Insp Rept 50-423/88-16 on 880913-15.No Violations Noted. Major Areas Inspected:Evaluation of Content & Implementation of Licensed Operator Training Program
ML20155E808
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/04/1988
From: Briggs L, Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20155E806 List:
References
50-423-88-16, NUDOCS 8810130002
Download: ML20155E808 (5)


Text

-_

. .,

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report N /88-16 Docket N License No. NPF-49 Licensee: Northeast Nuclear Energy Company PO Box 270 Hartford, Connecticut 06141 Facility Name: Millstone Unit 3 Inspection At: Waterford, Connecticut Inspection Conducted: September 13-15, 1988 Inspectors: 4ty$kk&yv f/30/f)@)

1.arry&f iggs, Sen1Lf Operations Engineer date Operations Branch, PWR Section Approved by: Me f'[c/TT date

'PeTgf W. Eselgroth, Chiof g Pr Hsurized Water Reactor Section Operations Branch, DRS Inspection Sunnary: Inspection on September 13-15, (Inspection No. 50-423/88-16)

Inspection Sunnary: A routine announced inspection was .onducted at the Ilillstone Unit 3 Power Station to evaluate the content and implementation of the licensed operator training program. All program aspects reviewed were performed in accordance with program requirement Findings: No violations were identifie o ADOCK 05000423 PDC

r -

]

,

l

-

.

DETAILS 1.0 Persons Contacted M. Hall, Senior Operator Instructor T. Harvey, Senior Operator Instructor S. Jackson, Operator Instructor (Initial Training Coordinator)

P. Lang, Senior Reactor Operator

  • R. Martin, Assistant Operator Training Supervisor L. Miller, Reactor Operator J. Page, Reactor Operator B. Parrish, Operator Instructor (Upgrade Coordinator)
  • Potter, Operator Instructor (Requalification Coordinator)
  • B. Ruth, Operator Training Manager B. Small, Reactor Operator R. Smith, Reactor Operator
  • Stotts, Operator Training Supervisor

2.0 Licensed Operator Training The Licensed Operator Training (LOT) program at Millstone Unit 3 is addressed in the Millstone Unit 3 Appendix Manual, Appendix D, Nuclear Training Manual, and Appendix E. Training Progran Implementing Procedures. These documents and those listed in Attachment A were reviewed to verify that the provisions of 10 CFR Part 55 were being addressed. The following areas of the training program activities were reviewed on a sampling basis to determine acceptabilit .1 Program Review The inspector reviewed the documents listed in Attachment A, concerning the license's Initial (LOIT), Requalification (LORT) and Upgrade (LOUT) training programs to verify that: Recent operating events identified in Plant Incident Reports, Licensee Event Reports, Significant Operating Event Reports and Information Notices were incorporated into the training program, Records of lecture attendance were being maintained and that required / scheduled personnel were in attendanc A schedule for the current training cycle / program had been developed and was being adhered t Plant design changes and modifications were incorporated into the training program when neede __

.

3 Records of the most recent examination grades and the individuals responses were maintaine .2 Lecture Content and Written Exam Results The inspector attended three scheduled lectures to determine the content and scope of instruction. The lectures attended were:

Electrohydraulic Control System (requal training)

Emergency Diesel Generators (upgrade training)

Emergency Diesel Generator Load Sequencer (requal training)

All training lectures attended by the inspector were professionally presented and addressed the enabling objectives of the lesso The inspector also reviewed the last Requalification final exam of five operators. Two operators had failed a written, NRC administered, requal exam and were subsequently administered a licensee generated requal exam after a one week self-study program. Both operators passed the licensee administered written exam. A review of the two exams indicated that their level of difficulty was comparabl Overall results of licensee administered requal exams averaged about 90 percen .3 Operator Interviews The inspector interviewed five (5) licensed R0/SRO's to determine if they believed that training being administered was sufficient and in enough technical detail to allow them to safely and competently perform their duties as reactor operators. All those interviewed believed that training was adequate. The inspector also asked several questions concerning surveillance testing and training on plant modifications. Surveillance training is normally administered during simulator training. Training for modifications following the last outage was performed by giving each operator a book containing a description of each modification made to the plant followed by formal classroom instruction on those modification Several operators expressed a desire to have more simulator time and to have formalized training on station systems used for support, in particular the Auxiliary Boiler System was mentione .0 Findings _

. No violations, unresolved items or deviations were identified within the scope of this inspection. All areas reviewed appeared to have been performed in accordance with the licensee's program requirements.

,

i

,

1 4.0 Exit Meeting At the conclusion of the site inspection, on September 15, 1988, an exit meeting was held with the licensee's senior training representatives (denoted in Paragraph 1.0) to discuss the scope and findings as detailed in this repor At no time during this inspection was written material provided to the licensee by the inspector. Based on the NRC Region I review of this report and discussions held with licensee representatives during this inspection, it was determined that this report does not contain information subject to 10 CFR 2.790 restrictions.

d

)

.

!

.

!

I

. .

.

  • *

..

-

.

ATTACHMENT A DOCUMENTS REVIEWED Millstone Unit 3, Appendix Manual Appendix D, Nuclear Training Manual Appendix E Training Program Implementing Procedures Tab 1, HTM 3.078, Control Operator Program Tab 2. NTH 3.079, Upgrade Training Implementing Procedure Tab 3, NTH 3.080, Licensed Operator Requalification Training Implementing Procedure HTM 2.06. Training Program flodifications NTH 1.13, Student Evaluation