Informs That on 990812,NRC Completed three-day Licensing Review of Activities Associated with Usec 990526,certificate Amend Request (CAR) to Reopen Compliance Plan Issues 8,9 & 23 at Portsmouth Plant
ML20211G989
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 08/26/1999
From: Galloway M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
References
TAC-L32123, NUDOCS 9909010096
Download: ML20211G989 (2)


Text

_

August 26, 1999

~

  • t Mr. Stsvin A. To lls Nuclerr R gulatory Assurancs and Policy Minig:r l

United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive 1

Bethesda, MD 20817-1818

)

i

SUBJECT:

PORTSMOUTH GASEOUS DIFFUSION PLANT ONSITE LICENSING REVIEW AUGUST 9-12,1999 (TAC NO. L32123)

Dear Mr. Toelle:

On August 12,1999, the Nuclear Regulatory Commission (NRC) completed a three-day licensing review of activities associated with United States Enrichment Corporation's (USEC's) May 26, 1999, Certificate Amendment Request (CAR) to reopen Compliance Plan issues 8,9, and 23 at l

the Portsmouth plant. At the conclusion of the onsite review, NRC staff members discussed the J

l findings with both yourself and the Portsmouth staff.

l The purpose of the onsite review was to support NRC's assessment of your CAR to reopen Compliance Plan Issues 8,9, and 23 by determining the acceptability of USEC's proposal to l

reduce the scope of its Nuclear Criticality Safety (NCS) Corrective Action Plan (CAP) by l

performing only Augmented Quality (AQ)-NCS reviews on 93 Priority 3 Nuclear Criticality Safety l

Approvals (NCSAs)/ Evaluations (Es) identified for additional review, and 42 NCSAs/Es identified 4

l for consolidation or deletion.

The NRC staff determined that to support its review USEC needs to commit to: (1) perform a complete review of the NCSAs/Es identified for additional review, consolidation or deletion; and I

(2) evaluate these NCSAs/Es against robust criteria to determine appropriate action, including revision / upgrading, consolidation into upgraded Priority.1 or 2 NCSAs/Es, consolidation into an

' existing plant NCSA for abandoned equipment, or deletion of the NCSA/E as a nonfissile i

l material operation.

I j

in response to this request, USEC committed on August 12,1999, to implement draft procedure l

XP2-EG-NS1037, " Review of Non-Priority 1 and 2 NCSAs/Es," and initiating the review process.

l This procedure contains a robust set of criteria for making the determination of the adequacy of l

the NCSA/E. The NRC requests revision to NCS CAP Subtask 3.3 to document this commitment.

The NRC also requs% that USEC commit to a time frame for final disposition of the 42 l

NCSAs/Es identified for consolidation or deletion utilizing the additional review process.

Sin ry I

S,

\\

l M lan A. Galloway, Chief O

Enrichment Section Special Projects Branch f

fas"af'g'u"JBCfD ENTFH6Pi 0

)

Docket: 70-7002 Distribution:

NRC File Center PUBLIC FCSSrM l

Docket: 70-7002 -

Y. Faraz K. O'Brien, Region 111 P. Hiland, Region lli NMSSr#

SPBrM

)

GASPB\\LJB2\\ ports-Toollettr.wpd

(*See previous concurrence)

OFC SPB SPB SPB F.c SeB

/

1 NAME

  • LBerg
  • DHoadley i

DATE' 8/25/99 8/25/99 8/r0 /99 C = COVER E = COVER & ENCLOSURE N = NO COPY A1AA^*

'FFICIAL RECORD COPY 9909010096 990826 PDR ADOCK 0700 i

j

)

i

( 9h_

Steven A. Toelle, USEC /

the Priority 1 and 2 NCSAs/Es will be corrected. The NRC reques q

Subtask 3.3 to document this commitment.

The NRC also requests USEC commit to a time frame for final disp tion of the 42 NCSAs/Es identified for consolidation or deletion utilizing the additional revie process, i

Sincerely, Mela 'e A. Galloway, Chief Ent' hment Section ecial Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket: 70-7002

)

I Distribution:

NR File Center PUBLIC FCSS r/f l

Docket: 70-7002 Y. Faraz K. O'Brien, Region lli P. Hiland, Region Ill NMSS r/f SPB r/f G:\\SPB\\LJB2\\ ports'Toelleltr.wpd OFC

SPB, b,

/SPR,M. 6 SPB SPB LBk NAME D

a y

MGalloway RPierson v

DATE 8/2.[ /99 8/ 1/7 /99 8/

/99 8/

/99 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY f