VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2326 1 August 22, 2005 U.S. Nuclear Regulatory Commission Serial No.05-472 Attention: Document Control Desk NLOS/GDM RO Washington, D.C. 20555 Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 OWNERS ACTIVITY REPORTS By letter dated October 2, 2000, the NRC granted approval to use the recording and reporting requirements of American Society of Mechanical Engineers (ASME) Code Case N-532, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division I , for Surry Power Station Units 1 and 2. Therefore, in accordance with the requirements of ASME Code Case N-532, the Owners Activity Reports (Form OAR-I) for Surry Unit 2 refueling outages S2R17, S2R18 and S2R19 are provided in Attachment 1. Surry Unit 2 extended the end of the third interval by one year as allowed by the ASME Section XI Code to complete the Ten-Year Reactor Vessel Examination and various other inservice inspection exams.
This information completes the reporting requirements for the third period of the third ten-year inservice inspection (ISI) interval for Surry Unit 2.
Also, Surry Unit 2 simultaneously entered the fourth ten-year IS1 interval on May 10, 2004. Therefore, the Form OAR-I , completed through the duration of the S2R19 refueling outage as allowed by Code Case N-532-1 for the fourth interval IS1 exams, is provided in Attachment 2.
Should you have any questions regarding this submittal, please contact Mr. Gary Miller at (804) 273-2771.
Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Attach ments Commitments made in this letter: None
Serial No.05-472 Docket No. 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 Mr. R. E. Martin NRC Lead Project Manager - North Anna and Surry U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9 Rockville, MD 20852 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station
ATTACHMENT 1 Owner's Activitv ReDorts (Form OAR-1) for Surrv Unit 2 Refuelina Outaaes S2R17. S2R18 and S2R19 Third Ten-Year lnservice InsDection Interval Virginia Electric and Power Company (Dominion)
Surry Power Station Unit 2
SURRY POWER STATION, S2 R17 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 P
aln-t Rd . S u p , VA 33883 Unit No. 2 Commercial service date 05/01/73 Refueling outage no. S2 R17 Current inspection interval @
Current inspection period ?d Edition and Addenda of Section XI applicable to the inspection plan 1989 Edition Date and revision of inspection plan IS1 Program Revision 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspectionplan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Ownets Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures representedby this report conform to the requirements Or Section XI.
Certificate of Authorization No. N/A Expiration Date N/A Signed .
(If applicable)
$lJ PV, (Ownet's or Owner's Besignee, Title)
/s.Sr^dLjs/. Dale 7 ~6 a*,-
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Viminia and employed by -
HSB CT of Hartford. CT have inspected the items describedin this Ownet's Activity Report, during the period 11/3/00 to 4/22/02 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirementsof Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind an'sing from or connectedwith this inspection.
Commissions VA 883(R)
, insp/ecttbsSignature National Board, State, Province, and Endorsements
SURRY POWER STATION UNIT 2 S2 R17 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Examinations Date for The
- This number reflects only the examinations completed during this report period 11/3/00 to 4/22/02.
- This percentage reflects total examinations completed within the present Third Period through 4/22/02.
Note 1: Deferral to the end of the Interval is permissible.
Note 2: Total examinations required may change based on when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The Class 1 leakage test is required to be performed every refueling outage and was performed on 4/18/02 for this report period. The numbers and percentages represent the total number of refueling outages in the 3rdInterval.
Note 4: The numbers and percentages represent the total number of periods over the inspection interval.
Note 5: The Risk Informed Program became effective during the 3rdPeriod. Numbers are for the 3rdPeriod only. VT-2s are completed in accordance with the System Pressure Test Program.
Note 6: Code Case N-509 was implemented, which skewed completion percentages.
SURRY POWER STATION UNIT 2 S2 R17 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found During Scheduled Section XI Exam Item Flaw Characterization Exam or Test Category Number Item Description (IWA-3300) (Yes or No)
None for this reporting period.
SURRY POWER STATION UNIT 2 S2 R17 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Note: The following Station Plant Issues (PI) were submitted to report missing documentation needed for work order closeout:
PI-S-2004-2501 R3 PI-S-2004-2501 R4 PI-S-2004-2642 P1-s-2004-0932
SURRY POWER STATION, S2 R18 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 7-3-3-7
.+
(1 In1 .
?rd I nterval 3 rd .
erln y d Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 P
aln-t Rd . Siirry, V A 73883 Unit No. 2 Commercial service date 05/01/73 Refueling outage no. S2 R 1 8 Current inspection interval ?d Current inspection period -P Edition and Addenda of Section XI aDDlicable to the inspection Dlan 1989 Edition Date and revision of inspection plan IS1 Program Revision 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATEOF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations. tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate d Authorization No. N/A Expiration Date N/A (If applicable)
I c
Signed S~PW, tcsrd.Zusp. Date 7 Zd/Oa (Owner's or Owner's Designee, l'itle)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Pwince of Viminia and employed by HSB CT- of Hartford. CT have inspected the items described in this Ownet's Activity Report. during the period 04/23/02to 12/03/03 , and state that to the best of my knowledge and belief. the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore. neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
v -- Inspector's Signature Commissions VA 883(R)
National Board, State, Province, and Endorsements Date 7 I
SURRY POWER STATION UNIT 2 S2 R18 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (O/O) To Examination Required for Credited for Credited (%) Date for The Category The Interval This Period* For The Interval Remarks Period**
B-A 10 0 3yo 15% Note 1 B-B 5 2.33 I 47% I 100% I B-D 24 1 I 8Yo I 67% I B-E 8 0 I 54% I looo/o I B-G-1 325 0 23% 90% Note 2 B-G-2 26 4 25% 100%
B-K 22 4.5 38% 100%
B-L-1 1 1 100% 100% Note 1 B-L-2 1 0 I 0% I 100% I Note 2 B-M-2 7 0 I 0% I 100% I Note 2 B-N-1 3 0 0% 66%
B-N-2 1 0 0% 0% Note 1 B-N-3 1 0 0Yo 0Yo Note 1 B-0 0 0 I 0% I 0% I Notes 1.3 B-P 7 1 28% 100% Note 4 B-Q ~~
7 1 28% 100%
C-A 9 1.66 25% 100% Note 8 C-B 14 4.66 38% 100%
c-c 24 3 33% I 100%
C-F-1 124 16 I 34% I 99% I C-F-2 22 5 I 41Yo I 100% I C-G 1 0 0% 0Yo ~ Note 7 C-H 3 0 0% 66%
_ . Note
_ 5~ _
D-A 17 7 64% 100% Note 9 D-B 4 ~~
0 25% 100% Note 9 F-A 230 36 35% 99%
R-A 38 28 92% 92% Note 6
- This number reflects only examinations completed during this report period 4/23/02 to 12/03/03.
- This percentage reflects total examinations completed within the Third Period through 12/03/03.
Note 1: Deferral to the end of the Interval is permissible.
Note 2: Total examinations required may change based on when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The reactor vessel head was replaced during this refueling outage. All new welds received preservice examination.
Note 4: The Class 1 leakage test is required to be performed every refueling outage and was performed on 11/11/03 during this report period. The numbers and percentages represent the total number of refueling outages that occurred during the 3rdInterval.
Note 5: The numbers and percentages represent the total number of periods over the inspection interval.
Note 6: The Risk Informed Program became effective during the 3rdPeriod. Numbers are for 3rdPeriod only.
VT-2s are completed in accordance with the System Pressure Test Program.
Note 7: The class 2 pump casing weld requirement is being reevaluated during the R19 RFO per Dominion Letter No.04-337 to the NRC dated June 28, 2004.
Note 8: Relief Request SR-029 was granted 5/24/02 and subsequently implemented. This relief reduced the overall total requirement for this category and skewed completion percentages.
Note 9: Code Case N-509 was implemented, which skewed completion percentages. The numbers and percentages do not include tally of Class 3 pressure tests which are scheduled to be performed by the end of each period. Numbers and percentages do not reflect VT-2 requirements carried by the Pressure Test Program.
SURRY POWER STATION UNIT 2 S2 R18 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found During Scheduled Section XI Exam Item Flaw Characterfzation Exam or Test Category Number Item Description (I WA-3300) (Yes or No)
None for this reporting period.
SURRY POWER STATION UNIT 2 S2 R18 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Note: The following Station Plant Issues (PI) were submitted to report missing documentation needed for work order closeout:
PI-S-2004-2501R3 PI-S-2004-2501R4 Pl-S-2004-2642 PI-s-2004-0932 PI-S-2004-4538
SURRY POWER STATION, S2 R19 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 7-3-3-34.hd
. q d
. ntMlal 3 rd . rd . .
1)
Owner Virginia Electric and Power Company, 5000 Dominion 8oulevard, Glen Allen, VA 23060 P l a n t l w m 3 Unit No. 2 Commercial service date 05/01/73 Refueling outage no. S2 R19 Current inspection interval ?fd Current inspection period !2d Edition and Addenda of Section XI applicable to the inspection plan 1989 Edition Date and revision of inspection plan IS1 Program Revision 4 Chg 01 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this reporl conform lo the requirements of Section XI.
I Certificate of Authonzation Authorization No. N/A Expiration Date N/A Signed a (If applicable) amlicable)
JdPV.
(Ownets or Ownets Designee, Title)
&5r s' 7-4 5- Date I
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, hdding a valid commission issued by the National Board of Boiler and Pressure Vessel lnspecton and the State or Province of Virainia and employed by HSB - CT of Hartford. CT have inspected the items described in this Owner's Activity Report, during the period 12/4/03 to 5/23/05 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore. neither the inspector nor his employer shall be liable, in any manner tor any personal injury or properly damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R)
Inspector's Signature National Board. State, Province. and Endorsements
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) To Examination Required for Credited for Credited ( O h ) Date for The Category The Interval This Period* For The Interval Remarks Period**
B-A 10 8.5 I 88% I 100% I Note 1 , 1 1 , I2 B-B 5 0 47% 100%
B-D 24 8 37% 100%
B-E 8 0 54% 100%
B-G-1 293 0 25% 100% Note 2 B-G-2 26 0 25% 100%
B-K 22 0 38% 100%
B-L-1 1 0 100% 100% Note 1 B-L-2 1 0 0% 100% Note 2 B-M-2 7 0 I 0% I 100% I Note 2 6-N-1 3 1 33% 100%
B-N-2 1 1 100% 100% Note 1 6-N-3 1 1 100% 100% Note 1 B-0 0 0 0% 0Yo Notes 1, 3 B-P 7 0 20% 100% Note 4 B-Q 7 0 28% 100%
C-A 9 0 25% 100% Note 8 C-B 14 0 38% 100%
c-c 24 0 33% 100%
C-F-1 124 1 35% 100% Note 1 1 C-F-2 22 0 41 Yo 100%
C-G 30 30 100% 100% Note 7 C-H 3 1 33% 100% Note 5,10 D-A 17 0 64% 100% Note 9,10 D-B 4 0 25% 100% Note 9,10 F-A 230 2 36% 100%
R-A 3 100% 100% Note 6
- This number reflects only examinations completed during this report period 12/04/03 to 5/23/05.
- This percentage reflects total examinations completed within the Third Period.
Note 1: Deferral to the end of the Interval is permissible.
Note 2: Total examinations required may change based on when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The reactor vessel head was replaced during the R18 refueling outage. New CRDs will be included in next period tallies.
Note 4: The Class 1 leakage test is required to be performed every refueling outage. The numbers and percentages represent the total number of refueling outages that occurred during the 3rdInterval. All Class 1 3rd Interval Pressure Testing was completed by November 11, 2003.
Note 5: The numbers and percentages represent the total number of periods over the inspection interval.
Note 6: The Risk Informed Program became effective during the 3 Period. Numbers are for 3rdPeriod only.
VT-2s are carried by the System Pressure Test Program.
Note 7: 2-SI-P-1B was disassembled and inspected to meet this category requirement per Dominion letter No.04-337 to the NRC dated June 28, 2004.
Note 8: Relief Request SR-029 was granted 5/24/02 and subsequently implemented. This relief reduced the overall total requirement for this category and skewed completion percentages.
Note 9: Code Case N-509 was implemented, which skewed completion percentages.
Note 10: All Class 2 and 3 Pressure Tests were completed by April 28, 2005.
Note 11: Partial relief is required. The following are pending partial relief requests:
PRT-001 Category B-A Weld 1-01 RX Vessel Flange to Upper Shell PRT-002 Category B-A Weld 1-04 RX Vessel Shell to Lower Head PRT-003 Category C-F-1 CircumferentialWeld 2-26 Note 12: Plant Issue S-20053892 submitted.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found During Scheduled Section XI Exam Item Flaw Characterization Exam or Test Category I Number 1 Item Description (I WA-3300) (Yes or No)
I I I
B-D 83.90 Weld 2-15 Reactor Vessel Nozzle to Shell Evaluated by Westinghouse Weld letter VRA-05-13 May 9, 2005 Revision 1 June 2005*
- This flaw was reported to the NRC by Dominion letter No.05-384, July 14, 2005.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Condition Found Repair, During Replacement, Scheduled Date RIR Code or Corrective Item Description Description of Work Section XI Completed Plan #
Class Measure Examination or The 4th Interval Repair/Replacement Program went into affect May 10, 2004. All work performed during this period is carried in the Interval 4 Program.
ATTACHMENT 2 Owner's Activitv ReDort (Form OAR-1) for Surrv Unit 2 Refuelina Outaae S2R19 Fourth Ten-Year lnservice InsDection Interval Virginia Electric and Power Company (Dominion)
Surry Power Station Unit 2
SURRY POWER STATION, S2 R19 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 Unit No. 2 Commercial service date 05/01/73 Refueling outage no. S2 R19 Current inspection interval Alh Current inspection period 1st Edition and Addenda of Section XI applicable to the inspection plan 1998/2000 Edition Date and revision of inspection plan IS1 Plan Revision 1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No. NIA Expiration Date NIA (If applicable)
Signed Date '7 t 6 05-CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, hdding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virainia and employed by HSB CT- of Hartford, CT have inspected the items described in this Owner's Activity Report, during the period 5110104 to 5/23/05 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests. repairs. replacements, evaluations and corrective measures described in this report. Furthermore. neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R)
I -
Inspector's Signature National Board, State, Province, and Endorsements Note: ANll has Open Item CS 04-04 for this reporting period.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited ( O h ) To Examination Required for Credited for Credited (%) Date for The Category The Interval This Period* For The IntervaI Remarks Period**
B-A 9 0 0% 0%
6-6 .83 12% 12%
B-D 36 2 5% 5%
B-G-1 344 80 23% 23%
B-G-2 94 4 4% 4%
B-K 22 1 4% 4%
B-L-1 1 0 0% 0%
B-L-2 1 0 0% 0%
B-M-2 7 1 14% 14%
B-N-1 3 0 0% 0Yo B-N-2 1 0 0% 0%
B-N-3 1 0 0% 0%
B-0 3 0 0% 0Yo B-P 7 1 14% 14% Note 1 B-Q 7 1 14% 14%
C-A 9 .66 7% 7%
C-B 14 2.66 19% 19%
c-c 25 0% 0%
C-F-1 126 5 4%
C-F-2 39 3 7% 7%
C-G 2 0 0% 0Yo C-H 3 0 0% 0Yo Note 2 D-A 19 7 37% 37%
D-B 3 0 0% 0% Note 2 F-A 258 38 14%
R-A 66 13 19%
- This number reflects only examinations completed during this report period 12/04/03 to 5/23/05.
- This percentage reflects total examinations completed within the 1st Period.
Note 1 The Class 1 Leakage test is performed every refueling outage and was completed on May 21, 2005.
Note 2 The numbers represent total number of periods over the inspection Interval.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found During Scheduled Section XI Exam Item Flaw Characterization Exam or Test Category Number Item Description (IWA-3300) (Yes or No)
None for this reporting period.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Item Description I wall leak - I I 2 I Replacement I 2-RC-TV-2519A Replace bonnet No I 05/09/05 I 05-231 assembly 2 Replacement 2-MS-382* Replace tubing No 05/09/05 05-012 2 Repair 2-MS-381* Weld repair through No 1 1/26/04 04-299 wall leak 2 Replacement 2-CH-267 Replace valve No 05113/05 05-223 2 Replacement 2-CH-FE-2180 Replace fasteners Yes 05/07/05 05-198 2 Replacement 2-CH-TK-2 Replace fasteners Yes 05/05/05 05-208 1 Replacement 2-RC-HSS-117 Replace reservoir Yes 05110105 05-230 1 Cor. Measure 2-RC-HSS-11O* Inspect and fill Yes 05110105 05-229 reservoir 2 Replacement 2-Fw-ICV-3088* Replace valve No 05113/05 05-228 1 Cor. Measure 2-SS-TV-202K Cycled operator Yes 05117/05 05-238 1 Replacement 2-SS-TV-200A* Replace valve Yes 05116/05 05-239 3 Repair 2-CC-1008 Weld repair through No 05110105 05-233 wall leak 2 Replacement 2-MS-119 Replace gate No 05118/05 05-245
- Small item repair or replacement. No AN11 involvement.
Notes:
Station Plant Issue (PI) S-2004-4539was submitted to report missing documentation needed for closeout of work order#
38-00479049-01 which was part of the RepairIReplacement Program.
Station Plant Issue (PI) S-2004-2642 was submitted to address an issue associated with Professional Engineer certification requirements.