ML20236H088

From kanterella
Jump to navigation Jump to search
Forwards Bimonthly Progress Rept 5:New Switchgear Bldg Const, Per 10CFR50,App R
ML20236H088
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/31/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236H091 List:
References
B12619, NUDOCS 8708050057
Download: ML20236H088 (1)


Text

l <

CONNECTICUT YANKEE ATOMIC POWER COMPANY ,

I BERLIN. CO N N ECTIC UT P. O. BOX 270 H ARTFORD. CONNECTICUT C6101 1

T EL E PHOpe t 203-666-6911 July 31,1987 Docket No. 50-213 B12619 Re: 10CFR50, Appendix R U.S. Nuclear Regulatory Commission l

Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

l Haddam Neck Plant I Bimonthly Progress Report No. 5 New Switchgear Building Construction On September 30, 1986,(1) Connecticut Yankee Atomic Power Company committed to provide the NRC Staff with updated bimonthly progress reports in accordance with the major milestone schedule for construction of the new l switchgear building at the Haddam Neck Plant. The purpose of this letter is to provide the NRC Staff with the fifth of these reports. Bimonthly Progress Report No. 5 is included as Attachment I.

We trust you will find this information satisfactory, and we remain available to assist you in the review of this matter.

l Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

( ff" *d E. T.

Senio/aroczka r Vice President#

cc: W. T. Russell, Region 1 Administrator J. T. Shediosky, Resident Inspector, Haddam Neck Plant l

F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant 1

(1) 3. F. Opeka letter to C.1. Grimes, dated September 30,1986, "Haddam Neck Plant, Major Implementation Milestones, New Switchgear Building Construction." 7