MONTHYEARA99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 A97036, Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2 ML20217M4151997-07-31031 July 1997 Corrected Page to Monthly Operating Rept for Jul 1997 for Zion Generating Station,Unit 1 A97027, Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 2 ML20148L5771997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Zion Generating Station,Units 1 & 2 ML20141D8601997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Zion Station Units 1 & 2 ML20217M4011997-03-31031 March 1997 Corrected Page to Monthly Operating Rept for March 1996 for Zion Generating Station,Unit 1 ML20137Y1491997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Zion Unit 1 ML20136J5091997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Zion,Units 1 & 2 ML20135A5311997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Zion Station Units 1 & 2 ML20133M1891996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Zion Generating Station Units 1 & 2 ML20132D7401996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Zion Generating Station Units 1 & 2 ML20134K7121996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Zion Generating Station Units 1 & 2 ML20134K7531996-09-30030 September 1996 Corrected Monthly Operating Repts for Sept 1996 for Zion,Units 1 & 2 ML20129B3711996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Zion Generating Station ML20134K7491996-08-31031 August 1996 Corrected Monthly Operating Repts for Aug 1996 for Zion,Units 1 & 2 ML20217M4071996-04-30030 April 1996 Corrected Page to Monthly Operating Rept for Apr 1996 for Zion Generating Station,Unit 1 ML20149K2411996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Zion Unit 1 ML20149G2851994-09-30030 September 1994 Monthly Operating Repts for Sept 1994 for Zion Generating Station ML20058K2281993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Zion Generating Station ML20058K2341993-10-31031 October 1993 Corrected Monthly Operating Rept for Oct 1993 for Zion Unit 2 ML20059K0731993-10-31031 October 1993 Monthly Operating Repts for Oct 1993 for Zion Generating Station Units 1 & 2 ML20058P1631993-09-30030 September 1993 Monthly Operating Repts for Sept 1993 for Zion,Units 1 & 2 ML20057B6921993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for Zion,Unit 1 ML20056D6881993-07-31031 July 1993 Monthly Operating Repts for Jul 1993 for Zion Generating Station,Units 1 & 2 ML20128K6951993-01-31031 January 1993 Monthly Operating Repts for Jan 1993 for Zion,Units 1 & 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98049, Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 21998-09-25025 September 1998 Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 2 ML20195D1221998-08-31031 August 1998 DSAR, for Zion Station A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 ML20236J7911998-06-12012 June 1998 LER 98-S02-00:on 980517,first Shift Security Officer Reported Being Wounded by Unknown Subject Who Fled Area. Caused by accidental,self-inflicted Gunshot Wound.Removed Officer from Duty & Charged Officer W/Filing False Rept A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 A98034, 1997 Annual 10CFR50.59 Summary Rept1997-12-31031 December 1997 1997 Annual 10CFR50.59 Summary Rept ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 ML20202F1451997-12-0303 December 1997 Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 ML20199J5931997-11-26026 November 1997 SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14) A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event1997-11-13013 November 1997 Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 ML20211M0181997-10-0707 October 1997 Special Rept 295-123-97-001SR:on 970904,OA Motor Declared Inoperable Due to Pin Hole Leaks Identified on Pressure Regulating Relief valve,0FP0052.Procedure Was Rewritten to Ensure 0FP0052 Would Maintain Same Pressure When Fully Open A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual 1999-09-30
[Table view] |
Text
. . - .
OPERATING DATA REPORT DOCKir.T NO.
DATE COMPLETED BY O A/Sh^>
TELEPHONE /6 ' M V OPERATING STATUS
- 1. Unit Nasse:
u M %88s 1, w p ,g,4 tr/]2oftw>o w W/QR9 M M
- 3. Licensed Thennal Power (MWt): M5d
- 4. Nasseplate Rating (Gross MWe): WW6
- 5. Design Doctrical Rating (Net MWe): #Vo
- 6. Maxhaum Dependable Capadty (Gross MWe): /N6
- 7. Mazhoum Dependabne Capedfy (Net WWe): N#O
- 8. If Cheeses Occur in Capedty Ratings (iteens Number 3 Through 7) Staor Last Report. Give Reasoas:
l
\ A /P if. Poww Level To Which Restricted. lf Any (ppe):
- 10. Reasons For Restrictions.lf Amy:
This Meath Yr es>.Dete Cumulative
!!. Hours la Reporting Ported $95 O N YO O /N4/ /75, b
- 12. Nussber of Hour, Reactor Was CIttkal 56 d. A / 30 to . J 87 39/.9' O. O O. O ? 6, ? /. 8
- 13. Reactor Reserve skuedown Houri
- 14. Hours Generster On Line %R ? /366,2 A VY'/. 8 II. Unit Reserve Shuedews Hours n./) O. D 6. O
- 16. Groes Thannal Emergy Generated (MWH) /. 6 N '/5 A/ 3'rP/ 3/O ,N2, /A </ SP7
- 17. Gross Enocerlan! Energy Generstad (WWH) 67'7/6 3 / 3/ 2 vei 7 ff 577 O//f 6S/ 790 / R o i 3 4 '/ 7 7, (> % / 2 (/
- 18. Net Einstr6en! Energy Genesoned (MWH)
- 70. 9 90.7 /e y, 3
- 19. Valt Serv 6ee Facter
- 20. Unit Aveinsbility Facter fo . f 90,7 6f. 3
- 21. Unit Capacky Factor (Uelas MDC Net) 76' 2. P 7, 2 /#). 6
- 22. Unit Capadty Facter (Ushag DER Net) 7/v 2 VZ '/ ,
/A, 6'
- 23. Unit Forced Outage Rate 4/ /,O /R 5
- 34. Sheldowns NM Over Next 6 Months (Type. Dete and Duration of Eark):
- 25. If Shot Dews At End Of Report Per6ed.Estianated Date of Saartup:
- 34. Unks is Test Seetes (Prior io Commercial Operetnoe): Ferocaat Achieved INITIAL CRITICALITY INITIAL ELECTRICITY A/ A-COMMERCIAL OPERAT10N _
(9/77) dh295 ncn - /
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
b un,r Xint U-Z DATE COMPLETED BY TELEPHONE Nd'2d W MOtml DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWeNet) g /050 g, 9Y7 2 /d6O 13 kk[
3 /M?/ 19 k[O 4 lY 20 Y s
W5 21 h9d
. 995 u 96/
, 99V u 5732 3 N 24 ONb
, 9% 2s - /7 10 b % ^lb
- a, 99V 2, -9
! i2 9% a -9
~
13 29 14 30 15 31 i.
999' l
l INSTRUCDONS On this format, list the average daily unit power level in NW,. Net for each day in tb reporting month. Compute to r the rwarest whole megawatt.
(9/77) 4
i
~56-295 - -
UNIT SHUTDOWNS AND POWER REDUCDONS g gf y DATE co. n u== => **n"'
REPORTMONTH%Livire TE1.EPHONE 3/2" 7W'- JYl8Y
~
1
} ~~
i -
.$E ig Lkensee Eg Cause & Corrective S. Date { 7; *
} .s g ocf Ewns s3 EU Action to H
$$ sE jdi g d
Report
- fu p,,,,,,g,,,,,,,c,
/ 12 og N/ F /2. 0 /} 3 Q f,y 1,yglfac/cr Q gQ
$b /]/fl?- b/fl} fCUCf kl i{
.$/ win Gencmfor due &
4edadcx extro/mo/
fuf?Ct ON ~
Skecd&e/e to-//
som s
- i' iai.g c y # # febe/cg&h1 9 t 2 3 4 F: Forced Reason: M*
- Md Exhibit G-Inurucilons 5: Scheduled A-Equipenset Faliers(Emplain) s.n. eg for Preparation of Data 5-Maintenance of Test 2-Manual scram Entry $heets for Licensee C Refueling 3-Auto Scram Event Report (LER) File (NUREG-D =S*..trR.si+ *n E4peraser Traiahs & IJcense Emasninselon
- a'agt...
2 oi m 9-other F-Adeninisesselve 5 G4perational Error (Emplain) Exhibis I-Samw Source 19/77) H4ther(Emplain)
f.. .
OPERATING DATA REPORT DOCKETNO. NW DATE COMPLETED SY 4 /4/5 *V TELEPHONE 9VG ' ' %"V' i
OPERATING STATV3
- 1. Udt Name:
- d d 2, y p,g,4, rr 02 O/ 00D0 7a Kr 62 29 2W/)
- 3. Liesseed Thenna! Poww (Wwt):
325o
- 4. Neenspiste Rating (Geons MWe): /0 #6
- 5. Design Electrien! Rating (Net WWe): 'O Vo
- 6. Mashnum Dependable Capedty (Groes MWe): /NC
- 7. Maahuum Dependable Capedty (Net MWe): No
- 8. If Changes Ocew in Capedty Rathnes (lteses Number 3 Timough 7) Eines Last Report.GM Renames:
A/G
- 9. Power Level To k'bich Restricted. If Any (Net MWe):
- 10. Renaces For Restrictions,If Any: 4//>
I .
This Weath Yr. 4e Dete Cummistiw
- 11. Hours la Reporting Peded 5 95.25 NVOd .// 7 ##9' o
- 12. Nuenber Of Hours Ramseer Was Ch &WM / y yo. O x /- a / / . </
- 13. Reactor Reserve sheedown Hows /1/ ) O. O WJ6, /
I4. Hours Generater Oo4Jee /"/m O / </uo, o fd, go.3 . 2
!$. Unit Resern Shusdown Neurs C. O C. O O.D
- 16. Gross Thermal Energy Geesseted (WWH) 2 /Y Z V O'/ v 5/// 962 .2 W ad7 V/9 l 17. Gree Electrical Emmsy GemmeW (WWH) 732 Wo /,52/ #73 '/5 612, OW
- 18. Net Elseerbal Energy Geessened (MWH) '7M /V6 / VSR507 7V 57v 36 y i
- 19. Valt 5srv6es Facter /^0 0 WLO '7/ /
) 20. Valt Avainnbety Faseer /M 6 me. O '7/. /
i 21. Unit Capodry Feet.ar (Uning MDC Net) O'/ O G 7. V 4% V
- 22. Unit Capsety Factor (Using DER Net) O'/ O @ ?. V /A. E'
- 23. Unit Fersed Ouence Rate oO o. O / V. /
- 24. Sheadowns Scheduled Our Next 6 Meaths (Type. Dete. sad Duretion of Eacht:
i.
- 28. If Shut Den At End Of herort Period.Estiunated Deee of Saartup:
)
- 34. Unks la Tsa testes (Pder to Coenauerdel Operaties): Fornost Achieved INITIAL CRITICAUTY
! inmAt EuCniCfTv ,
COMutRCIAL OPERATION _
4 7I J
l u __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ . - _ _ _ __ _ . _ . _ _ -
~
AVERAGE DAILY UNIT POWER LEVEL Docusrno. 30-30/
Unir 2'01 U2.
DATE COMPLETED BY Idiv TEtEPuont 7&pory uonns YIAuaAL(
. J DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) g /MO gy /0 W 2 /6V5 ss /o V3 3 /0UV ,, /0 V3 a /C4'7 n /cVV
, /aV& n /o V3 s /OV4 22 /6 VV 1 l0 U l$ '
, /?Vf 1s /o38
, ./oY2 1, /o35 le !b 2s SY n, /6V3 n 557 s2 /OV6 u RYS
,, /oV3 2, /o/5 u /dV2 3, 15
! 31
,, /dY2 INSTRUCDONS On (Ms format. list the awrage daily unit power lewt in MWe. Net for each day in the reporting month. Compute to the nearset whole trepwatt.
(9/77) i __ --_
UNIT SMUMOWNS AND FOWER REDUCDONE DOCKETNO.50-30V UNITMAbdE 2/dN u- Z -
DATE
/ W '#'
REPORT 900 NTH IO/#/Y TELSENONE 3fR'?Y& ~DOEV s .3_ 'uc, S,. o 1, it i_g
~
!:: s33 Ewns e g g3 g g c_ , c ,,,,,
4,,w ,,
p 33 s 5 ac Report #
y,,,,,,g,,,,,,,c, O- ac g gg vi u g
d is 62 % W9 5~ $educedpoex ro 57"4 c6x 2 & 2n Fedunks pi'"P Yao 6rwro/ va/ve di&c/ opn.
I 2 3 4 F: Forced M" Resean: -
Emhibit C-lastructions 5: Scheduled A Equipaiset Failure (Earlain) s.pg.nv.1 for PP8'ation ed Data B.mwa===e* of Tant 2-Har.ual Scram Entry Sh+cts for Ikensee c.ng(gellng 3-Aute Scr= Event Repurn (LER) FBe(NUREG-o= dat-v R-uiaw E4perator Training & Wessee Esassinesion
- aia
- te.,
2 mm
,-other F.Adaministresive 5 Geyerstional Error (Empisia) Exhibis 1-Saene Somew (9/71) Hether(Emplain)
+
FEBRUARY MAJOR SAFETY RELATED MAINTENANCE Eauipment Name Work Performed Unit 1 Diesel Generator 0 Replaced turbo charger.
2A Service Water Pump Replaced internal pump components including impellers and bearings.
l o
1293t 0845A
. t
+
l FEBRUARY
SUMMARY
OF OPERATING EXPERIENCE i
I UNIT 1 i The unit entered the reporting period at 1087 MWe (99% reactor power). On February -24th at 1012 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.85066e-4 months <br /> Turbine Trip / reactor trip due to high-high level in 1C steam generator due to feedwater control malfunction. At ;
approximately 2212 hours0.0256 days <br />0.614 hours <br />0.00366 weeks <br />8.41666e-4 months <br />, the scheduled refueling outage began. The unit remained off line the remainder of the month ending with an availability factor of 80.9%.
UNIT 2
- The unit entered the reporting period at 1090 MWe (99% reactor power).
The unit remained on line the entire reporting period, ending at a power .
level of 1094 MWe (98% reactor power) and having an availability factor of !
100%. l P
t L
i c
4 i
I L
?
I l
i i
, i I
l ?
i 1293t [
( 0845A :
l l
REFUELING INFORMATION REQUEST Questions:
- 1. Name of facility.
2.- Scheduled date for next refueling shutdown.
- 3. Scheduled date for restart following refueling.
- 4. Will refueling or resumption of operation +.hereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuratior.
been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If no such review has taken place, when is it scheduled?
- 5. Scheduled date (s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations associated with refueling, e.g.,
new or dif ferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new -
operating procedures.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
Page 1 of 3 1293t 0845A
I O
Unit 1 - Answers
- l. Zion Unit 1
'2. Current refueling outage began February 24, 1988. Next refueling outage is currently scheduled to begin on August 31, 1999,
- 3. The initial criticality following refueling is scheduled for April 30, 1988.
- 4. A Technical Specification change has been subinitted to approve the Westinghouse method of sleeving. Approval is pending. The reload safety review was held in October, 1987 and no unreviewed safety questions were fdentified for the proposed reload. The On-Site Review will be held before start-up.
- 5. None
- 6. None
- 7. The number of fuel assemblies a) in the core is 193, and 4
b) in the spent fuel storage pool from Zion Unit 1 is 556.
c) An additional 80 new fuel assemblies are in the pool in preparation for refueling, i
1
- 8. The present licensed spent fuel pool storage capacity (shared with Zion i Unit 2) is 2112 fuel assemblies. The installation of the new storage racks has been comtleted.
, 9. In 1995, Zion Station will lose full core discharge capability. This date is based on a December,1987 study.
l i
i
- l i
Page 2 of 3 l
l 1293t 0845A t
d O
Unit 2 - Answers
- 1. Zion Unit 2
- 2. The next refueling outage scheduled to begin in late-October, 1988.
- 3. Restart after the next refueling outage is currently scheduled for January, 1989.
- 4. No Technical Specification changes have been identified for the next cycle. The reload safety review is planned for July 1988. The On-site Review will be held after that review.
- 5. None
- 6. None.
- 7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool f rom Zion Unit 2 is 592
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies. The installation of the new storage racks has been completed.
- 9. In 1995, Zion Station will lose full core discharge capability. This date is based on a December,1987 study.
Page 3 of 3
- 12931 0845A
Commonw:alth Edisin Zion G:niriting Station 101 Shiloh 5fvd.
Zion, Illinois C0099 Telephone 3121746 2084 s
March 3, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i a
Dear Sir,
Enclosed please find the Cperating Status Report for the month of February, 1988 for Zion Generating Station.
Sincere ,
I
- G.,J. Pliml l Station Manager Zion Station GJP/jlc Enclosure cc
- D. P. Galle A. B. Davis (NRC)
L. D. Butterfield H. E. Bliss A. Gianopoulos L. J. Anastasia INPO Division of Eng. Health State of Illinois Tech Staff File Director, Office of Inspection and Enforcement Master 'ile 1
h t s A
_ _ _ _ _ _ _ _ _ _ _ _ _ - a