ML20249A576

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 70-7002/98-09 on 980608-11.No Violations Noted.Insp Included Review of Approved Portsmouth Physical Security Plan
ML20249A576
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 06/15/1998
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20249A577 List:
References
70-7002-98-09, 70-7002-98-9, NUDOCS 9806170091
Download: ML20249A576 (2)


Text

r- .

n-1 g

l June 15, 1998

[

Mr. J. H. Miller

- Vice President- Production I United States Enrichment Corporation Two Democracy Center l 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

NRC INSPECTION REPORT 70-7002/98009(DNMS)

Dear Mr. Miller:

This letter refers to the inspection conducted June 8-11,1998, at the Portsmouth Gaseous Diffusion Plant. The inspection included a review of the approved Portsmouth Physical Security Plan. At the conclusion of this inspection, the findings were discussed with members of your staff during a exit on June 11,1998. The enclosed report presents the results of this inspection.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of interviews with personnel, observations of activities in progress, walk-throughs with your staff, and selected examination of procedures and associated records.

Based on the results of this inspection, the NRC has determined that all findings from the September 2-5,1997, security inspection have been property addressed and closed. ,

l _. No violations of NRC requirements were identified during the course of this inspection. l l

In accordance with 10 CFR 2.790 cf the NRC's " Rules of Practice," a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Sincerely, ,

Original Signed by )

9906170091 990615

~ ' 9'l gDR ADOCK 07007002 Patrick L Hiland, Chief N Fuel Cycle Branch Docket No. 70-7002 '

r ertificate No. GDP-2 Enct:3sure: Inspection Report 70-7002/98009(DNMS) l.

p DOCUMENT NAME: G:\SEC\POR98009.DNM To recchn a co my of this !::_ : ^ indicate in the box: "C" = Copy w/o anach/end T = C)py w/ attach /end "tr' = No copy

' OFFICE Rlll:DNMS 0 Rlll:DNMS lN l NAME Kniceley/ldc wi, Hiland - @W DATE 06/15/98- 06/lf/98 -

OFFICIAL RECORD COPY

J. Miller ~ cc w/ encl: J. M. Brown, Portsmouth Genera! Manager D. B. Waters, Acting Manager, Portsmouth Regulatory Affairs S.' A. Polston, Paducah General Manager -

S. A. Toolle, Manager, Nuclear Regulatory Assurance and Policy, USEC Portsmouth Resident inspector Office Paducah Resident inspector Office R. M. DeVault, Regulatory Oversight Manager, DOE E. W. Gillespie, Portsmouth Site Manager, DOE Distnbution:

Docket File nd PUBLIC I 7w OCFO/L ARDw/end /end R. Pi?rson, NMSS w/enci P. Ting, NMSS w/end W.Troskoski, NMSS w/ encl P. Harich, NMSS w/end

. Y. H. Faraz, NMSS w/end -

C. J. Paperiello, Rlli w/end

- J. L. Caldwell, Rlli w/end C. D. Pederson, Rlli w/end

- Rlli Enf. Coordinator w/end R. Bellamy, RI w/ encl EJM, Rll (e-mail)

' D. B. Spitzberg, RIV/WCFO w/ encl IEO (e-mail)

DOCDESK (e-mail)

Greens w/o enci

'!