Discusses Insp Rept 70-7002/99-05 on 990406-0515 & Forwards Notice of Violation Re Weakness in Staff Knowledge & Implementation of Plant Procedures in Several Program Areas
ML20207H500
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 06/11/1999
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Adkins J
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20207H504 List:
References
70-7002-99-05, 70-7002-99-5, NUDOCS 9906170096
Download: ML20207H500 (2)


Text

r i

  • hasw%q%,

UNITED STATES NUCLEAR REGULATORY COMMISSION l

e REGION ll!

g j

801 WARRENVILLE ROAD e

LISLE. ILLINOIS 60532-4351 k.....,/

June 11, 1999 1

Mr. J. N. Adkins Vice President - Production United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

NRC INSPECTION REPORT 70-7002/99005(DNMS) AND NOTICE OF VIOLATION

Dear Mr. Adkins:

On May 14,1999, the NRC completed a routine resident inspection at your Portsmouth Gaseous Diffusion Plant. The purpose of the inspection was to determine whether activities

)

authorized by the certificate were conducted safely and in accordance with NRC requirements.

At the conclusion of the inspection, the inspectors discussed the findings with members of your staff.

Areas examined during the 6-week inspection period are identified in the report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, interviews with personnel, and observations of activities in progress.

Based on the results of the inspection, the NRC has determined that two violations of NRC requirements occurred. The first violation, with multiple examples, is of particular concern because the violation indicates a weakness in your staff's knowledge and implementation of plant procedures in several program areas. The other violation indicates deficiencies in the instructions and procedures used in the vibration monitoring program for uranium hexafluoride process equipment.

The NRC has concluded that information regarding the reason for the violations, the corrective actions taken and planned, and the date when full compliance will be achieved is already adequately addressed in the enclosed inspection report. Therefore, you are not required to respond to these violations unless the description therein does not accurately reflect your corrective actions or your position, in that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed notice. However, you are requested to respond to the apparent generic weaknesses in your staff's knowledge and rigor of implementation of plant procedures that the individual violations indicate.

~

9906170096 990611 PDR ADOCK 07007002 C

PDR

r l

% ~, 5 ~

J. Adkins ' !

l In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

~ We will gladly discuss any questions you have concerning these observations.

]

Sincerely,

/s/ David J. Hartland for L

Patrick L. Hiland, Chief i

Fuel Cycle Branch l

Docket No. 70-7002 l

Certificate No. GDP-2 l

l cc w/ encl:

J. M. Brown, Portsmouth General Manager P. J. Miner, Manager, Nuclear Regulatory Affairs, Portsmouth H. Pulley, Paducah General Manager S. A. Toelle, Manager, Nuclear Regulatory i

Assurance and Policy, USEC Portsmouth Resident inspector Office Paducah Resident inspector Office R. M. DeVault, Regulatory Oversight Manager, DOE

]

i j

E. W. Gillespie, Portsmouth Site Manager, DOE i

Distribution:

j Docket File w/ encl PUBLIC IE-07 w/enci j

L R. Pierson, NMSS w/enci P. Ting, NMSS w/enci i-W. Troskoski, NMSS w/enci l

P. Harich, NMSS w/enci Y. H. Faraz, NMSS w/encI J. L. Caldwell, Rlll w/ encl C. D. Pederson, Rlil w/enci L

Rlli Enf. Coordinator w/enct R. Bellamy, R1 w/enci i_

EJM, Ril (e-mail)~

l_

D. B. Spitzberg, RIV w/enci l-LEO (e-mail)

DOCDESK (e-mail)

)-QQOO, u

Greens w/o enci DOCUMENT NAME: G:\\SEC\\por99005.dnm

^ To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N*= No copy OFFICE Rlll t)

Rlll c-NAME Knicelty:dp WL HilandN4%n'lR DATE 06/ll/99 06/6 /94 OFFICIAL RECORD COPY