ML21062A018

From kanterella
Jump to navigation Jump to search

Comment (32) of Larry Troshynski on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2
ML21062A018
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/20/2021
From: Troshynski L
- No Known Affiliation
To:
Office of Administration
References
86FR7747 00032, NRC-2020-0277
Download: ML21062A018 (1)


Text

3/2/2021 blob:https://www.fdms.gov/14b93ab9-2b61-416f-bbd1-f340b751 e1 b?

SUNI Review Complete Template=ADM-013 As of: 3/2/21 2:00 PM E-RIDS=ADM-03 Received: February 20, 2021 PUBLIC SUBMISSION ADD: Phyllis Clark, Bill Rogers, Mary Neely Status: Pending_Post Tracking No. kle-35qj-3wuw Comment (32)

Publication Comments Due: March 03, 2021 Date:2/1/2021 Submission Type: Web Citation: 86 FR 7747 Docket: NRC-2020-0277 Notice oflntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0001 Notice oflntent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0036 Comment on FR Doc# 2021-02001 Submitter Information Name: Larry Troshynski Address:

Overland Park, KS, 66212 Email: lartro3 l@gmail.com Phone:6605411616 General Comment I oppose the NRC extending the operation of this power plant. Point Beach Unit 2 has the worst-embrittled reactor pressure vessel of any pressurized water reactor in the country. Decades of additional neutron radiation bombardment will only increase the risk of a pressurized thermal shock, through-wall fracture, core meltdown, and catastrophic release of hazardous radioactivity.

blob:https://www.fdms.gov/14b93ab9-2b61-416f-bbd 1-f340b751 e 1b7 1/1