05000266/LER-1997-044, Forwards LER 97-044-00 Which Describes Discovery That Inservice Test Procedure Used Dedicated Operator to Provide Operabiliity of Containment Spray Additive Sys While Both Redundant Trains Were Isolated.No New Commitments Liste

From kanterella
(Redirected from ML20198Q662)
Jump to navigation Jump to search
Forwards LER 97-044-00 Which Describes Discovery That Inservice Test Procedure Used Dedicated Operator to Provide Operabiliity of Containment Spray Additive Sys While Both Redundant Trains Were Isolated.No New Commitments Listed
ML20198Q662
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/15/1998
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198Q669 List:
References
NPL-98-0034, NPL-98-34, NUDOCS 9801230110
Download: ML20198Q662 (1)


LER-2097-044, Forwards LER 97-044-00 Which Describes Discovery That Inservice Test Procedure Used Dedicated Operator to Provide Operabiliity of Containment Spray Additive Sys While Both Redundant Trains Were Isolated.No New Commitments Listed
Event date:
Report date:
2662097044R00 - NRC Website

text

. .

. t

$1SCOnSin Electnc POMR COMPANY Point Deoch Nuclecs Plant (920) 7!6 2321 6610 Nuclear Rd . Two R9 era, WI f,4241 NPL 98-0034 January 15,1998 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station Pl.137 Washington D. C. 20555 -

Ladies / Gentlemen:

DOCKETS 50-266 AND 50 301 LICENSEE IIVENT REPORT 97-044-00 USE OF DEDICATED OPERATORS DURING INSERVICE TIISTING OF CONTAINMIINT SPRAY SYSTEM CONSTITUTED AN OPERATION PRollilllTED llY TECllNICAL SPECIFICATIONS POINT IIEACll NUCl.l!AR PLANT. UNITS 1 AND 2 Enclosed is Licensee Event Repon 97 044 00 for Point lleach Nuclear Plant, Unit I and Unit 2. This report is provided in accordance with 10 CFR 50.73(a)(2)(1)(ll), an " operation prohibited by the plant's Technical Specifications." This report describes the discovery that an inservice test procedure used a dedicated operator to provide operability of the containment spray additive system while both redundant trains of the system were isolated during the test. Afler determining that the dedicated operator was an insullicient measure fbr operability, it was concluded that the plant had been operated in an operation prohibited by Technical Specifications during previous performances of the test.

No new commitments are established within this report.

Please contact us if you require additional information.

Sincerely,

%%M Douglas F. Johnson 4& -

ff Manager - Regulatory Services & Licensing l

Enclosure cc: NRC Resident inspector , l N (C Itegional Administrator