Comment (172) of Jody Slocum and Kurt Buetow on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2
ML21069A037
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/03/2021
From: Buetow K, Slocum J
- No Known Affiliation
To:
Office of Administration
References
86FR7747 00172, NRC-2020-0277
Download: ML21069A037 (2)


Text

3/9/2021 blob:https://www.fdms.gov/bff468f9-7fad-412b-bcfc-6c04031b22d3 blob:https://www.fdms.gov/bff468f9-7fad-412b-bcfc-6c04031b22d3 1/2 PUBLIC SUBMISSION As of: 3/9/21 1:54 PM Received: March 03, 2021 Status: Pending_Post Tracking No. klu-7bmd-ohln Comments Due: March 03, 2021 Submission Type: Web Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0177 Comment on FR Doc # 2021-02001 Submitter Information Name: Jody Slocum Address:

Downing, WI, 54734 Email: jodyslocum@gmail.com Phone: 15415108889 General Comment After the disaster in Japan I am very concerned with the continued use of nuclear power.

I ask that the EIS address these issues below:

Impacts to threatened or endangered species Air and water quality Historical and cultural sites, particularly sites of significance for indigenous peoples Social and economical impacts to local communities (ie housing, businesses, property values, and considerations of aesthetics and noise expected)

Cost and schedule analysis for all of the actions and alternatives Financial plans Environmental mitigation plans Plans for complying with any additional required federal, state, or local permits NEPA requires consideration of indirect or secondary impacts so as you consider the proposed action and alternatives. Consider bringing forth questions on potential physical and natural resources as well as the broader socioeconomic environment that may not be directly tied to the proposed action but may be significant because of indirect relationship to the proposed action.

Indirect effects are caused by the action and are later in time or farther removed in distance, but are still reasonably foreseeable.

Indirect effects may include growth inducing effects and other effects related to induced changes in the pattern of land use, population density or growth rate, and related effects on air and water and other natural systems, including ecosystems.

NEPA also requires consideration of cumulative effects of a proposed action so consider effects on the environment that can result from individually minor but collectively significant actions taking SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Phyllis Clark, Bill Rogers, Kevin Folk, Stacey Imboden, Mary Neely Comment (172)

Publication Date:2/1/2021 Citation: 86 FR 7747

3/9/2021 blob:https://www.fdms.gov/bff468f9-7fad-412b-bcfc-6c04031b22d3 blob:https://www.fdms.gov/bff468f9-7fad-412b-bcfc-6c04031b22d3 2/2 place over a period of time, noting specifically the long operational licensure timeframe of the reactors.

An example of a cumulative effect might be cooling water releases to water bodies. One industry's multiple releases might not represent a significant impact to the temperature dependent limnological characteristics of the water body but the release from multiple sources might represent or cause a 0.5 degree Fahrenheit change in water temperature enough to reduce oxygen levels to a point that a valuable zooplankton species dies off starving off multiple fish species.

Thanks for your consideration.

Sincerely, Jody Slocum and Kurt Buetow N9215 130th St Downing, WI 54734