ML20215K133

From kanterella
Jump to navigation Jump to search

Forwards Amend 18 to Fsar.Submittal Meant to Keep NRC up-to- Date on Changes That Have Occurred Since 870501 Submittal. Util Determining Need to Conduct Safety Evaluations Per 10CFR50.59 Re Changes Submitted W/Amend
ML20215K133
Person / Time
Site: Beaver Valley
Issue date: 06/22/1987
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20215K135 List:
References
2NRC-7-160, TAC-65611, NUDOCS 8706250225
Download: ML20215K133 (6)


Text

w n y -

1s

,)"'

1f A

2NRC-7-160' Beaver Valley No. 2 Unit Project Organization S.E.G. Building Telecopy 1 Ext.160  !

i

~ P.O. Box 328 June 22, 1987 f Shippingport, PA 15077 I

United States' Nuclear Regulatory Commission  !

j ATTN: Document Control Desk Washington, DC 20555 l

)

i

SUBJECT:

Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Final Safety Analysis Report' - Amendment 18 i

-l

REFERENCES:

(5) 2NRC-7-098, dated May 1, 1987 f (b) 2NRC-7-123, dated May 15, 1987 (c)- 2NRC-7-131, dated May 18, 1987 i Gentlemen:

Duquesne Light Company (DLC), acting on its own behalf and as agent for the Cleveland Electric Illuminating Company, Ohio Edison Company, and the ,

. Toledo Edison Company, is filing herewith three (3) signed originals plus sixty (60) copies of Amendment 18 to the Final Safety Analysis Report (FSAR) for the ,

8eaver Valley Power Station Unit No. 2 (BVPS-2).

Submittal of this amendment is meant to keep the staff up-to-date on changes that have occured since our previous submittal (Reference a), but is not intended to satisfy the requirements of 10CFR50.71. Because Amendment 18 includes changes which were incorporated prior to the issuance of the BVPS-2 j

Operating License, we are presently determining the need to conduct safety J evaluations per 10CFR50.59 criteria on changes submitted with this amendment.

In references (b) and (c), OLC provided FSAR changes for this amendment  !

which we believed could impact the Staff's Safety Evaluation Report (SER). j Attachment #1 provides a brief description of FSAR changes, not included in references (b) or (c), which we believe could impact the SER.

s' United States Nuclear Regulatory: Commission

. Final ~ Safety: Analysis Report - Amendment 18

- .Page 2:

, :n i

( Please' insert the revised Amendment 18 material into the FSAR as per lthe'

' Amendment Instruction Sheet.

DUQUESNE LIGHT COMPANY By .

ud.ff. Carey /

SenioWVice: President RWR/ijr NR/RWR/FSAR/18

Attachment:

AR/NAR' 3 cc: Mr. P.' Tam, Project Manager .(w/a).

Mr. J. Beall, NRC Sr. Resident Inspector' (w/a)

Mr.'L. Prividy, NRC Resident Inspector (w/a)

INP0 Records Center (w/a)

J '

i j k'

1 i

4 United States Nuclear Regulatory Commission Final Safety Analysis Report - Amendment 18 )

Page 3 i

)

COMMONWEALTH OF PENNSYLVANIA ) '1 SS:  !

COUNTY OF BEAVER On this /[/M ' day of . /h/f , / [,beforeme,a Notary Public in and for. said,CoMonwealth and County, personally appeared J.

l J. Carey, who being duly sworn, deposed and said 'that' (1) he is Senior Vice l President of Duquesne Light,L(2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth  ;

in the Submittal are true and correct to the best of his knowledge. i

)

l

- 1//b h lfMW 7' Notary Public l 3 HULA 3. f ATTOM, NOTARY PUBUC ,

$NIPPIMPeti BORD. NAMR cCUM l sv cosessielt smans oci.n.19.80 em. eceegn* Nelm of ect**  !

l i

i l

i

ATTACHMENT #1 l

FSAR Description Sections Changed Sections Affected Steam Generator 7.2.2.2.3, 7.2.2.3.5, 7.3.3.12 l Level Control 7. 7.1. 7 - ,'

Solid Radwaste. 11.4 11.4 Management System Vital Access Routes 12.3.2, T12.3-4, 12.3.2 l

F12.3-19, 21, 22, 25, 25a, 26, 26a, 33, 34, 35 and 36 I

l i.

STONE & WEBSTER ENGINEERING CORPORATION i

i i 15 SUMMER STREET, BOSTON, M ASS AC HU SETTS

'd .

' ADDRESS ALL CORRESPONDENCE TO P.O. BOX 2325. BOSTON. M ASS. 02107 W. U. T E LEX: 94 0001 94 0977 DEslON ORK POR e o

=t= n= L "' 1 ENQlNEERING 4 PORTLAND.OREOON W AsHIN GTON, O C.

I i

Transmitted with this letter is Amendment 18 to Duquesne Light Company's  !

Beaver Valley Power Station - Unit 2 Final Safety Analysis Report (BVPS-2 ,

FSAR). Insertion instructions for Amendment 18 pages are also included. .

Please acknowledge receipt of your BVPS-2 FSAR Amendment 18 package by j completing and returning the attached form.  ;

k .

V-  !

l I

i i

O  :

i l

9

.i

-4 jm) 5

% .. Acknowledgement of. Receipt of Amendment 18 to Final Safety. Analysis Report Beaver Valley Power Station - Unit 2' Pleasesign,(date,and-returnthissheetto:

Stone & Webster Engineering Corporation P. 0. Box 2325 Boston, MA 02107 . .

Attn: Mr. . J. Nawazelski, BVPS-2 Licensing 245/8 4

Receipt . of Amendment 18 to the Final Safety ' Analysis Report -(FSAR) ~ is acknowledged.

My copy has been brought up to date, and superseded. pages have been removed and destroyed.

l[l Change my address as follows:

((l Please' reassign this manual (as applicable to:

- Jp 1

Name Name of Organization Address City State Zip Code l

l Signature Date f:

Print name of person to whom FSAR is assigned

! Serial Number (located inside cover)

- __