Forwards Insp Rept 70-7002/98-18 on 981123-990112 & Nov. Violation of Concern Because Plant Staff Failed to Adjust Process Motor Load Alarm Setpoints as Required by Procedure
ML20202D745
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 01/26/1999
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Adkins J
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20202D749 List:
References
70-7002-98-18, NUDOCS 9902020101
Download: ML20202D745 (2)


Text

_-_ _- _-__

January 26, 1999 1

Mr. J. N. Adkins Vice Preskient - Production United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

NRC INSPECTION REPORT 70-7002/98018(DNMS) AND NOTICE OF VIOLATION

Dear Mr. Adkins:

On January 12,1999, the NRC completed a routine resident inspection at your Portsmouth Gaseous Diffusion Plant. The purpose of the inspection was to determine whether activities authorized by the certificate were conducted safely and in accordance with NRC requirements.

At the conclusion of the inspection, the inspectors discussed the findings with members of your staff.

Areas examined during the seven week inspection period are identified in the report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, interviews with personnel, and observations of activities in progress.

Based on the results of the inspection, the NRC has determined that a violation of NRC requirements occurred.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violation are described in detail in the enclosed report. The violation is of concem because plant staff failed to adjust process motor load alarm setpoints as required by procedure. Your Safety Analysis Report credits operator action to mitigate accidents in the cascade, and the load alarms are the primary mechanism for alerting operators of abnormal

- conditions.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

4

~

9902020101 990126 .

. PDR ADOCK 07007002?

? C -

PDR t s

~

J. Adkins We will gladly discuss any questions you have conceming these observations.

Sincerely,

/s/ P.L. Hiland Patrick L. Hiland, Chief Fuel Cycle Branch Docket No. 70-7002 Certificate No. GDP-2

Enclosures:

1. Notice of Violation
2. Inspection Report 70-7002/98018(DNMS) cc w/encis: J. M. Brown, Pc'tsmouth General Manager P. J. Miner, Manager, Nuclear Regulatory Affairs, Portsmouth H. Pulley, Paducah General Manager S. A. Toelle, Manager, Nuclear Regulatory Assurance and Policy, USEC Portsmouth Resident inspector Office Padur S 7esident inspector Office R. M. .Y i%!t. Regulatory Oversight Manager, DOE E. W. Gillespie, Portsmouth Site Manager, DOE Distribution:

Docket File w/encls PUBLIC IE-07 w/encls R. Pierson, NMSS w/encls P. Ting, NMSS w/encls W. Troskoski, NMSS w/encls P. Harich, NMSS w/ enc!s Y. H. Faraz, NMSS w/encls J. L. Caldwell, Rlli w/encls C. D. Pederson, Rill w/encls r Rlli Enf. Coordinator w/encls R. Bellamy, RI w/encls EJM, Ril (e-mail) }

D. B. Spitzberg, RIV/WCFO w/encls IEO (e-mail) l 1

DOCDESK (e-mail)

Greens w/o encls 0201G5 DOCUMENT NAME: G:\SEC\POR98018.DNM To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure E*= Copy with enclosure *N"= No copy DFFICE Rlli . lp/ l l NAME Hiland:ib PJ.W DATE 01/$/99 OFFICIAL RECORD COPY

_