ML19210D722

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required
ML19210D722
Person / Time
Site: Berkeley Research Reactor
Issue date: 11/09/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Schrock V
CALIFORNIA, UNIV. OF, BERKELEY, CA
References
NUDOCS 7911270500
Download: ML19210D722 (1)


Text

[pR MCg o

UNITED STATES

! \\*

NUCLEAR REGULATORY COMMISSION

\\ k g

c-

.p REGION V o '-

s.

1990 N. CALIFORNIA BOULEVARD k '.%

b o

SusTE 202, WALNUT CREEK PLAZA

  • . fe WALNUT CREEK, CALIFORNIA 94596 November 9,1979 Docket No. 50-224 University of California Department of Nuclear Engineering Berkeley, California 94720 Attention: Virgil Schrock Reactor Administrator Gentlemen:

This Information Notice is provided to inform licensees of a possible significant matter.

It is expected that recipients will consider dis-semination of the information to all persons working at their licensed facilities.

No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, ISTL,ac.-.

R. H. Engelken Director

Enclosures:

1.

IE Information Notice No.79-12A 2.

Recently Issued Information Notices

}399 b

w..~ a m

SSIMS f!o.:

6300 United States Accession f'o. :

fluclear Regulatory Commission 7910250490 Office of Insoection and Enforcenent Washington, D.C.

20555

[

D 3

{

November 9, 1979

'^J S

IE Infomation f!otice flo.79-12A ATTEMPTED DAMAGE TO NEW FUEL ASSEP.BLIES This notice orovides supplemental infomation concerning the identification and conviction of the persons responsible for the introduction of a oossibly damaging substance to the new fuel stored at the Virginia Electric and Power Comoany's Surry Power Station in Surry County, Virginia.

Investigation of this incident by the FPI culminated in the surrender of William E. Kuykendall and James A. Merrill, Jr., both VEPC0 employees at that time, to Surry County authorities on June 19, 1979.

A Grand jury hearing was held in Surry, Virginia on July 24, 1979. The certified charges of breaking and entering with intent to damage electrical facilities (felony), and willful destruction of utility company equipment (felony) were returned on a true bill for trial. An earlier charge for willful damage (mis-demeanor) which had not been certified to the grand jury was reapplied, certified and returned on a true bill for trial. Two additional charaes against both men were introduced for conspiracy regarding the two felonies and returned on a true bill for a total of four felonies and one misdemeanor against each man.

Trial comenced on October 10, 1979 in the Circuit Court, Surry County, Virginia.

The presidina judae ruled that the prosecution failed to suoply sufficient evidence to suoport the charges of conspiracy, breakina and entering, and damage to pro-perty as a misdereanor. The primary reason for drooping the charges was that the subjects had been authorized unescorted access to Vital Areas by VEPC0. On October 17, 1979, the jury returned a verdict of auilty (both Kuykendall and Merrill) for violation of Virginia Code 18.2-162 (Intentional danage to a facility which furnishes electric service to the public) and set punishment as two (2) years in the State Penitentiary for both subjects, the mininun sentence provided by 1aw.

This Infomation flotice is provided to inform licensees of a possibly significant matter.

It is expected that recipients will consider dissemination of the infomation to all persons working at their licensed facilities.

If you have questions reoarding this natter, please contact the Director of the appropriate flRC Regional Office.

fio written response to this Infomation Notice is required.

1399 707

IE Information Notice No.79-12A Enclosure floverber 9,1979 RECENTLY ISSUED IE INFORMATION NOTICFS Information Subject Date Issued To Notice No.

Issued 79-26 Breach of Containment 11/5/79 All oower reactor facilities Inteority holdina OLs and cps 79-25 Reactor Trips At Turkey 10/1/79 All nower facilities with Point Unit 3 And 4 an OL or a CP 79-24 Overpressurization Of 9/28/79 All power reactor facilities Containment Of A PWR Plant with a CP After A Main Stream Line Break 79-23 Emergency Diesel Generator 9/25/79 All oower reactor Lube Oil Coolers facilities holding OLs and cps 79-22 Oualification of Control 9/14/79 All power reactor Systems facilities with operating licenses and construction permits.

79-21 Transportation and Commercial 9/7/79 All power and research Burial of Radioactive Material reactors with OL's 79-20 NRC Enforcement Policy 8/10/79 All Holders of Reactor NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-19 Pipe Cracks In Stagnant 7/17/79 All Holders of Reactor Borated Water Systems At OLs and cps PWR Plants 79-18 Skylab Reentry 7/5/79 All Holders of Reactor OLs 79-17 Source Holder Assembly Danace 6.20/79 All Holders of Reactor From flisfit Between Assenbly OLs and cps and Reactor Upper Grid Plate 79-16 Nuclear Incidnet at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs zgg '0B