Text

.

  • i 3RCWN & ROOT, INC. PRCCEDURE EFFECTIVE CPSES NUMBER REVISION DATE FACE

= -

l

. i CP-CPM 7. lG 1 08/31/84 1 of 3 TITI.Z: ORIGINATOR

- ' Data g

REVIIWED ST: ;

~

-) #' 7 a M R QA Data CP-CPM 7. LG k, , gy , h0,h/, ,,y k?,h' (APPENDIX G) IUGC0 QA Date PIPING SUPPORTS /-

APPROVED BT: '

h .bA e. . t /W 0~$f Cate CONSTRUCICN PROJECT XGR o.i TABIE OF CONTEKrS

1.0 INTRODUCTION

2.0 REFERENCES

h ['i * - D 4

3.0 PIPING SUPPORT HP PREP ARATI0Nk .

PIPING SUPPORT HP MAINTENANCE'f,/ Uk / -

4.0 *- , ' k.

l 5.0 P IP ING SUP P ORT HP D ISTR IBUT ION - ! r o.ii ATTACHMENTS

1. Pipe Hanger Installation Report Non-Q
2. HP Responsibility Trans fer Sheet
3. Inspection Report Status Sheet
4. Request Hanger or Parts Form

1.0 INTRODUCTION

The purpose of this Appendix is to describe the requirements for preparation, distribution, and maintenance of documentation packages (Hanger Packages) for Piping Supports (HP 's) . This Appendix shall be used in conjunction with CP-CPM 7.1A for the preparation of HP 's.

z.0 P E,-

CP-CPM 7. l' A F0lA-85-59 Documentation Package Preparation CP-CPM 7.11 Non ASME Q Documentation Package Review CP-CPM 9.9 NNS-Seismic Category II Supports CP-CPM 9.10 Fabrication of ASME-Related Component Supports DE I-9 Control of Cic's Generated for Component Support Hanger Packages 8607100336 860630 DE8 9 PDR

~

4 BROWN & ROE , INC. PROCEDURE EFFECIVE CPSES NUMBER REVISICN DATE PAGE JOB 35-1195 CP-CPM 7.lG 0 08/31/84 2 of 3 3.0 PIPING SUPPORT HP PREP ARATION 3.1 NNS-Seismic Category II Piping HP's shall be prepared by the PFG in accordance with CP-CPM 9.9 (Hanger Packages) .

3.2 ASME Piping HP's shall be prepared by the PFG in accordance with CP-CPM 9.10 (Hanger Packages) .

3.3 BOP large bore (2h" g and larger piping) piping HP's shall be prepared by the PFG. The HP shall consist of the following:

a. Drawing and design changes
b. Weld Filler Material Ing
c. Pipe Hanger Installation Report Non-Q (Attachment 1) 3.4 BCP small bore (2" 9 and smaller piping) piping supports shall be documented in accordance with established site instructions.

HP 's shall be prepared by the craft upon work completion and transmitted to the PEG. .

3.5 Inspection reports as well is other docu=ents identified in l CP-CPM 7.1A shall be inserted into the HP as applicable. The Package Inventory Card is not required in HP 's. CiC's shall be inserted and referenced in the HP in accordance with DEI-9.

4.0 PIPING SUPPORT HP MAINTENANCE 4.1 The PFG Coordinator is responsible for the storage and maintenance o f HP 's .

4.2 The PFG shall review the HP contents to assure that the HP is complete and all documents are to the current revision prior to initial issuance. Sub sequent review prior to reissuance is not required.

4.3 Upon completion of the piping support and return of the HP to the PFG, the PFG shall review the HP in order to assure that the required documentation is properly ' completed, accounted for, and to the current r evisio n. NNS-Seismic Ca tegory II HP 's shall be reviewed in accordance with CP-CPM 7.II.

U_"A

z . .= _. ..;; - - -- -

PROCEDURE BROWN & ROOT, INC.

CP-CPM 7.1G 0 08/31/84 3 of 3 i

4.4 Upon receipt of an asbuilt or vendor certified drawing, the PFG 4 shall obtain any other HP reviews needed to verify completion of the Pipe Support and HP.

4.4.1 EP 's which are complete pending final review, requiring additional asbuilt or vendor certified drawings, shall be maintained by the PFG in fire resistant cabinets with a one hour underwriter's 7

rating or in the IRV.

1 i 4.5 Reviewed HP 's shall be transmitted to the IRV utilizing Attachment 3 to CP-CPM 7.1.

5.0 PIPING SUPPORT RP DISTRIBUTION 5.1 EP's shall be issued to the craft or other groups upon request.

l The PFG shall maintain a data base showing the physical location  ;

l

o f each HP.

i 5.2 At the end of each shift, the cra ft Foreman shall return the HP 's j to the PFG. A Responsibility Trans fer Sheet ( Attachment 2) shall be filled out and returned for HP's which have been transferred to the other groups during the shift. A copy of the Request Hanger or Parts Form (Attachment 4) shall be returned from the cra ft for EP's which have been trans ferred to the fab shop

during the shift.

5.3 The PFG shall check the HP 's, the Responsibility Transfer - -

Sheets and the Request Hangers or Parts Forms returned from 4 t he cra f t to assure that all HP's have been returned or accounted for by Responsibility Transfer Sheets or the Request Ranger or Pa r t s Fo rms, i

l' 5.4 HP 's which are not accounted for per Para. 5.3 shall be identified to the PFG Coordinator for further action.

, 5.5 The craft Foreman shall complete and return an Inspection Report Status Shee t (Attachment 3) at the end of each shift. The Inspection Report Status Sheet shall indicate which inspection reports received status changes during the shift. Any inspection reports which changed status prior to a responsibility transfer i shall also be indicated on the IR Status Sheet.

j 5.6 The PFG shall utilize the IR Status Sheet to maintain current inspection report sta tus .

1 a

w-

,y, w,7-+r- , , ,------------m- , , . - - , wy v. -.w--w- g-9, . , -

._.vp-w=-.,,w--w_ .,_. ,#m,mm ,-a ,_ __,wm -

w- ,-w w-9 ,+.y

,gw %

p-

BROWN & RCCI, INC. PROCEDURE EFFECTIVE NUMBER REVISICN DATE PAGE CPSES JCB 35-1195 CP-CPM 7. lG 1 08/31/84 1 of 1 ATTACHMENT I PIPE HANGER INSTALLATION REPORT NON-Q FIPE MANGER INSTAI.MT*0N UFCRT NCN=Q

-t.t - r d * - . e -i s 1.I1:esti:n *31. ?- l

2. I !!e-t-i?- 731. 2- l
1. I c o--se - wa < I
a. I 1111 o f waterial l ha-et vi i 9 I S!!e ard 7:5.fi.; stier. Of '4aterial I
6. I Preeer 4 ?? 411tt ?olts I 9 I S te eil ed ~?ve sli
  • e-rt.9 411 ?elis  !
9. I it- te t wia. . Idre 31staree *:1. 1/1- '

l 4 I ?:- ect wi .. Wiltt Seacir: ? 1. 1/?" I 10.I til Milii Outside if Meeter? I .k I

11. I !ci t ? tite-- Sa.: e As Prt-t er tw* I s hY I 12.I2e tal felt ?ti'*-* ' U*Sitt' -

11 i ui wilti *:r- :e d to Stee. A is,I cer- e- J ef Welfs A te, co- eet *v e 6 Site :f Weid? '

Y

16. 'selde 1 Ir.1 *i a.l s OP. 411 ?.'d. l l 19 I ul C - or Pi .s tr. Plae* I

! !?.I W ele Wa-rer ?tia.ted I to . I C3- set 01e es.ee ?e vee- Pi-e 4 T s d .l

20. I !s v a -Eer !.siallei !!*4 I

..g. g _.,,

. . . . . . -4.s. gs .. n. .. ..t.

'Id;*K 3_e ,v;s e 3---r-  :-v 3  :-

l l I  !

l

} t i '

l i i I l

! I I

l l

.-.-_.: . - . - . . .: ~.  :.-- . ..

BROWN & RCCI, INC. PRCCEDURE EFFECTIVE NUMBER REVISION DATE PAGE CPSES JCB 35-1195 CP-CPM 7. IG 1 08/31/84 1 og 1 ATTACEMENE 2 HANGER PACKAGE RESPOSIBILITY TRANSFER SHEET li483 1

HANGER PACKAGE RESPONSIEILITY TRANSFER SHEET Toi WELOING ENGINEERING Oates

. HANGER Mk" PART I.

PLEASE UPDATE H.I.T.S. CCOES TO REFLECT RESPONSIBILITY TRANSF ON ASOVE HANGER '

PACKAGE:

(FROM) ( TO ) t O CRAFT C ENGINEERING 1 i tatratstwritivt) t atpat:ta ra tiv t)

O AREA MANAGEMENT O AREA MANAGEMENT (SEP*ESENTAfivE) (REPa(SINTATWEL PART E. (FCR ENGINEERING USE CNLY)

NO WELOING M00lFICATION RECulRED, FLEASE UPDATE H.I.T.S. CCOES TO REFLECT RESPONSI-BILITY TRANSFER FCR THE ASOVE HANGER PACKAGE E ACK TO :

O CRAFT 1 t a rn estatarwe i .:Arti ce4*%

1-- , x

+9

-. - ..-. : . - - . . .  :. . u-. . . - . - . . _ --. . . . . ..

=

3RCWN & RCCI, INC. PROCEDURE EFFECTIVE NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CP-CPM 7.1G 1 08/31/84 1 of 1 ATTACHMENT 3 i INSPECTION REPORT STATUS SHEET InsMCflom ACPORT Status $Htti I. LIST ALC INSMCT104 ACPQRTS ACCT!VING $TAfuS CHANGES Outing TH( SMIFT.

5

  • 1Afl1FACf0Af U = UNSAf!$FACTCAf n . Petv10usLY un5Af!5FACf0RY 30W SAf!5FACTORT.

!!. IF NO STATU$ CHANGES QCCUA welft N/A In THE 157 MARGER MAAK f.

III. fais atP0af usuST BE fuAnt3 Im AT THE (20 0F EACH SHIFT.

MANG[2 MARK f IN5MCTION REPORT #

STAfuS Init:ALS a

go -

FOREMAM'5 5;GaArgsg QATE A

fr- m e ,w

' --- - < r-r , .g .. , , . _ _ ,

. . .;._---_ . . T;.--------..-..-----

e . .

. s 3RCWN & ROCI, INC. PRCCEDURE EFFECTIVE NUMBER REVIS!CN DATE PAGE CPSES JOB 35-1195 CP-CPM 7.1G 1 08/31/84 1 Of 1 ATTACHMENT 4 REQUEST HANGER OR PARTS

.~. ,

l neouss7 NANoen on pants o.,,, / /

FOaEMAN MANGER NO : mEV attus NEEDEO Ptn ameNr.

ITEus NEEDED PER Cnac.

Cuc N O. - m E v. : ff 0 N -

mEQutST MesC. martmiAL FOm AeovE MANGER mEQUESTITEMS ptFASSED 4 AEASON mEQutSt stCElvED SY- DA TE. flut; SELOw 70 et FILLeo OUT A7 wAAEMOUSE

  • A*

I AEQUEST REVIEWED SY: cAfg. fiug.

TEus 70 70 WE FURNISMED SY wapEMOUSE.

A .

ritus 70 at FA4dEO CN SITE. # . '

\ \! a '

ifEMS NOT AVAsLASLE ON JC8 Sitt - CaCEmED ON CPea.

TO FILLED OUT Af FAS SNCp FASSEDSY: DATE.

eff uS FA8eEO Mr.NOf$

mecisest mETusht0 70 F4LO CAft.

m

/

e wa _

see -

-