Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 2
ML20149E450
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/30/1997
From: Cygan J, Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ZRA97027, NUDOCS 9707180197
Download: ML20149E450 (13)


Text

. _ . _ _ , _ . _ .

O>mmonwcahh lihmn Company

  • Zion Generating Station e

,, , 101 $hiloh floulesard Zion. I1. (mn 2797 Tcl M 17 7 Kv208i ZRA97027 July 14, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 1

Dear Sir:

Attached is the June Operating Status Report.

b R. S. Starkey Plant General Manager Zion Station RSS/jlc Enclosure cc: Regulatory Assurance <

H Keiser A, B. Beach (NRC) 'f

/[ G 3

D. Farrar t{'

D. R. Eggett /

INP0 Div of Enforcement Health i State of Illinois / IONS f F. Yost i NRC Inspector. Zion IDNS Inspector, Zion Operating Engrs.

C, Y. Shiraki M. Kramer (FAC)

Master File 9707180197 970630 PDR ADOCK 05000295 R PDR

. n. Q Q$ll{$l)$%%II.I

' A timcom Company

OPERATING DATA REPORT DOCKET NO. 50-295 DATE 7/14/97 COMPLETEDBY J. CYGAN TELEPHONE (847)746 2084 X3169 OPERATING STATUS

1. Unit Name: Zion Unit 1 -
2. Reporting Period: 0000 060197 to 2400 063097 Notes
3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): 1040
6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720.0 4.343.0 205.991.0
12. Number Of Hours Reactor Was Critical 00.0 1.238.3 138.741.3
13. Reactor Reserve Shutdown Hours 00.0 0.0 2.612.8
14. Hours Generator On-Line 00.0 1.238.3 134.804.2
15. Unit Reserve Shutdown Hours 00.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 00.0 3.442. 79.0 398.004.120
17. Gross Electrical Energy Generated (MWH) 00.0 1.137. LSC 1 129.673.297
18. Net Electrical Energy Generated (MWH) 00.0 1 079.324. 123.571.046
19. Unit Service Factor 00 0 28.' 65.4
20. Unit Availability Factor 00.0 28. f 65.4
21. Unit Capacity Factor (Using MDC Net) 00.0 23.9 57.7
22. Unit Capacity Factor (Using DER Net) 00.0 23.9 57.7
23. Unit Forced Outage Rate 00.0 00.0 15.8
24. Shutdowns Scheduled Over Nex; 6 Noths (Type. Date, and Duration of Each):
25. If Shut Down.At End Of Report Period. Estimated Date of Startup: No estimated date 26.- Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

OPERATING DATA REPORT DOCKET NO. 50-304 DATE 7/14/97 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 ,

X3169 OPERATING STATUS

1. Unit Name: Zion Unit 2

?. Reporting Period: 0000 060197 to 2400 063097 Notes

3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe):  :.040
6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, if Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr-to-Date Cumulative l

!' 11. Hours in Reporting Period 720.0 4.343.0 199.704.0

12. Number Of Hours Reactor Was Critical 00.0 00.0 138.378.7
13. Reactor Reserve Shutdown Hours 00.0 00.0 226.1
14. Hours Generator On-Line 00.0 00.0 135.098.8
15. Unit Reserve Shutdown Hours 00.0 00.0 0.0
16. Gross Thermal Energy Generated (MWH) 00.0 00.0 402.647.369 1
17. Gross Electrical Energy Generated (MWH) 00.0 00.0 130.102.951. i
18. Net Electrical Energy Generated (MWH) 00.0 00.0 124.095.088.
19. Unit Service Factor 00.0 00.0 67.6
20. Unit Availab.b ty Factor 00.0 00.0 67.6
21. Unit Capacit; iictor (Using MDC Net) 00.0 00.0 59.7 i
22. Unit Capacitj factor (Using DER Net) 00.0 00.0 59.7
23. Unit Forced ?;t. age Rate 00.0 -

00.0 13.3

24. Shutdowns Ssneduled Over Next 6 Months (Type, Date, and Duration of Each):

i

25. If Shut Down At End Of Report Period, Estimated Date of Startup: No estimated date

. 26. Units in. Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION T i

UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 50-295 UNIT RAME Zion Unit 1 -

DATE 7/14/97 -

COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH June 1997 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Snutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor 4 06/01/97 5 720.0 *H 1 97-005 Unit 1 Remained Off-Line For The Entire Month For Maintenance Outage Z1M06.

  • H - Please refer to colunn on right (Cause & Corrective Actions) 1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File '

D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

UNIT SH' J TDOWNS AND POWER REDLCTIONS DOCKET NO. 50-304 UNIT NtNE Zicn Unit 2 - ~

DATE 7/14/97 COMPLETED BY J CYGAN TELEhiONE (847) 746-2084 x3169

. REPORT MONTH June 1997 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor 7 06/01/97 5 720.0 C 1 Unit 2 Remained Off-Line For The Entire Month For '

The Continuation '

Of Refueling Outage Z2R14.

?

1 2 3 4 ,

F: Forced Reason: Method Exhibit G - Instructions i S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee .

C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source t H-Other (Explain) i

l l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-295 _

UNIT Zion Unit 1 DATE 7/14/97 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 MONTH June 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -6 17 -7 1 2 -6 18 -7 3 -6 19 -7 4 -6 20 -7 5 -6 21 -7 6 -6 22 -7 7 -6 23 -7 8 -6 24 -7 9 -6 25 -6 10 -6 26 -6 11 -6 27 -6 12 -6 28 -5 13 -7 29 -5 14 -6 30 -5 l l

15 -7 31 l 16 -7 INS 1 RUCTIONS On this format, list the.' average daily unit power level in MWe-Net for each day in the reporting month, Cunpute to the nearest whole megawatt.

I

.= ... . . - = . _ . . = = - . - . . - . . . . - .- . . - - _ . . . .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 304 UNIT Zion Unit 2 DAl_ 7/14/97 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 June -1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 5 17 -6 2 -5 18 -6 3 -5 19 -6 4 -5 20 -6 5 -5 21 -6 6 -5 22 -6 7 -5 23 -7 8 -5 24 -7 1

9 -5 25 -6

, 10 -5 26 -5 11 -5 27 -5 12 -5 28 -5 13 -6 29 -5 14 -6 30 -5 15 -6 31 16 -6

INSTRUCTIONS

' On this format, list the average daily unit power level in MWe Net for each day in the reporting month, Compute to the nearest whole megawatt.

1 e

4 r

l June 1997

SUMMARY

OF OPERATING EXPERIENCE i

l 1

UNIT 1 Unit 1 began June off-line for a continuation of Maintenance Outage (Z1M06)

I and remained off-line for the entire reporting period. There is no scheduled '

date for Unit 1 to be back on-line.

(LNill Unit 2 began June off-line for a continuation of Refueling Outage (Z2R14) and remained off-line for the entire reporting period. There is no scheduled date for Unit 2 to be back on-line.

1 s

a 1

4 4

T 4

k

. . - , - . . . - . . - ,, . . - , .,. , . , - , , -,-,-.a - , , ..,n

l i 9 '

June 1997 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 1)

'O' 0/G Output Breaker Repair

Completed 4- 005: 05/19/97 - 06/09/97

'O' 0/G Repair Jacket Water Drive Chain Cover Completed 00S:. 06/22/97 - 06/23/97

'O' D/G Relay Work on Governor Mod Completed OOS: 06/26/97 - 06/26/97 1

1

' COMMENT:

i

,,.r.~6.,. -- .y c, . , - ,.-

=_... . -- . - - . - . . _ . . . - . ..

i

. l I

June 1997 MAJOR MAINTENANCE ~

EQUIPMENT NAME WORK PERFORMED (UNIT 2) 2A C/CB PP Cleaning / Inspection 005: 04/26/97 12A CS PP Coupling Lube Completed 005: 04/28/97 - 06/17/97

--2C CS PP Starting Solenoid Changeout Completed DOS: 04/29/97 - 06/26/97 2A AFW PP - SW Suction Piping Flush Completed 005: 06/05/97 - 06/12/97 2B H0 PP Change Oil Completed OOS: 06/02/97 - 06/17/97 2A SA COMP Overhaul Completed 00S: 06/13/97 - 06/18/97 4

5 F

  • NO RETURN T0. SERVICE DATE

. COMMENT:

. REFUELING INFORMATION REQUEST OUESTIONS;

1. Name of facility.
2. Scheduled date for next refueling shutdown.

3 .- Scheduled date for restart following refueling.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will'these be?

If answer is no has the reload fuel design and core configuration been reviewed by your Plant Safety Review Corrinittee to determine whether any unreviewed safety questions are associated with the' core reload (Ref.10 CFR Section 50.59)?

If no such review has taken place..when is it scheduled?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations associated with refueling, e.g.. new or different fuel design or supalier, unreviewed design or performance analysis methods, significant c1anges in fuel design, new operating procedures.
7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel

.torage

' pool.

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned. in the number of fuel assemblies.
9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

i Page-1 of 3 1 i

l i

REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS:

1. Zion Unit 1.
2. Cycle 15 has no scheduled shutdown date for refueling.
3. Cycle 16 has no scheduled date.
4. The following License Amendments are required to allow resumption of operation after Refueling Outage Z1R15.

e Increase Steam Generator plugging limit. Required to ensure Unit derating will not be required based on Steam Generator plugging.

e Authorize Steam Generator tube sleeving per new Topical Report.

Required to allow additional sleeving options to minimize plugging, o Authorize new F* limit on tube re-roll and new EF* re-roll limit.

Recuired to support increased plugging limit. Required to allow adcitional re-roll options to minimize plugging.

The Reload Safety Analysis for cycle 16 will be completed during Z1R15.

5. Projected submittal of License Amendments: June-July 1997.
6. Not applicable.
7. The number of fuel assemblies (a) in the core is 0. and (b) in the spent fuel storage pool from Zion Unit 1 is 1125.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 3012 fuel assemblies. Of these 3012 storage locations 11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A C).
9. The projected date of the last refueiing than can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1997 Projected Comed Overhaul Schedule. 1his assumes the Offset Tool Modification (M22 90 0 008A. C) will be installed prior to June 2003.

This projected date is subject to change based on outage durations or Overhaul Schedule changes.

1 2 of 3 i

l

9 REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:

1. Zion Unit 2.
2. Cycle 14 shutdown September 19, 1996 for refueling.
3. Cycle 15 has no scheduled date for start up.
4. A License Amendment converting the current Technical Specifications to Improved Technical Specifications is required to allow resumption of operation after Refueling Outage Z2R14.
5. The proposed License Amendment converting the current Technical Specifications to Improved Technical Specifications has been submitted.
6. New fuel reloaded into Unit 2 Cycle 15 core incorporates the following design changes:
  • Selected standard Integral Fuel Burnable Absorber (IFBA) patterns have been updated following a Westinghouse Core Engineering investigation of peripheral IFBA rod loading within the fuel assembly. The net effect of this change is tc achieve the most efficient absorber orientation at Beginning of Life (BOL) and for burnups through 5000 MWD /MTU. These patterns provide self-limiting features that mitigate the extent of DNB propagation. In addition, these IFBA patterns provide significant peaking factor and reactivity holddown benefits, e IFBA rods will have a nominal B-10 enrichment loading with a reduction in backfill pressure from 200 to 100 psig. The nominal B-10 loading is 1.77 mg/ inch. Rod internal gas pressure has an effect on two of the fuel rod design criteria that are evaluated for the reload: Rod internal pressure and clad stress criteria.

The Zion Unit 2 Cycle Specific fuel design analysis has been i performed and has demonstrated that the design criteria were met. l

7. The number of fuel assemblies (a) in the core is 193 and (b) in the spent fuel storage pool from Zion Unit 2 is 984.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 3012 fuel assemblies. Of these 3012 storage locations. 11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A. C).
9. The projected date of the last refueling that can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations l (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the j 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool l Modification (M22-90-0-008A. C) will be installed prior to June 2003. l This projected date is subject to change based on outage durations or ,

Overhaul Schedule changes. l 1

1 3 of 3 )

!