SEP 111986 MEMORANDUM FOR: Hugh L. Thompson, Jr., Director Division of Pressurized Water Reactor Licensing - A FROM:
Dennis F. Kirsch, Director Division of Reactor Safety and Projects
SUBJECT:
REGION V SAFETY EVALUATION REPORT FOR q
DIABLO CANYON POWER PLANT, UNIT NO. 1 J
GENERIC LETTER 83-28, ITEMS 3.2.1 AND 3.2.2 TAC NO. 53749 Plant Name:
Diablo Canyon Unit 1 Docket Number:
50-275 Responsible Directorate:
PWR Project Directorate No. 3 Project Manager: H. Schierling Review Status:
Complete Enclosed is the Region V Safety Evaluation Report addressing the subject licensing action.
Inasmuch as this action has been completed, TAC Number 53749 may be closed.
]
We have also enclosed the SALP input requested by NRR Office Letter Number 44.
If you have any questions regarding this SER, please contact Jerry Zwetzig at FTS 463-3749.
/s Dennis F. Kirsch, Director Division of Reactor Safety and Projects
Enclosures:
As Stated cc:
H. Schierling, NRR S. Varga, NRR R. Emch, NRR L. Kintner, NRR M. Mendonca, RV P. Narbut, RV J. Burdoin, RV 8609190055 860'711 A
0500 5
R. Pate, RV G. Zwetzig, RV via 5520: Division of PWR Licensing - A, NRR, Attn:
H. Schierling ID: Diablo TAC No. 53749 RV/jk h ld 0 ZWETZIG PATE KIRSCH 9[/86
/
9/ b/86 9/ /86 l
t I
e UNITED STATES 8
NUCLEAR REGULATORY COMMISSION g
.p REGION V
\\*****,e4 1450 MARIA LANE. SUITE 210 WALNUT CREE K, CALIFORNIA 94596 SEP 111986 MEMORANDUM FOR: Hugh L. Thompson, Jr., Director Division of Pressurized Water Reactor Licensing - A FROM:
Dennis T. Kirsch, Director Division of Reactor Safety and Projects
SUBJECT:
REGION V SAFETY EVALUATION REPORT FOR DIABLO CANYON POWER PLANT, UNIT NO. 1 GENERIC LETTER 83-28, ITEMS 3.2.1 AND 3.2.2, TAC NO. 53749 Plant Name:
Diablo Canyon Unit 1 Docket Number:
50-275 Responsible Directorate:
PWR Project Directorate No. 3 Project Manager: H. Schierling Review Status:
Complete Enclosed is the Region V Safety Evaluation Report addressing the subject licensing action. Inasmuch as this action has been completed TAC Number 53749 may be closed.
We have also enclosed the SALP input requested by NRR Office Letter Number 44.
If you have any questions regarding this SER, please contact Jerry Zwetzig at FTS 463-3749.
Dennis F. Kirsch, Director Division of Reactor Safety and Projects
Enclosures:
As Stated cc:
H. Schierling, NRR S. Varga, NRR R. Emch, NRR L. Kintner, NRR M. Mendonca, RV P. Narbut, RV J. Burdoin, RV R. Pate, RV G. Zwetzig, RV via 5520: Division of PWR Licensing - A, NRR, Attn:
H. Schierling ID: Diablo TAC No. 53749
SALP INPUT FOR COMPLETED SER Organization Preparing SALP Input: Region V Facility: Diablo Canyon Unit 1 Docket No.: 50-275 Phase: Operating SER
Subject:
Generic Letter 83-28, Items 3.2.1 and 3.2.2 TAC No.: 53749 FUNCTIONAL AREA: Licensing Activities Evaluation Criteria:
1.
Management Involvement in Assuring Quality The licensee's submittals reflected a management program where activities affecting quality were adequately controlled.
Rating: Category 2 2.
Approach to Resolution of Technical Issues from a Safety Standpoint The licensee's approach to these items appeared to be based solely on safety considerations. There was no indication the licensee was attempting to compromise safety.
Rating: Category 1 3.
Responsiveness to NRC Initiatives While the licensee's responses to these items were satisfactory, the licensee did require about two and one-half years to provide the responses. The need for improvement in this area is indicated.
Rating: Category 3 4.
Reporting and Analysis of Reportable Events Not observed Rating: None 5.
Staffing (Including Management)
Based on the length of time required to conduct the requested review and provide responses to these items, we conclude the staffing in this area of the licensee's organization is marginal.
Rating: Category 3 6.
Training and Qualification Effectiveness Based on the quality of the licensee's submittal, it appears the training and qualifications of the individuals preparing the submittal were satisfactory.
l Rating: Category 2 I