative Request V-01 and, if possible, verbal authorization of the proposed alternative by 9:00 am EST on December 9, 2022, to support Surry Unit 1 startup activities.
By email dated December 8, 2022, 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br />, the NRC Project Manager for SPS provided a request for additional information (RAI) associated with the proposed alternative request for the NRC staff to complete its review. The NRC RAI and the associated Dominion Energy Virginia response are provided in the attachment.
Should you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.
Respectfully, James E. Holloway Vice President - Nuclear Engineering and Fleet Support
Attachment:
Response to NRC Request for Additional Information Associated with IST Alternative Request V-01
Serial No. 22-374A Docket No. 50-280 IST Alternative Request RAI Response Page 2 of 2 Regulatory commitments contained in this correspondence:
- 1. PIV 1-SI-241 will be internally inspected and repaired or replaced prior to startup from the next SPS Unit 1 RFO (1R32).
- 2. The mechanical agitation of 1-SI-241 at SPS Unit 1 will implement the process specified in the section Recommendations for Future Application of Mechanical Agitation to Seat Valve 1-SI-241 for Alternative Request V-01.
cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303 Mr. John J. Klos - Surry NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852 Mr. G. Edward Miller - North Anna NRC Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector Surry Power Station
Serial No. 22-374A Docket No. 50-280 Attachment RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION ASSOCIATED WITH ALTERNATIVE REQUEST V-01 USE OF MECHANICAL AGITATION PROCESS FOR PRESSURE ISOLATION VALVE 1-SI-241 SEAT LEAKAGE TESTING Virginia Electric and Power Company (Dominion Energy Virginia)
Surry Power Station Unit 1
Serial No. 22-374A Docket No. 50-280 Proposed IST Alternative Request V-01 RAI Response Attachment RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION Alternative Request V-01 for Use of Mechanical Agitation Process on Pressure Isolation Valve 1-SI-241 Seat Leakage Testing NRC Comment At 5:05 pm EST on December 8, 2022, Dominion Energy Virginia (licensee) submitted Alternative Request V-01 for the use of a mechanical agitation process for pressure isolation valve (PIV) 1-SI-241 seat leakage testing for Surry Unit 1 under 10 CFR 50.55a(z)(2) as a hardship alternative to specific ASME OM Code requirements for PIV 1-SI-241. The licensee requested NRC review of Alternative Request V-01 and, if possible, verbal authorization of the proposed alternative by 9:00 am EST on December 9, 2022, to support Surry Unit 1 startup activities.
For the NRC staff to complete its review of Alternative Request V-01 in the requested timeframe, the licensee needs to respond to the following items:
RAI Question No. 1 As indicated in the alternative request, the licensee mechanically agitated 1-SI-241 at Surry Unit 1 in the spring of 2006 (1R20) following the identification of seat leakage greater than 5 gpm. The licensee again agitated 1-SI-241 in the spring of 2021 (1R30) following the identification of seat leakage greater than 25 gpm. As corrective action, the licensee planned to internally inspect and repair 1-SI-241 during the current RFO (1R31), but decided to proceed with startup activities without performing the corrective action. With the degradation indicated by the increasing leakage of 1-SI-241 over time and the performance of multiple instances of mechanical agitation of 1-SI-241, please specify that 1-SI-241 will be internally inspected and repaired prior to startup from the next RFO (1R32).
Dominion Energy Virginia Response Dominion Energy Virginia confirms that PIV 1-SI-241 will be internally inspected and repaired or replaced prior to startup from the next SPS Unit 1 RFO (1R32).
RAI Question No. 2 In the first sentence of Section 6.B of the alternative request, the licensee states that it has performed an engineering evaluation similar to the TVA precedent. Please confirm that the results of your engineering evaluation demonstrate that the mechanical agitation will not damage 1-SI-241.
Page 1 of 2
Serial No. 22-374A Docket No. 50-280 Proposed IST Alternative Request V-01 RAI Response Attachment Dominion Energy Virginia Response The Dominion Energy Virginia engineering evaluation documents that 1-SI-241 is the same make/model as the 6 check valve evaluated by TVA (same thickness, same material) and that the results from the TVA analysis therefore apply to 1-SI-241 assuming mechanical agitation is performed applying the same approach, which is required by the proposed alternative. Therefore, Dominion Energy Virginia confirms that the results of our engineering evaluation demonstrate that mechanical agitation will not damage 1-SI-241.
RAI Question No. 3 In Attachment 2 to Surry Alternative Request V-01, the licensee includes a section titled where the licensee lists guidance for mechanical agitation that has been authorized by the NRC in the precedent referenced in Surry Alternative Request V-01. Please confirm that the mechanical agitation of 1-SI-241 at Surry Unit 1 will implement the process specified in this section of Recommendations for Future Application of Mechanical Agitation to Seat Valve 1-SI-241 for Alternative Request V-01.
Dominion Energy Virginia Response Dominion Energy Virginia confirms that the mechanical agitation of 1-SI-241 at SPS Unit 1 will implement the process specified in the section Recommendations for Future Application of Mechanical Agitation to Seat Valve 1-SI-241 for Alternative Request V-01.
Page 2 of 2