ML21050A159

From kanterella
Jump to navigation Jump to search

Comment (29) of Philip Ratcliff on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2
ML21050A159
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/19/2021
From: Ratcliff P
- No Known Affiliation
To:
Office of Administration
References
86FR7747 00029, NRC-2020-0277
Download: ML21050A159 (1)


Text

2/19/2021 blob:https://www.fdms.gov/423cd8c5-fa4d-479e-ab38-79311848e750 SUNI Review Complete Template=ADM-013 As of: 2/19/21 9:09 AM E-RIDS=ADM-03 Received: February 19, 2021 PUBLIC SUBMISSION ADD: Phyllis Clark, Bill Rogers, Mary Neely Status: Pending_Post Tracking No. klb-ymwl-woxf Comment (29)

Publication Comments Due: March 03, 2021 Date:2/1/2021 Submission Type: Web Citation: 86 FR 7747 Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0033 Comment on FR Doc # 2021-02001 Submitter Information Name: Philip Ratcliff Address:

Salem, OR, 97302 Email: skazz999W@hotmail.com Phone: 5039744858 General Comment Point Beach Unit 2 has the worst-embrittled reactor pressure vessel of any pressurized water reactor in the country. Decades of additional neutron radiation bombardment will only increase the risk of a pressurized thermal shock, through-wall fracture, core meltdown, and catastrophic release of hazardous radioactivity.

blob:https://www.fdms.gov/423cd8c5-fa4d-479e-ab38-79311848e750 1/1