Comment (116) of Dale Schaber Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2
ML21064A347
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/02/2021
From: Schaber D
- No Known Affiliation
To:
Office of Administration
References
86FR7747 00116, NRC-2020-0277
Download: ML21064A347 (1)


Text

3/5/2021 blob:https://www.fdms.gov/b351608b-5c4e-429d-9c26-9ac8a49ef46f blob:https://www.fdms.gov/b351608b-5c4e-429d-9c26-9ac8a49ef46f 1/1 PUBLIC SUBMISSION As of: 3/5/21 9:49 AM Received: March 02, 2021 Status: Pending_Post Tracking No. kls-b7n5-qsar Comments Due: March 03, 2021 Submission Type: Web Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0121 Comment on FR Doc # 2021-02001 Submitter Information Name: Dale Schaber Address:

Appleton, WI, 54911 Email: dschaber@athenet.net Phone: 920-739-6041 General Comment I oppose the requested 20 year extension of the Point Beach Nuclear Power Plant operating license for Units 1 and 2.

I have safety concerns about the cooling pipes underneath Units 1 and 2. I do not want any rusting, degrading and leaking of radioactive tritium. This radioactive tritium would leak into nearby groundwater which current wells now pump into homes for drinking water.

The operators of Point Beach Nuclear Plant need to be held liable for any and all property damages. Do not allow another 20 year extension.

Safety for Wisconsin citizens is absolutely needed. The unacceptable lack of accountability of owners combined with liability waivers in all damages if catastrophic accidents happen is unacceptable.

I hiked the Ice Age Trail near the Point Beach Nuclear Power Plant. I enjoyed going to the Two Creeks Buried Forest. If there is a catastrophic accident this forest would be so contaminated no one would be able to view the forest along Lake Michigan for hundreds or thousands of SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Phyllis Clark, Bill Rogers, Mary Neely Comment (116)

Publication Date:2/1/2021 Citation: 86 FR 7747