ML20236P680
| ML20236P680 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/25/1987 |
| From: | Hansel J, Schanf J, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20236N530 | List:
|
| References | |
| QI-042-03, QI-42-3, NUDOCS 8708120469 | |
| Download: ML20236P680 (2) | |
Text
- - _ - - - _ - - - - - - - -
1 Page 1 of 2 E'lALUATION RESEARCH CORPORATION UNCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM QUALITY INSPECTION FOR ISSUE-SPECIFIC ACTION PIAN VII.c l
CHANGE NOTICE: 003 INSTRUCTION NO: QI-042 REVISION:
1 EFFECTIVE DATE: 06 25-87
.1 9
DOCUMENTATION REVIEW OF FIELD FABRICATED TANKS The QI identified above is hereby changed as shown on the attached page of this notice.
Prepared by:
Date:
4 ~/9'I7
.y.
/
Appro ed by:
(
Date:
(, - A F-47 Is ue Coordinator Approved by:
Date: d-$Y-72 On-s'ite QAgesentative
~
h!2 87 Approved by:
Date:
e ycR.v..,..E..d.r ur>m nune
^
i-3 CHANGE NOTICE 003.
-QI-042 i
Rev. 1 1
1 Page.7,: Attribute 10
)
l
- The wording of this attributeishould be revised to read:
i o
i lv t
- 10. 'Materful Verification.
Verify that the Matal Material Verification Summary' Sheet (See i.15) and any Supplemerital' Summary Sheet (s) Lof Material. Verification' identify the correct material'(See material requirements on Certified Drawings) and'that;the "CTR.
u l
Checked" space'on the Metal Material Verification Summary.
j
. Sheet is signed.
'I
.e sw
&c j h..~
qu 4