VIRGINIA ELECTRIC AND POWER COMPANY
- RICHMOND, VIRGINIA 23261 February 28, 2005 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.:
05-088 NLOS/GDM:
RO Docket No.:
50-280 License No.:
DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNIT 1 0 WN ERS ACTIVITY REPORTS By letter dated October 2, 2000, the NRC granted Dominion approval to use the recording and reporting requirements of ASME Code Case N-532, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1, for Surry Power Station Units 1 and 2. Therefore, pursuant to the requirements of ASME Code Case N-532, the Owners Activity Reports (Form OAR-I) for Surry Unit 1 refueling outages SlR17, SIR18 and SIR19 are provided in Enclosure 1. It should be noted that the third interval, ten-year reactor vessel examination was completed during the S1 R19 refueling outage as allowed by the NRC in a letter dated November 4, 2003, Surry Power Station, Unit 1 - Inservice Inspection Program Relief Request CMP-28, Revision 1, Extension of Reactor Vessel Inspection Schedule (TAC No. MB8480). Provision of this information completes the reporting requirements for the third period of the third ten-year inservice inspection interval for Surry Unit 1.
Additionally, Surry Unit 1 entered the fourth ten-year inservice inspection (ISI) interval on October 14, 2003. Therefore, as allowed by Code Case N-532-1, the Form OAR-1 for the fourth interval IS1 exams completed through the duration of the S1 R19 refueling outage is provided in Enclosure 2.
Should you have any questions regarding this submittal, please contact Mr. Gary Miller at (804) 273-2771.
Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services Enclosures Commitments made in this letter: None
cc:
U.S. Nuclear Regulatory Commission Region I1 Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Mail Stop 8G9 Rockville, MD 20852 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station Owner's Activitv ReDorts (Form OAR-1)
Surrv Unit 1 Refuelina Outaaes S1 R17. S1 R18 and S1 R19 Third Period of the Third Ten-Year IS1 Interval Virginia Electric and Power Company (Dominion)
SURRY POWER STATION, S1 R17 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant-Rrl, Siirry, VA 7.1883 Unit No.
1 Commercial service date 12/22/72 Refueling outage no. S1 R17 Current inspection interval
?'d Current inspection period qrd Edition and Addenda of Section XI applicable to the inspection plan Date and revision of inspection plan Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan 1989 Edition IS1 Program November 2004 Revision 4 NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No.
N/A Expiration (If applicable)
Signed
&/&w (Owner's or Owner's Designee, Title)
Date Date CERTIFICATE OF INSERVICE INSPECTION I,
the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virainia and employed by H.S.B.I. 8, I. Co.
have inspected the items described in this Owner's Activity Report, during the period 5/9/00 to 1 2/8/01
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
of Hartford, CT By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R) w -
f Inspectots'signature National Board, State, Province, and Endorsements
SURRY POWER STATION UNIT 1 S1 R17 OUTAGE TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS FORM OAR-1 OWNERS ACTIVITY REPORT Total Examinations Credited (%) To Date for The Interval Total Examinations Required for The Interval Total Exam inat ions Credited for This Period*
Total Examinations Credited (%)
For The Period**
Exam inat ion Category B-A B-B B-D B-E B-G-1 B-G-2 B-K-1 B-L-1 B-L-2 B-M-2 B-N-1 B-N-2 B-N-3 B-0 B-P B-Q C-A 10 Note: 1 0
5 0
0%
54%
24 1
4%
62%
Note: 1 1
7 3.33 47%
85%
Note: 1 1
90 27%
329 28 22 88%
89%
90%
0%
100%
100%
6 21 Yo 27%
0%
0%
6 1
0 1
0 7
0 Note: 2 3
0 0%
66%
2 0%
1 0
0%
0%
Note: 1 1
3 0
0%
Note: 1 1
66%
85%
7 1
14%
Note: 3 1
1 12%
7
.66 9%
14 35 2
11 14%
31 70 71 yo 94%
12 7.33 61 YO 88%
I C-H 3
0 0%
66%
Note: 5 1
238 82 34%
98%
24 10 41 %
98%
4 0
0%
100%
243 68 27%
80%
95 18 19%
Note: 4 1
- This number reflects only the examinations completed during this report period 5/9/00 through 12/8/01.
- This percentage reflects total examinations completed within the present Third Period through 12/8/01
Note 1 : Deferral to the end of the Interval is permissable.
Note 2: Examination is required only when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The Class 1 leakage test is required to be preformed every refueling outage. The numbers and percentages represent the total number of refueling outages in the 3rd Interval. The reactor coolant system VT-2 exam, 1 -PT-1 1, was performed on 12/5/01.
Note 4: The Risk Informed Program became effective during the middle of the 2nd Period. Numbers are for 2nd and 3rd Periods only. VT-2s are carried by the System Pressure Test Program.
Note 5: The numbers and percentages represent the total number of periods over the inspection Interval.
SURRY UNIT 1 POWER STATION S1 R17 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT I
Exagmv 1 Item Cate o Number Flaw or Relevant Condition Found During Scheduled Section XI Flaw Characterization Exam or Test Item Description (IWA-3300)
(Yes or No)
I 1
I No evaluations were required for this reporting period.
SURRY POWER STATION SIR17 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE FORM OAR-I OWNER'S ACTIVITY REPORT Item Description 01-CC-E-1 B Description of Work Weld repair pitting in CC 01 -CC-E-1 D 01 -CC-E-1 C Heat Exchanger Weld repair in end bells Weld reDair in end bells 1 -sw-5 01 -SW-840 01 -RH-MOV-Replace valve Replace valve Replace fasteners and 01 -BS-BLD-CONT 01 -SW-PP-8 01 -MS-RV-101 B 01 -CW-96"-
WC-4-10 01 -FW-l$'-
Repair exterior concrete CTMT Replace pipe Repair flange surface Repair base metal Weld build-uD 01 -RC-MSS-220 Modify cold setting Condition Found During Scheduled Section XI Examination or Test No
- Repair, Replacement, or Corrective Measure Code Class 3
Repair 5/17/00 00-1 08 5/24/00 00-1 09
- 7/12/00 00-1 21 Repair Repair Repair 3
rJ No No No 3
3 01 -SW-PP-24 I ReDair thru-wall leak in 01 -cs-w-cs-Replace spring can to 1-sw-649 Repair No 2
Repair No 3
5/1/01 01 -007 7/11/01 01 -01 4 t 11/16/01 01-019 Replacement Replacement 3
3 No No Replacement No 2
17208 disc Repair No 3
ReDlacement No 3
2 2
IWL 01-MS-158 I
Replace valve 01-MS-84 1
Replace valve Rep1 acem ent Replacement No No Yes, Sect XI IWL Repair Replacement Repair 3
2 No No I
11/16/01 I 01-122 Repair No 3
HSS 3
Repair No WFPD-13-601 01 -sw9(y'-
Repair base metal Repair No 2
Repair No nozzles 01-SI-136 I
ReDair weld Repair Repair 2
3 No No No No 01-CW-69'- I ReDair base metal wc-1-10 11/26/01 01-133 +
11/5/01 01-135 Reoair 1
2 Corrective Measure Corrective Measure 2
No No 1
Corrective Measure
Code Class 2
2 2
2 2
2 2
1 2
1 3
Date Completed 11/2/01 11/2/01 11/7/01 11/7/01 11/2/01 11/26/01
- Repair, Replacement, or Corrective Measure WR Plan #
01-138 01-139 01-140 01-141 01-142 01-143 Corrective Measure 01 -MI-HSS-Item Description Test Modify cold setting No Description of Work Corrective Measure Corrective Measure Corrective Measure Corrective Measure Corrective Measure Condition Found During Scheduled Section XI Examination or 14 18 115A 1 8A 1 00 61 A 01 -W-HSS-Modify cold setting 01 -RS-MSS-Modify cold setting 01 -BD-MSS-Modify cold setting 01 -BD-MSS-Modify cold setting 01 -MS-MSS-Modify cold setting Corrective Measure I 01 -W-HSS-3 I Modify cold setting No No No No No No Corrective Measure I 01 -RC-MSS-I Modify cold setting No Replacement Repair
~~
Repair I 01-SW-772 I Repair through-wall leak I Yes, SPT 12c 01 -lA-939 Replace check valve disc Type C test 01 -RD-CRDM-Repair CRDM canopy seal No L5 11/3/99 I 99-091 Note: The following Station Plant Issues (PI) were submitted to report missing documentation needed for closeout of numerous work orders:
PI-S-2004-2501 R3 PI-S-2004-2501 R4 PI-S-2004-2642 PI -s-2004-0932 P I-S-2004-4538 P I-s-2004-4539
SURRY POWER STATION, S1 R18 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT rd rd nd Report Number:
Owner: Virginia Electric and Power ComDanv, 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant: Surrv Power Station. 5570 Hoq Island Rd. Surrv. VA 23883 Unit No.
1 Commercial service date 12/22/72 Refueling outage no. S1 R18 Current inspection interval Current inspection period 4
Edition and Addenda of Section XI aDDlicable to the insoection Dlan 1989 Edition Date and revision of inspection plan IS1 Program November 2004 Revision 4 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No.
NIA Expiration Date NIA Signed Date
/.z
/ L : q (Owner's or Owner's De%ignee, Title)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virqinia and employed by H.S.B.I. & I. Co.
of Hatford, CT have inspected the items described in this Owner's Activity Report, during the period 12/9/01 to 6/17/03
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R)
I I '
Inspector's Signature National Board, State, Province, and Endorsements
SURRY POWER STATION S1 R18 OUTAGE TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS FORM OAR-1 OWNERS ACTIVITY REPORT Total Examinations Credited for This Period*
0 Examination Category B-A B-B B-D B-E B-G-I B-G-2 B-K-1 B-L- 1 B-L-2 B-M-2 B-N-1 B-N-2 B-N-3 B-0 B-P B-Q C-A C-B c-c C-G C-H D-A D-B D-C F-A R-A Total Total Examinations Examinations Credited (%) To Date for The The Period**
Interval Remarks 0%
10%
Notes: 1. 6 Credited (%) For 2.33 3
1 0
3 2.33 1
0 0
0 0
Total Examinations Required for The Interval 10 46%
100%
Note: 5 16%
75%
Notes: 1, 6 61 YO 100%
Note: 1 27%
88%
Note: 6 32%
100%
37%
100%
100%
100%
Note: 1 0%
100%
Note: 2 0%
100%
Note: 2 0%
66%
Note: 6 0%
0%
Note: 6 5
4 2
42%
100%
37%
100%
24 7
329 28 22 0
0 3
1 1
0%
0%
Notes: 2, 8 0%
66%
Note: 9 35%
100%
Note: 10 45%
100%
Note: 10 1
48 21 7
3 2
47%
100%
41 yo 94%
Notes: 4, 5, 6 1
0 I
0%
I 0%
I Note: 6 2
0 I
0%
I 100%
I Note: 7 7
2 I
28%
I 100%
I Note: 3 8
2 I
37%
I 100%
I 7
1.66 I
33%
I 100%
I Note: 5 14 35 0
3 238 24 4
243 95 0
I 0%
I 100%
I Note: 10
- This number reflects only examinations completed during this report period 12/9/01 through 6/17/03.
- This percentage reflects total examinations completed within the present third period through 6/17/03.
Note 1 : Deferral to the end of the Interval is permissable.
Note 2: Examination is required only when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The Class 1 leakage test is required to be performed every refueling outage. The numbers and percentages represent the total number of refueling outages in the 3fd Interval. The reactor coolant system VT-2 exam, 1 -PT-1 1, was performed on OW1 1/03.
Note 4: The Risk Informed Program became effective during the middle of the 2"d Period. Numbers are for 2"d and 3rd Periods only. VT-2s are carried by the System Pressure Test Program.
Note 5: Partial Relief Request submitted.
Note 6: Completion of this category deferred until 12/30/04 per Relief Request CMP-28 Rev 1.
Note 7: Reactor Head replaced this refueling outage. All new welds received presetvice examination.
Note 8: This category was reevaluated and discussed with the NRC, reference Dominion Letter No.04-337, June 28,2004.
Note 9: The numbers and percentages represent the total number of periods over the inspection Interval Note 10: The numbers and percentages do not include tally of Class 3 pressure tests which are scheduled to be performed by the end of each period.
SURRY POWER STATION S1 R18 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Flaw Characterization (I WA-3300)
Evaluated acceptable as found cold setting per Engineering Transmittal ET S-03-0138.*
Exam Category F-A F-A F-A F-A F-A Flaw or Relevant Condition Found During Scheduled Section XI Exam or Test (Yes or No)
YES Item Number F1.20 F1.20 F1.20 F1.20 support F1.20 I
1 -CC-H002 Item Description 1 -SI-H001 (6-SI-153-1502)
Spring Hanger support 1 -SI-H001 (10-SI-84-152)
Spring Hanger support 1 -SI-H013 (1 0-SI-83-152)
Spring Hanger support 1 -WHO04 (10-SI-151-153)
Spring Hanger (6-CC-80-151)
Spring Hanger I
support Evaluated acceptable as found cold setting and corrosion on base plate welds per Engineering Transmittal ET S-03-0138.*
Evaluated acceptable corrosion on base plate and inner threads per Engineering Transmittal ET S-03-0138.*
Evaluated acceptable concrete grout beneath base plate and corrosion on inner threads per Engineering Transmittal ET S-03-0138.*
Evaluated acceptable corrosion on spring can and spring per Engineering Transmittal ET S-03-01 38.*
YES YES YES YES Support was evaluated acceptable as found. No corrective measures or successive examinations are required.
Class Item Description 1 -CH-P-1 B 1 -CC-E-1 A 1 -CC-E-1 B 1 -CC-E-1 B 1 -CC-E-1 C g
Description of Work REPL PUMP WELD REPR REPR OUTLET ENDBELL REPAIR PllTlNG REPR ENDBELL HSS HSS 511 5/03 2/8/02 2/14/02 2/19/02 2/27/02 SURRY POWER STATION SIR18 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FORM OAR-I OWNER'S ACTIVITY REPORT 01 -039 02-046 02-050 02-049 02-058
- Repair, Replacement, or Corrective Measure 1 -CC-E-1 D 1 -IA-704 1-SW-3"-WS-551-REPLACE REPAIR REPAIR REPAIR REPAIR REPR ENDBELL No REPL VALVE Yes type C REPL PIPE No REPAIR REPLACE REPLACE REPAIR REPAIR REPAIR REPLACE REPLACE REPLACE REPLACE REPAIR REPAIR 21 x 1 -CC-W-1 D 1 -SW-PCV-1 OOE 1 -SW-24"-WS REPLACE REPLACE REPR 30" INLET PIPE No REPR VALVE BOYD No REPR LEAK No REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE 611 3/02 711 0102 1 19/03 1/24/03 2/27/03 511 2/03 511 2/03 6/5/03 6/7/03
~~
REPLACE REPLACE 02-1 18 02-1 21 02-1 77 03-006 03-041 03-053 03-054 03-056 03-059 REPLACE 10 1 -CH-LCV-l460B 1 -sw-119 1-RH-MOV-17208 1 -RH-MOV-I 720A 1 -RC-SV-1551 B I-SW48"-WS-2-10 l-FW-TI-154B 1 -SW-24"-WS REPLACE REPLACE REPLACE REPL B-B FASTENER No REPL VALVE No REPL VALVE No REPL VALVE No REPR VALVE No REPR PIPE No REPL THERMOWELL No REPL PIPE No REQUIRED FOR CONTINUED SERVICE 1
I Condition 10 1 -CS-130 1 -CS-131 1 -CS-132 1 -cs-133 1 -RC-R-1 1-SW-262 1 -SW-262 1 -SW-3O"-WS 10 1 -SW-3"-WS-551-21 x l-FW-HCV-155A 1-FW-HCV-155B 1-FW-HCV-155C REPL FASTENERS No REPL FASTENERS No REPL FASTENERS No REPL FASTENERS No REPL RV HEAD No REPL VALVE No REPL SUPPORT No REPL LATERAL No REPL PIPE /01-3.00"-WS-No REPL PIPE No REPL PIPE No REPL PIPE No 551 -21 X Found During Scheduled Section XI Examination or Test (Yes or No)
No No No No No n
Date I Pr:#
1 Completed
Note: The following Station Plant Issues (PI) were submitted to report missing documentation needed for closeout of numerous work orders:
PI-S-2004-2501 R3 PI-S-2004-2501 R4 PI -s-2004-2642 PI-s-2004-0932 P I-S-2004-4538 Pl-s-2004-4539 Pl-S-2004-3963 R1 PI -s-2004-4541
SURRY POWER STATION, S1 R19 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT r
d rd rd Report Number: J w U n i t 1. 3 Intf+NaI. 3 PmncL 3 Repad)
Owner: Virginia Electric and Power ComDanv. 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant: Surrv Power Station. 5570 Hoa Island Rd, Surrv. VA 23883 Unit No.
1 Commercial service date 12/22/72 Refueling outage no. S1 R19 Current inspection interval Current inspection period Edition and Addenda of Section XI aDDlicable to the inspection Dlan 1989 Edition Date and revision of inspection Surry Unit 1 3'd Interval IS1 Program Revision 5, February 2005 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No.
N/A Expiration Date N/A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, hdding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virainia and employed by H.S.B.I. & I. Co.
have inspected the items described in this Owner's Activity Report, during the period
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
611 8/03 to 12/3/04 By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 883(R) w - Inspector's Signature National Board, State, Province, and Endorsements Date &, h /, / O 5'
SURRY POWER STATION S1 R19 OUTAGE TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS FORM OAR-1 OWNERS ACTIVITY REPORT Total Examinations Credited (%) To Date for The Interval Re marks Total Examinations Required for The Interval Total Examinations Credited for This Period*
5 24 0
6 32 1 28 29 0
100%
100%
Note: 2 Note: 6 3
2
~
1 2
2 7
0 2
100%
100%
Note: 5 0%
Notes: 2. 8 100%
Note: 10 100%
100%
Notes: 4. 5. 6 Total Examinations Credited (%) For The Period**
Examination 10 I
9 90%
46%
41 yo B-D B-E B-G-1 B-G-2 B-K-1 B-L-1 B-L-2 B-M-2 B-N-1 100%
I 0%
37%
32%
37%
100%
I Notes: 9, 6 100%
I 100%
I 1
100%
100%
I 1
0%
100%
I Note: 2 7
I 0
0%
33%
100%
100%
I Notes: 1, 6 B-N-2 B-N-3 B-0 B-P B-Q C-A C-B c-c C-G C-H D-A D-B D-C F-A R-A 1
1 100%
100%
I Notes: 1, 6 0%
100%
1 Note: 7 100%
I Note: 3 28%
37%
8 I
0 100%
I 7
0 33%
100%
I Note: 5 14 I
0 42%
37%
0%
33%
35 I
0 0
I 0
3 I
1 238 I
0 35%
100%
I Note: 11 0
45%
100%
I Note: 11 4
0 0%
100%
I Note: 11 243 0
47%
95 I
6 47%
- This number reflects only the examinations completed during this report period 6/18/03 through 12/3/04.
- This percentage reflects total examinations completed for third period requirements through 12/3/04.
Note 1 : Deferral to the end of the Interval is permissable.
Note 2: Examination is required only when a pump or valve is disassembled for maintenance, repair or examination.
Note 3: The Class 1 leakage test is required to be performed every refueling outage. The numbers and percentages represent the total number of refueling outages that occurred during the 3rd Interval. All required Class 1 system pressure tests have been completed.
Note 4: The Risk Informed Program became effective during the middle of the 2"d Period. Numbers are for 2nd and 3rd Periods only. VT-2s are carried by the System Pressure Test Program.
Note 5: Partial Relief Request required.
Note 6: Completion of this category deferred until 12/30/04 per Relief Request CMP-28 Rev1 Note 7: Reactor Head replaced during R18 refueling outage. All new welds received preservice examination.
Note 8: This category was reevaluated and discussed with the NRC, reference Dominion Letter No.04-337, June 28,2004.
Note 9: Total examinations required changed because some pumps and valves were never disassembled.
Note 10: The numbers and percentages represent the total number of periods over the inspection Interval.
All required Class 2 system pressure tests were completed by the end of the Interval with the Code allowable one year extension, 10/13/04.
Note 11 : Numbers do not reflect VT-2 requirements covered by the Pressure Test Program. All required Class 3 system pressure tests were completed by the end of the Interval with the Code allowable one year extension, 10/13/04.
The following is a list of partial relief requests pending:
PRT-02 C-C Integral Attachments H003-1 and H003-2 PRT-03 C-C Integral Attachment H002-1 PRT-04 R-A Risk Informed Welds 1-05 and 1-1 1 PRT-05 B-B Pressurizer Weld 1-07 PRT-06 C-A Weld 1-AO1 on " A RHR HX PRT-07 B-A RX Vessel Shell-to-Flange Weld 1-01 PRT-08 B-A RX Vessel Circumferential Shell Weld 1-04
Exam Category No evaluations were required during this reporting period for 3rd Interval exams.
Flaw or Relevant Condition Found During Scheduled Item Flaw Characterization Section XI Exam or (Yes or No)
Number Item Description (IWA-3300)
Test
Code Class 3
Note: This list encompasses all work performed during the 3rd Interval from 6/18/03 to 10/13/03.
Condition Found
- Repair, During Measure Examination Completed Replacement, Scheduled FUR or Corrective Item Description Description of Work Section XI Date Plan #
or Test (Yes or No)
Replacement 1 -VS-YS-l E Replace strainer No 09/30/03 03-263 Owner's Activitv RePort (Form OAR-1 Surrv Unit 1 Refuelina Outaae S1 R19 Fourth Ten-Year IS1 Interval Virginia Electric and Power Company (Dominion)
s1 1 6 ' R Report Number: l A L l & n i t 1 4th W v a l 1 erln.
Owner: Virainia Electric and Power ComDanv, 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant: Surrv Power Station, 5570 Hoa Island Rd. Surrv. VA 23883 Unit No.
1 Commercial service date 12/22/72 Refueling outage no. S1 R19 Current inspection interval Ath Current inspection period 1
S' Edition and Addenda of Section XI applicable to the inspection plan 1998 Edition through 2000 Addendum Date and revision of inspection plan Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan Surry Unit 1 4Ih Interval IS1 Plan Revision 1, October 2004 NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No.
N/A Expiration Date N/A Signed s&pv. W s r d t ~ J p Date
&/h,i-(Owner's or Owner's Designee, Title)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virainia and employed by H.S.B.I. & I. Go.
~~
have inspected the items described in this Owner's Activity Report, during the period 10/14/03 to 12/3/04
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inmection Commissions VA 883(R)
Inspector's Signature National Board, State, Province, and Endorsements Date a,/2/,/o-r
SURRY POWER STATION S1 R19 OUTAGE TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS FORM OAR-1 OWNER'S ACTIVITY REPORT Total Examinations Credited for This Period Total Examinations Credited (%) To Date for The Interval Total Examinations Credited (%)
For The Period
.33 1.33 3
87 Total Examinations Required for The Interval 10 5
3%
26%
10%
25%
Examination Category B-A B-B B-D B-G-1 B-G-2 B-K 10%
25%
Remarks Note 1 3%
6 6.33 0
0 0
6%
22%
0%
0%
0%
26%
0%
0%
0%
0%
0%
0%
0%
14%
0%
Note 1 Note 2 Note 3 30 345 95 28 9%
15%
12%
0%
0%
12%
0%
15%
2%
Note 1 6 Yo 1
Note 4 Note 5 Note 5 0
0 6
0 43 22%
1 0%
0%
12%
0%
15%
B-L-1 1
B-L-2 1
B-M-2 7
B-N-1 3
0 B-N-2 2
0 I
0%
B-N-3 1
0 3
0 0%
B-0 B-P B-Q C-A C-B 1
I 14%
7 9
7 15 15%
12%
c-c 16 C-G 36 3
51 D-A D-B 3
F-A 27%
R-A 126 3
I 2%
Note 1 : Many exams presently scheduled are required only if component is disassembled for maintenance.
Total examinations required may change according to maintenance activities.
Note 2: The Class 1 leakage test is required to be performed every refueling outage. The numbers and percentages represent the total number of refueling outages planned for the 4'h Interval. The reactor coolant system VT-2 exam, 1 -PT-1 1, was performed on 12/2/04.
Note 3: Total examinations required may change dependent on the S/G Eddy Current Program.
Note 4: Total examinations required will be determined by maintenance performed on any C-G pump.
Exams are required only when a pump is disassembled for maintenance.
Note 5: The numbers and percentages represent the total number of periods over the inspection Interval.
Exam Category F-A F-A Flaw or Relevant Condition Found During Scheduled Item Flaw Characterization Section XI Exam or (Yes or No)
Number Item Description (IWA-3300)
Test F1.10 1 -RC-HOO1 B As Found Cold Setting Unacceptable Yes Fl.10 1 -SI-HSS-020 Loose Nut Yes
Code Class 3
3 SURRY POWER STATION S1 R19 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FORM OAR-1 OWNER'S ACTIVITY REPORT Replacement 1 -FW-P9B Reinstall original pump No Replacement 1 -SS-E-3B Replace tubing to HX No
- Repair, Replacement, or Corrective Measure REQUIRED FOR CONTINUED Item Description Description of Work SERVICE Found During Scheduled Section XI Examination Test (Yes or WR Plan Date Completed m t m q - m w 01 /02/04 04-3058' Note: This list encompasses all work performed during the 4'h interval from 10/14/03 to 12/3/04.
- No ANll involvement