ML052350484
| ML052350484 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 08/22/2005 |
| From: | Hartz L Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 05-472 | |
| Download: ML052350484 (23) | |
Text
VIRGINIA ELECTRIC AND POWER COMPANY
- RICHMOND, VIRGINIA 2326 1 August 22, 2005 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.05-472 NLOS/GDM RO Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 OWNERS ACTIVITY REPORTS By letter dated October 2, 2000, the NRC granted approval to use the recording and reporting requirements of American Society of Mechanical Engineers (ASME) Code Case N-532, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division I, for Surry Power Station Units 1 and 2. Therefore, in accordance with the requirements of ASME Code Case N-532, the Owners Activity Reports (Form OAR-I) for Surry Unit 2 refueling outages S2R17, S2R18 and S2R19 are provided in Attachment 1. Surry Unit 2 extended the end of the third interval by one year as allowed by the ASME Section XI Code to complete the Ten-Year Reactor Vessel Examination and various other inservice inspection exams.
This information completes the reporting requirements for the third period of the third ten-year inservice inspection (ISI) interval for Surry Unit 2.
Also, Surry Unit 2 simultaneously entered the fourth ten-year IS1 interval on May 10, 2004. Therefore, the Form OAR-I, completed through the duration of the S2R19 refueling outage as allowed by Code Case N-532-1 for the fourth interval IS1 exams, is provided in Attachment 2.
Should you have any questions regarding this submittal, please contact Mr. Gary Miller at (804) 273-2771.
Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Attach me n ts Commitments made in this letter: None
Serial No.05-472 Docket No. 50-281 Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 Mr. R. E. Martin NRC Lead Project Manager - North Anna and Surry U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Mail Stop 8G9 Rockville, MD 20852 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station
ATTACHMENT 1 Owner's Activitv ReDorts (Form OAR-1) for Surrv Unit 2 Refuelina Outaaes S2R17. S2R18 and S2R19 Third Ten-Year lnservice InsDection Interval Virginia Electric and Power Company (Do mini on)
Surry Power Station Unit 2
SURRY POWER STATION, S2 R17 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant-Rd. S u p, VA 33883 Unit No.
2 Commercial service date 05/01/73 Refueling outage no. S2 R17 Current inspection interval Current inspection period
?d Edition and Addenda of Section XI applicable to the inspection plan 1989 Edition Date and revision of inspection plan IS1 Program Revision 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Ownets Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements Or Section XI.
Certificate of Authorization No.
N/A Expiration Date N/A Signed
. $lJ P V, /s.Sr^dLjs/.
Dale 7 ~6 a*,-
(If applicable) -
(Ownet's or Owner's Besignee, Title)
CERTIFICATE OF INSERVICE INSPECTION I,
the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Viminia and employed by HSB - CT of Hartford. CT have inspected the items described in this Ownet's Activity Report, during the period 1 1 /3/00 to 4/22/02
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind an'sing from or connected with this inspection.
Commissions VA 883(R)
, insp/ecttbs Signature National Board, State, Province, and Endorsements
SURRY POWER STATION UNIT 2 S2 R17 OUTAGE TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS FORM OAR-1 OWNERS ACTIVITY REPORT Examinations Date for The
- This number reflects only the examinations completed during this report period 11/3/00 to 4/22/02.
- This percentage reflects total examinations completed within the present Third Period through 4/22/02.
Note 1 : Deferral to the end of the Interval is permissible.
Note 2: Total examinations required may change based on when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The Class 1 leakage test is required to be performed every refueling outage and was performed on 4/18/02 for this report period. The numbers and percentages represent the total number of refueling outages in the 3rd Interval.
Note 4: The numbers and percentages represent the total number of periods over the inspection interval.
Note 5: The Risk Informed Program became effective during the 3rd Period. Numbers are for the 3rd Period only. VT-2s are completed in accordance with the System Pressure Test Program.
Note 6: Code Case N-509 was implemented, which skewed completion percentages.
SURRY POWER STATION UNIT 2 S2 R17 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Exam Category Flaw or Relevant Condition Found During Scheduled Section XI Item Flaw Characterization Exam or Test Number Item Description (I WA-3300)
(Yes or No)
None for this reporting period.
SURRY POWER STATION UNIT 2 S2 R17 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Note: The following Station Plant Issues (PI) were submitted to report missing documentation needed for work order closeout:
PI-S-2004-2501 R3 PI-S-2004-2501 R4 PI -S-2004-2642 P 1-s-2004-0932
SURRY POWER STATION, S2 R18 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT
.+
?rd I rd y d Report Number:
7-3-3-7 (1 In1.
nterval 3 erln Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant-Rd. Siirry, VA 73883 Unit No.
2 Commercial service date 05/01/73 Refueling outage no. S2 R18 Current inspection interval
?d Current inspection period
-P Edition and Addenda of Section XI aDDlicable to the inspection Dlan 1989 Edition Date and revision of inspection plan IS1 Program Revision 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations. tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate d Authorization No.
N/A Expiration Date N/A Signed S ~ P W, tcsrd.Zusp.
(If applicable)
I Date 7 Z d / O a c
(Owner's or Owner's Designee, l'itle)
CERTIFICATE OF INSERVICE INSPECTION I,
the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Pwince of Viminia and employed by HSB - CT of Hartford. CT have inspected the items 04/23/02 to 12/03/03
, and state that described in this Ownet's Activity Report. during the period to the best of my knowledge and belief. the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore. neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R) v -- Inspector's Signature National Board, State, Province, and Endorsements Date 7 I
SURRY POWER STATION UNIT 2 S2 R18 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS 0
3 yo Total Examinations Credited (O/O) To Date for The Interval 15%
Note 1 Total Examinations Required for The Interval 0
4 4.5 Total Examinations Credited for This Period*
23%
90%
Note 2 25%
100%
38%
100%
Total Examinations Credited (%)
For The Period**
1 Examination Category 100%
100%
Note 1 Remarks 0
0 0
0%
66%
0%
0%
Note 1 0 Yo 0 Yo Note 1 B-A 1
1 10 28%
100%
Note 4 28%
100%
B-B 1.66 4.66 5
25%
100%
Note 8 38%
100%
2.33 I
47%
I 100%
I 3
B-D 33%
I 100%
24 0
0 1
I 8 Yo I
67%
I 0%
0 Yo
~
Note 7 0%
66%
Note 5 B-E 7
0 36 28 8
~
64%
100%
Note 9 25%
100%
Note 9 35%
99%
92%
92%
Note 6 0
I 54%
I looo/o I
B-G-1 B-G-2 B-K B-L-1 B-L-2 B-M-2 B-N-1 B-N-2 B-N-3 B-0 B-P 325 26 22 1
1 0
I 0%
I 100%
I Note 2 7
0 I
0%
I 100%
I Note 2 3
1 1
0 0
I 0%
I 0%
I Notes 1.3 7
B-Q 7
9 14 24
~~
C-A C-B c-c C-F-1 C-F-2 C-G C-H 124 16 I
34%
I 99%
I 22 5
I 41 Yo I
100%
I 1
3 D-A 17 D-B 4
F-A
~~
230 38 R-A
- This number reflects only examinations completed during this report period 4/23/02 to 12/03/03.
- This percentage reflects total examinations completed within the Third Period through 12/03/03.
Note 1 : Deferral to the end of the Interval is permissible.
Note 2: Total examinations required may change based on when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The reactor vessel head was replaced during this refueling outage. All new welds received preservice examination.
Note 4: The Class 1 leakage test is required to be performed every refueling outage and was performed on 11/11/03 during this report period. The numbers and percentages represent the total number of refueling outages that occurred during the 3rd Interval.
Note 5: The numbers and percentages represent the total number of periods over the inspection interval.
Note 6: The Risk Informed Program became effective during the 3rd Period. Numbers are for 3rd Period only.
VT-2s are completed in accordance with the System Pressure Test Program.
Note 7: The class 2 pump casing weld requirement is being reevaluated during the R19 RFO per Dominion Letter No.04-337 to the NRC dated June 28, 2004.
Note 8: Relief Request SR-029 was granted 5/24/02 and subsequently implemented. This relief reduced the overall total requirement for this category and skewed completion percentages.
Note 9: Code Case N-509 was implemented, which skewed completion percentages. The numbers and percentages do not include tally of Class 3 pressure tests which are scheduled to be performed by the end of each period. Numbers and percentages do not reflect VT-2 requirements carried by the Pressure Test Program.
SURRY POWER STATION UNIT 2 S2 R18 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Exam Category Flaw or Relevant Condition Found During Scheduled Section XI Item Flaw Characterfzation Exam or Test Number Item Description (I WA-3300)
(Yes or No)
None for this reporting period.
SURRY POWER STATION UNIT 2 S2 R18 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Note: The following Station Plant Issues (PI) were submitted to report missing documentation needed for work order closeout:
PI-S-2004-2501 R3 PI-S-2004-2501 R4 Pl-S-2004-2642 PI-s-2004-0932 PI -S-2004-4538
SURRY POWER STATION, S2 R19 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Certificate of Authorization No.
N/A Expiration Date N/A I
(If amlicable) q d rd rd Report Number:
7-3-3-34.hd. ntMlal 3
- 1)
Owner Virginia Electric and Power Company, 5000 Dominion 8oulevard, Glen Allen, VA 23060 P
l a
n t
l w
m 3
Unit No.
2 Commercial service date 05/01/73 Refueling outage no. S2 R19 Current inspection interval
?fd Current inspection period
!2d Edition and Addenda of Section XI applicable to the inspection plan Date and revision of inspection plan IS1 Program Revision 4 Chg 01 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan 1989 Edition NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this reporl conform lo the requirements of Section XI.
Certificate of Authonzation No.
N/A Expiration Date N/A (If applicable)
Signed a
JdPV. &5r s' 7-4 5-Date (Ownets or Ownets Designee, Title)
Signed Date (Ownets or Ownets Designee, Title)
I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, hdding a valid commission issued by the National Board of Boiler and Pressure Vessel lnspecton and the State or Province of Virainia and employed by HSB - CT of Hartford. CT have inspected the items described in this Owner's Activity Report, during the period 12/4/03 to 5/23/05
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore. neither the inspector nor his employer shall be liable, in any manner tor any personal injury or properly damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R)
Inspector's Signature National Board. State, Province. and Endorsements
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS FORM OAR-1 OWNER'S ACTIVITY REPORT Total Examinations Credited for This Period*
Total Examinations Credited (%) To Date for The Interval Total Examinations Credited ( O h )
For The Period**
Total Examinations Required for The Interval 0
8 0
0 0
0 0
0 47%
100%
37%
100%
54%
100%
25%
100%
25%
100%
38%
100%
100%
100%
Note 1 0%
100%
Note 2 Note 2 Examination Category 1
1 1
0 Remarks 33%
100%
100%
100%
Note 1 100%
100%
Note 1 0%
0 Yo Notes 1, 3 B-A 0
0 0
0 10 20%
100%
Note 4 28%
100%
25%
100%
Note 8 38%
100%
8.5 I
88%
I 100%
I Note 1, 1 1, I2 0
1 B-B B-D B-E B-G-1 B-G-2 33%
100%
35%
100%
Note 1 1 0
30 1
0 0
2 3
5 24 8
41 Yo 100%
100%
100%
Note 7 33%
100%
Note 5, 10 64%
100%
Note 9, 10 25%
100%
Note 9, 10 36%
100%
100%
100%
Note 6 293 26 22 B-K B-L-1 B-L-2 B-M-2 1
1 7
0 I
0%
I 100%
I Note 2 3
6-N-1 B-N-2 6-N-3 B-0 B-P B-Q C-A C-B c-c C-F-1 C-F-2 C-G C-H D-A 1
1 0
7 7
9 14 24 124 22 30 3
17 4
230 D-B F-A R-A
- This number reflects only examinations completed during this report period 12/04/03 to 5/23/05.
- This percentage reflects total examinations completed within the Third Period.
Note 1 : Deferral to the end of the Interval is permissible.
Note 2: Total examinations required may change based on when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The reactor vessel head was replaced during the R18 refueling outage. New CRDs will be included in next period tallies.
Note 4: The Class 1 leakage test is required to be performed every refueling outage. The numbers and percentages represent the total number of refueling outages that occurred during the 3rd Interval. All Class 1 3rd Interval Pressure Testing was completed by November 11, 2003.
Note 5: The numbers and percentages represent the total number of periods over the inspection interval.
Note 6: The Risk Informed Program became effective during the 3 Period. Numbers are for 3rd Period only.
VT-2s are carried by the System Pressure Test Program.
Note 7: 2-SI-P-1 B was disassembled and inspected to meet this category requirement per Dominion letter No.04-337 to the NRC dated June 28, 2004.
Note 8: Relief Request SR-029 was granted 5/24/02 and subsequently implemented. This relief reduced the overall total requirement for this category and skewed completion percentages.
Note 9: Code Case N-509 was implemented, which skewed completion percentages.
Note 10: All Class 2 and 3 Pressure Tests were completed by April 28, 2005.
Note 11 : Partial relief is required. The following are pending partial relief requests:
PRT-001 Category B-A Weld 1-01 RX Vessel Flange to Upper Shell PRT-002 Category B-A Weld 1-04 RX Vessel Shell to Lower Head PRT-003 Category C-F-1 Circumferential Weld 2-26 Note 12: Plant Issue S-20053892 submitted.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE Exam Item Category I Number 1 Item Description B-D I 83.90 I Weld 2-1 5 Reactor Flaw Characterization Vessel Nozzle to Shell I
Weld Flaw or Relevant Condition Found During Scheduled Section XI Exam or Test (I WA-3300)
(Yes or No)
Evaluated by W es tinghouse letter VRA-05-13 May 9, 2005 Revision 1 June 2005*
- This flaw was reported to the NRC by Dominion letter No.05-384, July 14, 2005.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Code Class
- Repair, Replacement, or Corrective Measure Item Description Description of Work Condition Found During Scheduled Section XI Examination or Date Completed RIR Plan #
The 4th Interval Repair/Replacement Program went into affect May 10, 2004. All work performed during this period is carried in the Interval 4 Program.
ATTACHMENT 2 Owner's Activitv ReDort (Form OAR-1) for Surrv Unit 2 Refuelina Outaae S2R19 Fourth Ten-Year lnservice InsDection Interval Virginia Electric and Power Company (Dominion)
Surry Power Station Unit 2
SURRY POWER STATION, S2 R19 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 Unit No.
2 Commercial service date 05/01/73 Refueling outage no. S2 R19 Current inspection interval Alh Current inspection period 1 st Edition and Addenda of Section XI applicable to the inspection plan Date and revision of inspection plan Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan 1998/2000 Edition IS1 Plan Revision 1 NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No.
NIA Expiration Date NIA (If applicable)
Signed Date
'7 t 6 05-CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, hdding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virainia and employed by HSB - CT of Hartford, CT have inspected the items described in this Owner's Activity Report, during the period 51 1 0104 to 5/23/05
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests. repairs. replacements, evaluations and corrective measures described in this report. Furthermore. neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R)
I Inspector's Signature National Board, State, Province, and Endorsements Note: ANll has Open Item CS 04-04 for this reporting period.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Examinations Credited (Oh) To Date for The In te rva I Total Examinations Required for The Interval Total Examinations Credited for This Period*
Total Examinations Credited (%)
For The Period**
Examination Category Remarks 9
0 0%
B-A 6-6 B-D B-G-1 B-G-2 B-K B-L-1 B-L-2 B-M-2 B-N-1 B-N-2 0%
12%
5%
23%
4%
4%
0%
0%
14%
12%
5%
23%
4%
4%
0%
0%
14%
.83 2
80 4
1 36 344 94 22 1
1 0
0 1
7 3
0 0%
0 Yo 1
0 0%
0%
1 0
0%
0%
B-N-3 B-0 B-P B-Q C-A C-B 3
0 0%
0 Yo 1
14%
14%
Note 1 7
7 1
14%
14%
9
.66 7%
7%
14 2.66 19%
0%
19%
0%
4%
c-c 25 126 C-F-1 C-F-2 C-G C-H D-A D-B F-A R-A 5
39 3
7%
7%
2 0
0%
0 Yo 3
0 0%
0 Yo Note 2 19 7
37%
37%
3 0
0%
Note 2 0%
14%
258 38 66 13 19%
- This number reflects only examinations completed during this report period 12/04/03 to 5/23/05.
- This percentage reflects total examinations completed within the 1 st Period.
Note 1 The Class 1 Leakage test is performed every refueling outage and was completed on May 21, 2005.
Note 2 The numbers represent total number of periods over the inspection Interval.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Exam Category Flaw or Relevant Condition Found During Scheduled Section XI Item Flaw Characterization Exam or Test Number Item Description (IWA-3300)
(Yes or No)
None for this reporting period.
SURRY POWER STATION UNIT 2 S2 R19 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT I
wall leak -
I Item Description I
2 I
Replacement I 2-RC-TV-2519A Replace bonnet No I 05/09/05 I 05-231 2
2 assembly Replacement 2-MS-382*
Replace tubing No 05/09/05 05-01 2 Repair 2-MS-381*
Weld repair through No 1 1/26/04 04-299
- Small item repair or replacement. No AN11 involvement.
2 2
2 1
1 Notes:
Station Plant Issue (PI) S-2004-4539 was submitted to report missing documentation needed for closeout of work order#
38-00479049-01 which was part of the RepairIReplacement Program.
Station Plant Issue (PI) S-2004-2642 was submitted to address an issue associated with Professional Engineer certification requirements.
wall leak Replacement 2-CH-267 Replace valve No 0511 3/05 05-223 Replacement 2-CH-FE-2180 Replace fasteners Yes 05/07/05 05-1 98 Replacement 2-CH-TK-2 Replace fasteners Yes 05/05/05 05-208 Replacement 2-RC-HSS-117 Replace reservoir Yes 0511 0105 05-230 Cor. Measure 2-RC-HSS-11 O*
Inspect and fill Yes 0511 0105 05-229 2
1 1
3 2
reservoir Replacement 2-Fw-ICV-3088*
Replace valve No 0511 3/05 05-228 Cor. Measure 2-SS-TV-202K Cycled operator Yes 0511 7/05 05-238 Replacement 2-SS-TV-200A*
Replace valve Yes 0511 6/05 05-239 Repair 2-CC-1008 Weld repair through No 0511 0105 05-233 Replacement 2-MS-119 Replace gate No 0511 8/05 05-245 wall leak