ML20148G927

From kanterella
Jump to navigation Jump to search
Responds to ,Expressing Interest in Meeting W/Nrc Staff.Insp Has Indefinitely Been Postponed
ML20148G927
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 06/02/1997
From: Pieson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Haberthy J
AFFILIATION NOT ASSIGNED
References
NUDOCS 9706060303
Download: ML20148G927 (3)


Text

i

. 1 June 2, 1997 Mr. John K. Haberthy international Representative United Plant Guard Workers of America 385 Adkins Hoffer Hill Road j Otway, OH 45657

Dear Mr. Haberthy:

1 I am responding to your May 8,1997, letter expressing an interest in meeting with NRC l ctaff. You requested a meeting with the NRC physical security inspection team leader and, if possible, with me at the Portsmouth Gaseous Diffusion Plant (PORTS) site during the l physical security inspection planned for the week of May 19-23, 1997, to discuss NRC and l PORTS physical security issues, and to become familiar with the NRC's applicable regulatory requirements. Please note that this inspection has indefinitely been postponed. You also I requested a meeting with Ms. Elizabeth O. Ten Eyck and me in Washington, D.C.

1 Unfortunately, NRC's inspections of the gaseous diffusion plants are performed on a very tight schedule. Therefore, it may not be possible for the NRC inspection team leader to set aside time to meet with you while the inspection is being conducted at the PORTS site. l However, I will be at the PORTS site on June 11,1997, to attend a meeting scheduled to j last from 12:00 noon to about 5:00 pm. I will be happy to meet with you either before or l after the meeting. Also, at a mutually acceptable date and time, members of the NRC I Division of Security staff, including the NRC physical security inspection team leader for l PORTS, Ms. Ten Eyck and I would be available to meet with you at NRC Headquarters in l Washington, D.C.

l Please contact the NRC's Project Manager for PORTS, Mr. Yawar Faraz, at (301) 415-8113, preferably before June 3,1997, and provide him with your phone number, point of contact i and availability to meet with me at PORTS on June 11,1997. l S.mcerely, / \

ORIGINAL SIGNED BY: I Robert C. Pierson, Chief Special Projects Branch [g Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-7002 _.

Certificate GDP-2 {((((.dtjgd cc: Mr. Randall DeVault, DOE-OR Mr. Dale Allen, PORTS l DISTRIBUTION Docket 70-7002 NRC F5e Cassa Putsc FSPB r/f FCS$ r/f CCom.RW NMSS r/f GShem,.RW KO'Bnen. RIH MHam, SPB KWsuberg. OGC ETanEyck WB,d REverly G40RDUNION YHF a OFC /SFS # SPB ASPB h NAME YFarar4 DAHowltoy DMartin eison DATE 5iMis? Aistes7 si 3cie7 s i is7 e i i i i C = COVER E = COVER ar ENCLOSURE N = NO COPY OFFICIAL RECORD COPY i 9'/06060303 970602 l

' >DR ADOCK 07007002 C PDR

e l

l l ,

1 .

i gr. John K. Haberthy Int rnational Representative '

Unit Plant Guard Workers of America 385 A ins Hoffer Hill Road Otway, 45657

Dear Mr. Habe hy:

I am responding to ur May 8,1997, letter expressing an ' erest in meeting with NRC staff. You requested meeting with the NRC physical s urity inspection team leader and, if possible, with me at t Portsmouth Gaseous Diffu n Plant (PORTS) site during the physical security inspectio lanned for the week May 19-23,1997, to discuss NRC and 1 PORTS physical security issu , and to become miliar with the NRC's applicable regulatory l requirements. Please note that is inspecti has indefinitely been postponed. You also requested a meeting with Ms. Eliz eth O en Eyck and me in Washington, D.C.

Unfortunately, NRC's inspections of gaseous diffusion plants are performed on a ver) tight schedule. Therefore, it wo be v y difficult for the NRC inspection team leader to set aside time to meet with y while the i spection is being conducted at the PORTS site.

However, I will be at the P TS site on Jun 11,1997, to attend a meeting scheduled to last from 12:00 ricon to out 5:00 pm. I will e happy to meet with you either before or after the meeting. A , at a mutually acceptab date and time, members of the NRC Division of Securit staff, including the NRC physic security inspection team leader for PORTS, Ms. Te yck and I would be available to me with you at NRC Headquarters in Washington .C.

Pleasejontact the NRC's Project Manager for PORTS, Mr. war Faraz, at (301) 415-8113, f

preffably before June 3,1997, and provide him with your ph ne number, point of contact and availability to meet with me at PORTS on June 11,1997.

Sincerely, Robert C. Pierson, Chief Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-7002 Certificate GDP-2 cc: Mr. Randall DeVault, DOE-OR Mr. Dale Allen, PORTS munnunam  ;

Doast 70-7002 NRC File Canter Pueda FSPS r/f FCSS r/f 4 CCan. RIN NMS$ r/f GShear, Rm KO'B,ian, Rm MHarri, SPS l KWmsberg, OGC ETanEye WB,a4 K Fverty 040RDUNION YHF l i

OFC SPB b l5PB. h $PS , SPB NAME YF ar ar-il Hoodley / arten FIPierson DATE b 12[/97 / 19 7 / 19 7 / 19 7 I / / /

C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY

- *Wu l g & UNITED STATES 2 E NUCLEAR REGULATORY COMMISSION

'f WASHINGTON, D.C. 20555 4001 g * * * * * ,o June 2, 1997 Mr. John K. Haberthy International Representative i United Plant Guard Workers of America 385 Adkins Hoffer Hill Road Otway, OH 45657

Dear Mr. Haberthy:

I am responding to your May 8,1997, letter expressing an interest in meeting with NRC staff. You requested a meeting with the NRC physical security inspection team leader and, 1 if possible, with me at the Portsmouth Gaseous Diffusion Plant (PORTS) site during the physical security inspection planned for the week of May 19-23,1997, to discuss NRC and PORTS physical security issues, and to become familiar with the NRC's applicable regulatory requirements. Please note that this inspection has indefinitely been postponed. You also requested a meeting with Ms. Elizabeth O. Ten Eyck and me in Washington, D.C. l Unfortunately, NRC's inspections of the gaseous diffusion plants are performed on a very tight schedule. Therefore, it may not be possible for the NRC inspection team leader to set aside i;me to meet with you while the inspection is being conducted at the PORTS site.

However, I will be at the PORTS site on June 11,1997, to attend a meeting scheduled to last from 12:00 noon to about 5:00 pm. I will be happy to meet with you either before or after the meeting. Also, at a mutually acceptable date and time, members of the NRC Division of Security staff, including the NRC physical security inspection team leader for PORTS, Ms. Ten Eyck and I would be available to meet with you at NRC Headquarters in Washington, D.C.

Please contact the NRC's Project Manager for PORTS, Mr. Yawar Faraz, at (301) 415-8113, preferably before June 3,1997, and provide him with your phone number, point of contact and availability to meet with me at PORTS on June 11,1997.

1 I

Sincerely, f( ~ ~

Robert C. Pierson, Chief Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-7002 Certificate GDP-2 cc: Mr. Randall DeVault, DOE-OR Mr. Dale Allen, PORTS