Physical Security Insp Repts 50-245/88-08,50-336/88-11 & 50-423/88-09 on 880502-03.No Violations Noted.Major Areas Inspected:Licensee Initial Implementation of Strike Plans & Compliance w/NRC-approved Security & Contingency Plans
ML20155D821
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/01/1988
From: Keimig R, Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20155D819 List:
References
50-245-88-08, 50-245-88-8, 50-336-88-11, 50-423-88-09, 50-423-88-9, NUDOCS 8806150423
Download: ML20155D821 (2)


Text

.

-

f,

'

l-q jy

'

L

y t

U.S. NUCLEAR REGULATORY COMMISSION

~

REGION I

,

Repor.t No.

50-245/88-08 50-336/88-11-50-423/88-09 Docket No.

S0-245 50-336

,

50-423

License No.

OPR-21

-

DPR-65 NPF-49

~

Licensee: Northeast Nuclear Power Station P. O. Box 270 Hartford, CT 06101 Facility.Name: Millstone Nuclear power Station Inspection'At: Waterford, Connecticut Inspection Conducted: May 2 - 3, 1988

-

Type of Inspection:

Special, Unannounced Physical Security I'

Inspector.:

/

Walter G. Martin, Physical Safeguards

' date Inspector

.

.,

-Approved by:

Wf (- / - se

.

[ Richard R. tatekn-Cgef, Safeguards date

,

Section, DRSS

t Inspection Summary:

Special unannounced, Physical Security Inspection

'

on May 2-3, 1988 (Combined Report Nos. 50-245/88-08, 50-336/88-11, and 50-423/88-09)

f -

Areas Inspected: The special inspection was conducted to review the licensee's initial implementation of strike plans and compliance with the

-

NRC-approved Security and Contingency plans.

I Results: The 1;-

ae was found to be in compliance with NRC requirements in the areas inspects i

,

8806150423 880607 PDR ADOCK 05000245 o

ncn

,.,

-, - -. _ -... -,. -

- - - -.. - -

. - - - - - - - - - - - -. - - - - - - - - - ~ -


.,

,

a

.

Details 1.

Key Persons Contacted P. Weekly, Security Supervisor P. Anhalt, Security Shif t Supervisor USNRC P. Habighorst, Resident Inspector L. Kolanauski, Resident Inspector The inspector also interviewed other licensee personnel and members of the contingency guard force.

2.

Strike Contingency Plan Implementation Review At 12:05 a.m. on May 2,1988, the union members of the contract security force walked off site after being properly relieved by a strike contingency security force.

Facility security was maintained using the licensee's conti--ancy measures as committed to in the NRC-approved Safeguard Continso, icy Plan.

The licensee implemented the contingency measures at 11:00 p.m. on May 1, 1988, in anticipation of the walkout.

The inspector observed on the evening of May 2,1988 that the striking guards were picketing at the entrance to the facility's access road and along State Route 156.

The picketing was orderly and peaceful.

During inspection on May 3, 1988, which included both day and night shifts, the inspector observed that all required security posts were manned, the required response force was available, and all necessary compensatory measures were in place.

The inspector reviewed the results of a contingency event drill that was conducted using the contingency guard force and ascertained that the response was adequate.

The inspector also reviewed the contingency force training records and found them to be in accordance with the licensee's NRC-approved security plan.

3.

Exit Interview The inspector reviewed the inspection findings with Ms. P. Weekly on May 3, 1988.

At no time during this inspection was written material provided to the licensee by the inspector.