Letter Sequence Draft Approval |
---|
|
|
MONTHYEARML20214T8711985-03-0707 March 1985 Requests Addl Info Specified in Encl Draft Ltr for Review of Licensee Response to Generic Ltr 83-28 Project stage: Draft Approval ML20210D1111986-09-11011 September 1986 Forwards Safety Evaluation & SALP Input Re Generic Ltr 83-28,Items 3.2.1 & 3.2.2.TAC 53749 May Be Closed Project stage: Approval 1985-03-07
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants 1999-08-27
[Table view] |
Text
7: ,
o y JcG. L.g
. s e" "ECo,#'o, UNITED STATES 3[/yi c.c 'i
'j NUCLEAR REGULATORY COMMISSION.
REGION V-
- 3,.g$ ' .'s;'" g 1450 MARIA LANE,sulTE 210
%, ' N ># ,d WALNUT CREEK, CALIFoRNI A 94596
"*** MAR 7 1985 MEMORANDUM FOR: ' Hugh R. Thompson, Jr. , Director Division of Licensing, NRR FROM: Dennis F. Kirsch, Acting Director Division of Reactor Safety and Projects
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83-28 TACS NOS. 52913, 53749, 53068 and 54059 Plant Name: Diablo Canyon Unit 1 Docket No: 50-275 Responsible Branch: Licensing Branch No. 3 Project Manager: H. Schierling Review Status: Incomplete In order to complete our review of this item, we find we need additional information as specified in the enclosed draft letter to the licensee. If you concur with these needs, please transmit this letter to the licensee at your earliest coevenience.
If yc,u have any questions, please call Jerry Zwetzig at FIS 463-3749.
e D nais . Kirsch, Acting Director Division of Reactor Safety and Projects
Enclosure:
Draft letter to licensee cc: H. Schierling, NRR G. Knighton, NRR }{
'( <
T. Alexion, NRR f S J. Stevens, NRR J. Hopkins, NRR gh '
hg J. Hannon, NRR v T. Novak, NRR J. Thoma, NRR R. Pate, RV D. Kirsch, RV G. Zwetzig, RV l
/l 0706100460 870604 PDR FOIA HOLMES86-197 PDR j
-t .
Docket No. 50-275 Mr. J. D. Shiffer, Vice President Nuclear Power Generation -
c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106
Dear Mr. Shiffer:
SUBJECT:
GENERIC LETTER 83-28 The staff is continuing its review and evaluation of the PG&E responses to Generic Letter 83-28, Implications of Salem ATWS Event. Based on our review as of this date we have identified the need for additional information as listed in the enclosure. It is requested that you provide the information identified in the enclosure within 30 days.
Sincerely, George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page.
i I
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION RELATING TO GENERIC LETTER 83-28 Facility: Diablo Canyon Unit 1 Docket No: 50-275 ,
- 1. )
Regarding Position 3.1.1, please confirm that the post-maintenance l testing required of safety-related components in the reactor trip system, demonstrates that the component is capable of performing all required {
s safety functions.
- 2. Regarding Position 3.1.2, your letter of January 2,1985, indicated that nine vendor recommendations still required review. Please confirm that this review has been completed for Unit I and that appropriate procedure revisions have been completed.
(
- 3. Regarding Positions 3.2.1 and 3.2.2, your letter of November 7, 1983, committed to submit a statement by August 1,1985, confirming implementation of these positions for Unit 1. Please ensure that the post-maintenance testing required of all safety-related components by such implementation, will verify the capability of components to perform all required safety functions. In addition, please explicitly confirm in your August 1 submittal that post-maintenance testing will verify this capability.
- 4. Regarding Position 4.5.1, your letter of January 24, 1985 (in Enclosure 2, paragraph B), states that "...on-line, independent, functional testing of the undervoltage and shunt trip features is performed in Modes 1 through 4, after maintenance, in accordance with STP I-33C." Please indicate the minimum frequency of breaker maintenance. This is needed to verify that the individual functienal testing will be performed "on-line" in Modes 1 through 4, as well as during refueling outages.
/