Forwards Insp Rept 50-461/97-14 on 970524-0707 & Nov. Inspectors Identified That Min Illumination Level in Protected Area Failed to Meet Regulatory Requirements & Programmatic Controls Design Not Effectively Implemented
ML20212B395
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/14/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
ILLINOIS POWER CO.
Shared Package
ML20212B400 List:
References
50-461-97-14, NUDOCS 9710280078
Download: ML20212B395 (3)


See also: IR 05000461/1997014

Text

i* I '

UNITED STATES

[#84 .,\, 9-

NUCLEA] RE ULATCRY COMMISSION

g g nEoioN lil

C- 'j g

801 WARRENVILLE ROAD

/

.

UsLE, ILUNOG 00532-4351

'..... October 14, 1997

Mr. John G. Cook

Senior Vice President

Clinton Power Station

Illinois Power Company

Mail Code V 275

P. O. Box 678

Clinton,IL 61727

.

SUBJECT:

NRC INSPECTION REPORT NO. 50-461/97014(DRP)

Dear Mr. Cook:

On July 7,1997, the NRC completed an inspection at your Clinton facility. The enclosed report

presents the results of that inspection.

.

During the pe'iod covered by this inspection, we noted continued decline in the quality of

maintenancI activities that occurred during the last two inspection periods. Specifically, poor

maintenance work practices have resulted in damage to plant equipment and inadvertent

actuations of plant systems.

We are also concemed about the four violations of NRC requirements described in the enclosed

Notice of Violation. In the first instance, three examples of procedure non-compliance regarding

the uae of load impact lists, the performance of maintenance activities, and the implementation

of modifications were identified. These violations are of concem because they represent

additional examples of a well documented problem area involving procedural compliance. In the

fourth violation, NRC inspectors identified that the minimum illumination level in the protected

area failed to meet regulatory requirements and your staff had not effectively implemented

programmatic controls designed to ensure protected area illumination requirements were

satisfied at all times.

These violations are cited in the enclosed Notice, and the circumstances surrounding the

violations a.e dscribed in detailin the enclosed report. Please note that you are required to

respond to this letter oc.d should follow the instruction specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to determine svhether further

enforcement actions are necessary to ensure compliance with regulatory requirements.

In addition to the routine resident inspection at Clinton power Station, the enclosed report

documents the resutts of a specialinspection conducted by members of the NRC headquarters (

staff from the Office of Nuclear Reactor Regulation.

l

9710200070 971014

PDR

O

ADOCK 05000461

PDR

U

\

( TN

,

,

f

w

k,'

, s

f

~J. Cook ' -- -

2

1The results of that specialinspection provide insight into the causes of multiple violations

associated with human performance and procedural adherence that occurred at Clinton Power

Station between September 1996 and February 1997, as documented in several NRC inspection -

reports. The spe.cial inspection revealed weaknesses in the oversight of activities by :

management, the safety culture of Clinton staff and management, and the teamwork and

- communications among departments and between Clinton management and staff. These and

other causal factors will be further developed and refined through implementation of the ongoing

Clinton Integrated Safety Assessment and NRC Special Evaluation Team,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,-

.

ohn A. Grobe, Acting Director

Division of Reactor Safety

-

Docket No.: 50-461

License No: NPF-62

i

,

Enclosures: 1 Notice of Violation

2. Inspection Report

No. 50-461/97014(DRP)

cc w/encts: W. D. Romberg, Assistant

Vice President- '

R. Phares, Manager, Nuclear Safety

and Per,*0rmance improvement

'

.

J. Sipek, Director- Licensing

Nathan Schloss, Economist

i Office of the Attomey General

G. Stramback, Regulatory Licensing

Services Project Manager

. General Electric Company

- Chairman, DeWitt County Board -

.

2

- State Liaison Officer

Chairman, Illinois Commerce Commission

,

%

(" - -

. , _ . . . _ , , , . . . , , + + . ..---1 - ' - - + - - ' ~ " - - - ' - ' ~ ' ' - - - - " - " - " ' ' - " ^ ^ ~ " ' ' ' ~ ~ - - - ' ^ ^ ^

_ _ __ _ ___ . _ _ _ _ _ _ .- _ _ _

. .

j J. Cook -2-

- The results of that specialinspection provide insight into the causes of multiple violations

associated with human performance and procedural adherence that occurred at Clinton Power

Station between September 1VA and February 1997, as documented in several NRC inspection

reports. The specialinspection revealed weaknesses in the oversight of activities by

management, the safety culture of Clinton staff and management, and the teamwork and -

communications among departments and between Clinton management and staff. These and

other causal factors will be further developed and refined through implementation M the ongoing

Clinton integrated Safety Assessment and NRC Special Evaluation Team,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

/s/ John A. Grobe

John A. Grobe, Acting Director

Division of Reactor Safety

Docket No.: 50-461

License No: NPF-62

Enclosures: 1. Notice of Violation

2. Inspection Report

No. 50-461/97014(DRP)

l

l cc w/encis: W. D. Romberg, Assistant

Vice President

R. Phares, Manager, Nuclear Safety

ar$d Performance Improvement

J. Sipek, Director- Licensing

Nathan Schloss, Economist

Office of the Attomey General

G. Stramback, Regulatory Licensing

Services Prcject Manager

General Electric Company

Chairman, DeWitt County Board

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/enci DRP w/enci

OC/LFDCB w/enci PUBLIC IE 01 w/enci

SRI Clinton w/enci Rill PRR w/enct

Project Manager, NRR w/enct CAA1 w/enci (E-mail)

Rlli Enf. Coordinator w/enci A. B. Beach w/enct

TSS w/enci Deputy RA w/enci

DOCDESK (E mail) DRS (2) w/enci

DOCUMENT NAME: G:\ CLIN \CLl97014.DRP

To receive a copy of this document Indicate in the bom "C= a Copy without attachmentiendoeuro T e Copy with estachment/ enclosure V e No copy

OFFICE Rlli ,- ,1 Rill lM Rlli _l Rlli mh/ l

NAME JCreed:nh ffAfft- GShear GC GWrightL(h/ JGr6@

DATE 10/re /97 ' 10/;&97 1010/97 10/A/97

'

OFFICIAL RECORD COPY

/77*

ch~w v* m o O W

Q ( tb Oj N

m,sc0rev4%-

f(c&