ML20133M189

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1996 for Zion Generating Station Units 1 & 2
ML20133M189
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/31/1996
From: Cygan J, Schwartz G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9701220296
Download: ML20133M189 (13)


Text

.*

Onnmonwralth bbon Company Zion Generating Mation 101.shiloh Doulevard zion n.aunr97 rei a17 742081 January 14, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

1 Attached is the December Operating Status Report.

G.~K. Sch'artz w

Station Manager Zion Station GKS/jlc Enclosure cc:

Regulatory Assurance USNRC Document Control H. Keiser W. Beach (NRC)

D. Farrar D. R. Eggett INPD Div. of Enforcement Health State of Illinois /IDNS i

F. Yost NRC Inspector. Zion IDNS Inspector. Zion Operating Engrs.

C. Y. Shiraki Master File 1

T fc

/

9701220296 961231

~

PDR ADOCK 05000295 1

i R

PDR G Al)(I] l

\\

ZCLERK-1 A tinicom Company v

OPERATING DATA REPORT DOCKET NO._

50-295 DATE 1/14/97 COMPLETEDEY J. CYGAN TELEPHONE (847)746-2084 X3169 OPERATING STATUS 1.

Unit Name:

Zion Unit..

2.

Reporting Period: 0000 L20196 to 2400 123196 Notes 3.

Licensed Thermal Power (MWt):

3250 4

Nameplate Rating (Gross MWe):-

1085 5.

Design Electrical Rating (Net MWe):

2040 MS 6.

Maximum Dependable Capacity (Gross MWe):_L040 7.

Maximum Dependable Capacity (Net MWe):

'8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A i

10.

Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 744.0 8.784.0 201.648.0 12.

Number Of Hours Reactor Was Critical 744.0 7.464.1 137.503.0 13.

Reactor Reserve Shutdown Hours 0.0, 0.0 2.612.8 14.

Hours Generator On-Line 744.0 7.168.7 133.665.9 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 2.403.092.0 22.866.344.0 394.561.941 17.

Gross Electrical Energy Generated (MWH) 802.910.0 7.630.074.0 128.536.147 18.

Net Electrical Energy Generated (MWH) 769.355.0 7.328.770.0 122.491.722 19.

Unit Service Factor 100.0 81.6 66.2 20.

Unit Availability Factor 100.0 81.6 66.2 21.

Unit Capacity Factor (Using MDC Net) 99.4 80.2 58.4 22.

Unit Capacity Factor (Using DER Net) 99.4 80.2 58.4 23.

Unit Forced Outage Rate 00.0 11.9 15.9 24.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

j Refuelina Outaae startina 4/5/97 and endino 5/25/97 25.

If Shut Down At End Of Report Period. Estimated Date of Startup.

i 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1

ZCLERK-2

l l

l OPERATING DATA REPORT l

f DOCKET NO.

50-304 i

DATE 1/14/97 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 F

OPERATING STATUS 1.

Unit Name:

Zion Unit 2 i

2.

Reporting Period: 0000 120196 to 2400 123196 Notes 3.

Licensed Thermal Power (MWt):

3250 4.

Nameplate Rating'(Gross MWe):

1085 5.

Design Electrical Rating (Net MWe):

1040 6.

Maximum Dependable Capacity (Gross MWe): 1085 7.

Maximum Dependable Capacity (Net MWe):

1040 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A i

10.

Reasons For Restrictions. If Any:

N/A This Month Yr-to-Date Cumulative 11.

Hours In Reporting Period 744.0 d.784.0 195.361.0 12.

Number Of Hours Reactor Was Critical 00.0 5.846.4 L38.378.7 13.

Reactor Reserve Shutdown Hours 00.0 0.0 226.1 14.

Hours Generator On Line 00.0 5.688.6 135.098.8 15.

Unit Reserve Shutdown Hours 00.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 00.0 17.631.458.0 402.647.369 17.

Gross Electrical Energy Generated (MWH) 00.0 5.846.647.0 130.102.951 18.

Net Electrical Energy Generated (MWH) 00.0 5.618.358.0 124.095.088

'19.

Unit Service Factor 00.0 64.8 69.2 20.

Unit Availability Factor 00.0 64.8 69 2 21.

Unit Capacity Factor (Using MDC Net) 00,0 61.5 61.1 22.

Unit Capacity Factor (Using DER Net) 00.0 61.5 61.1_

23.

Unit Forced Outage Rate 00.0 1.3 13.3 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

,25.

If Shut Down At End Of Report Period. Estimated Date of Startup: 1/25/97 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION h

ZCLERK-3

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET.N0. 50-295 UNIT NAME Zion Unit 1 DATE 1/14/97 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH December 1996 1

Duration 2

Method of Licensee System Component Cause & Corrective No.

Date Type (Hours)

Reason Shutting Event Code 4 Code 5 Action to Down 3 Report #

Prevent Recurrence Reactor Unit 1 Remained On Line For The Entire Month Of December.

1 2

3 4

F: Forced Reason:

Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5

G-Operational Error (Explain)

Exhibit 1 - Same Source H-Other (Explain)

ZCLERK-4

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-304 UNIT NAME Zion Unit 2 DATE 1/14/97 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH December 1996 1

Duration 2

Method of Licensee System Component Cause & Corrective No.

Date Type

_ Hours)

Reason Shutting Event Code 4 Code 5 Action to

(

Down 3 Report #

Prevent Recurrence Reactor 7

12/01/96 S

744.0 C

1 Unit 2 Remained Off-Line For The Entire Month Of December For Refueling Outage Z2R14.

1 2

3 4

F: Forced Reason:

Method Exhibit G - Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5

G-Operational Error (Explain)

Exhibit 1 - Same Source H-Other (Explain)

ZCLERK-5

-.=

t

~

f AVERAGE DAILY UNIT POWER LEVEL r

DOCKET NO. 50-295 UNIT Zion Unit 1 DATE 1/14/97 l

l COMPLETED BY J. CYGAN L

TELEPHONE (847) 746-2084 x3169 MONTH December 1996 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 1

1040 17 1027 2

1038 18 1025 i

3 1043

'19 1024 i

4 1044 20 1024 r

5 1046 21 1028 6

1045 22 1028 l

{

7 1045 23 1027 8

1045 24 1029 9

1045 25 1028

)

10 1046 26 1025 j

i 11 1047 27 1027 12 1042 28 1030 13 1036 29 1030 14 1030 30 1027 j

15 1030 31 1029 16 1028 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I

'ZCLERK-6

e

'g AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-304 UNIT 21on Unit 2 DATE 1/14/97 i

COMPLETED BY J. CYGAN I

TELEPHONE (847) 746-2084 x3169 j

December 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-12 17

-13 2

-12 18

-13 3

-12 19

-13

-12 20

-13 4

5

-12 21

-13 6

-12 22

-13 7

-12 23

-13 8

-12 24

-13 9

-12 25

-13 10

-12 26

-13 11

-12 27

-13 12

-12 28

-13 l

13

-12 29

-13 14

-13 30

-13 15

-13 31

-13 16

-13

[

INSTRUCTIONS On.this format, list the average daily unit power level in MWe-Net for each day in the i

reporting month. Compute to the nearest whole megawatt.

i f

.ZCLERK-7 3

+

i December 1996 h

SUMMARY

OF OPERATING EXPERIENCE 4

UNIT 1 Unit 1 began December on-line at 1081 MWe power level (99.6% reactor power). Unit I remained on line for the entire reporting period.

Unit 1 concluded the reporting period at 1080 MWe power level (100% reactor power) and with an availability factor of 100.0% for the month of December.

i

[

UNIT 2 Unit 2 began December off-line for a continuation of refueling outage (Z2R14).

Unit 2 is scheduled to be back on-line on January 25, 1997.

. ZCLERK-8

December-1996 I

MAJOR MAINTENANCE ~

EQUIPMENT NAME WORK PERFORMED (UNIT 1) 1A CW PP Pump Breaker Work Completed.

005: 12/03/96 - 12/04/96 1A SA COMP Miscellaneous Leaks Completed 005: 12/12/96 - 12/27/96 OD CC PP Repair Oiler Oil Leaks Completed 005: 12/12/96 - 12/12/96 IA SI PP IM's Surveillance Completed 005: 12/26/96 - 12/26/96 1A SW PP Motor Heater Repair

-l Completed OOS: 12/27/96 - 12/28/96 IB CHARGING PP Repair Shaft Driven Oil Pump Completed 005: 12/27/96 - 12/28/96 1A HD PP Changeout Contaminated Oil 005:.12/27/96 IB C/CB PP Cleaning / Inspection of Motor / Pump 005: 12/30/96 1

COMMENT:

  • No return to service date.

i ZCLERK-9

l December 1996 MAJOR MAINTENANCE i

l l

l EQUIPMENT NAME WORK PERFORMED (UNIT 2)-

r L

(

2A lA Comp Compressor Replacement 1

-005: 07/14/96

'I i

1 l

i i

l

'l l

l COMMENT:

  • No return to service date.

'ZCLERK-10

d.-

REFUELING INFORMATION REQUEST t

4 00ESTIONS:

1.

Name of facility.

2.

Scheduled date for next refueling' shutdown.

3.

Scheduled date for restart following refueling.

'4.

Will refueling or resumption of operation thereafter require a technical

. specification change or other lice'ise amendment?

-If answer is yes, what. in geraral, will these be?

-If answer is no; has the reload fuel design and core configuration 'been 4

reviewed by your Plant. Safety Review Committee to determine whether any i

unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

5.

Scheduled date(s) for submitting proposed licensing action and supporting

)

information.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

7.

The number of fuel assemblies: (a) in the core and (b) in the spent fuel I

storage pool.

i 8.

The present licensed spent fuel pool storage capacity and the size of any 1

increase in licensed storage capacity that has been requested or is planned, in the number of fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

1 I

Page 1 of 3

)

. ZCLERK 11..

REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS:

1.

Zion Unit 1.

2.

Cycle 15 is scheduled to shutdown April 5, 1997 for refueling.

3.

Cycle 16 is scheduled to start up May 25, 1997.

4.

The following License Amendments are required to allow resumption of operation after Refueling Outage Z1R15.

e Increase Steam Generator plugging limit.

Required to ensure Unit derating will not be required based on Steam Generator plugging.

Authorize Steam Generator tube sleeving per new Topical Report.

Required to allow additional sleeving options to minimize plugging.

e Authorize new F* limit on tube re-roll and new EF* re-roll limit.

Required to support increased plugging limit.

Required to allow additional re-roll options to minimize plugging.

The Reload Safety Analysis for cycle 16 will be completed during Z1R15.

5.

Projected submittal of License Amendments: January-February, 1997.

6.

Not applicable.

7.

The number of fuel assemblies (a) in the core is 193, and (b) in the spent fuel storage pool from Zion Unit 1 is 932.

8.

The present licensed spent fuel pool storage capacity (shared with Zion Unit

2) is 3012 fuel assemblies.

Of these 3012 storage locations,11 are 4

unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90 0-008A. C).

1 9.

The projected date of the last refueling than can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out i

of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule.

This assumes the Offset Tool Modification (M22-90-0-008A, C) will be installed prior to June 2003. This projected date is subject to change based on outage durations or Overhaul Schedule changes.

2 of 3 ZCLERK-:12

+

REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:

1.

Zion Unit 2.

2.

Cycle 14 is scheduled to shutdown September 19, 1996 for refueling.

3.

Cycle 15 1s scheduled to start up January 25, 1996.

4.

There are no outstanding License Amendments required for startup of Unit 2 following Refueling Outage Z2R14.

5.

There are no outstanding proposed License Amendments required for startup of Unit 2 following Refueling Outage Z2R14.

6.

New fuel reloaded into Unit 2 Cycle 15 core will incorporate the following design changes:

Selected standard Integral Fuel Burnable Absorber (IFBA) patterns have been updated following a Westinghouse Core Engineering investigation of peripheral IFBA rod loading within the fuel assembly.

The net effect of this change is to achieve the most efficient absorber orientation at Beginning of Life (BOL) and for burnups through 5000 MWD /MTU. These patterns provide self-limiting features that mitigate the extent of DNB propagation.

In addition. these IFBA patterns provide significant peaking factor and reactivity holddown benefits.

IFBA rods will have a nominal B-10 enrichment loading with a reduction in backfill pressure from 200 to 100 psig. The nominal B-10 loading is 1.77 mg/ inch. Rod internal gas pressure has an effect on two of the fuel rod design criteria that are evaluated for the reload: Rod internal pressure and clad stress criteria.

The Zion Unit 2 Cycle Specific fuel design analysis has been performed and has demonstrated that the design criteria were met.

7.

The number of fuel assemblies (a) in the core is 193 and (b) in the spent fuel storage pool from Zion Unit 2 is 984.

8.

The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) 3012 fuel assemblies.

Of these 3012 storage locations.11 are

.o unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A. C).

9.

The projected date of the last refueling that can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule.

This assumes the Offset Tool Modification (M22-90-0-008A C) will be installed prior to June 2003. This projected date is subject to change based on outage durations or Overhaul Schedule changes.

3 of 3 ZCLERK-13