MONTHYEARA99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 A97036, Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2 ML20217M4151997-07-31031 July 1997 Corrected Page to Monthly Operating Rept for Jul 1997 for Zion Generating Station,Unit 1 A97027, Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 2 ML20148L5771997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Zion Generating Station,Units 1 & 2 ML20141D8601997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Zion Station Units 1 & 2 ML20217M4011997-03-31031 March 1997 Corrected Page to Monthly Operating Rept for March 1996 for Zion Generating Station,Unit 1 ML20137Y1491997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Zion Unit 1 ML20136J5091997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Zion,Units 1 & 2 ML20135A5311997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Zion Station Units 1 & 2 ML20133M1891996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Zion Generating Station Units 1 & 2 ML20132D7401996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Zion Generating Station Units 1 & 2 ML20134K7121996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Zion Generating Station Units 1 & 2 ML20134K7531996-09-30030 September 1996 Corrected Monthly Operating Repts for Sept 1996 for Zion,Units 1 & 2 ML20129B3711996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Zion Generating Station ML20134K7491996-08-31031 August 1996 Corrected Monthly Operating Repts for Aug 1996 for Zion,Units 1 & 2 ML20217M4071996-04-30030 April 1996 Corrected Page to Monthly Operating Rept for Apr 1996 for Zion Generating Station,Unit 1 ML20149K2411996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Zion Unit 1 ML20149G2851994-09-30030 September 1994 Monthly Operating Repts for Sept 1994 for Zion Generating Station ML20058K2281993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Zion Generating Station ML20058K2341993-10-31031 October 1993 Corrected Monthly Operating Rept for Oct 1993 for Zion Unit 2 ML20059K0731993-10-31031 October 1993 Monthly Operating Repts for Oct 1993 for Zion Generating Station Units 1 & 2 ML20058P1631993-09-30030 September 1993 Monthly Operating Repts for Sept 1993 for Zion,Units 1 & 2 ML20057B6921993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for Zion,Unit 1 ML20056D6881993-07-31031 July 1993 Monthly Operating Repts for Jul 1993 for Zion Generating Station,Units 1 & 2 ML20128K6951993-01-31031 January 1993 Monthly Operating Repts for Jan 1993 for Zion,Units 1 & 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98049, Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 21998-09-25025 September 1998 Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 2 ML20195D1221998-08-31031 August 1998 DSAR, for Zion Station A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 ML20236J7911998-06-12012 June 1998 LER 98-S02-00:on 980517,first Shift Security Officer Reported Being Wounded by Unknown Subject Who Fled Area. Caused by accidental,self-inflicted Gunshot Wound.Removed Officer from Duty & Charged Officer W/Filing False Rept A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 A98034, 1997 Annual 10CFR50.59 Summary Rept1997-12-31031 December 1997 1997 Annual 10CFR50.59 Summary Rept ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 ML20202F1451997-12-0303 December 1997 Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 ML20199J5931997-11-26026 November 1997 SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14) A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event1997-11-13013 November 1997 Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 ML20211M0181997-10-0707 October 1997 Special Rept 295-123-97-001SR:on 970904,OA Motor Declared Inoperable Due to Pin Hole Leaks Identified on Pressure Regulating Relief valve,0FP0052.Procedure Was Rewritten to Ensure 0FP0052 Would Maintain Same Pressure When Fully Open A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual 1999-09-30
[Table view] |
Text
.
Comm nwealth Edis n fot Sh$ b i$' No p 7$8 / 746 2004 l February 10, 1993 ZAD-93-002 Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555
Dear Sir:
l Attached is the January 1993 Operating Status Report. !
T. P. Joyle I Station Manager Zion Station IPJ/jlc Enclosure cc: Regulatory Assurance USNRC Document Control l
M. Wallace A. B. Davis (NRC)
J. Leider T. Rieck T. J. Kovach D. R. Eggett 1:lP0 Div. of Eng. Health State of Illinois F. Yost B. Gallo H. Granjean NRC Inspector, Zion P. Graessle Operating Engrs.
C. Patel - Fax Master File 18:199 ZCLERK-5(1) f gk
/ i gpi l
9302180253 930131 /'
PDR ADOCK 0500 5 g
OPERATING DATA REPORT DOCKET No._50-295 DATE_D2LLOI93 COMPLETED BY_L_Cygatn TELEPHONE _110BLl46-2DfL4_
X3169 OEffB11FG_SIMUS
- 1. Unit Name: ._ Zion _Unitj _
- 2. Reporting Period: 0000_93Q10Lio_1400_13011L Notes
- 3. Licensed Thermal Power (MHt): 3250
- 4. Nameplate Rating (Gross MHe):_ 10fl5
- 5. Design Electrical Rating (Het HHe): 1030
- 6. Maximum Dependable Capacity (Gross MHe):._1085
- 7. Maximum Dependable Capacity (Net HHe): __l0A0_
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:_ N/A
- 9. PowerLevelToWhichRestricted,IfAny(NetMHe5I N/A
- 10. Reasons For Restrictions If Any: N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Perlod 741 1 74.410_. 167.32820_
- 12. Number Of Hourn Reactor Has Critical 744.0_. 744.0 112.316.5._
- 13. Rekctor Reserve Shutdown Hours __. 01 020_ 2. 6211B_
- 14. Hours Generator On-Line 744.0_ 744 0_ ___LOL100mL
- 15. Unit Reserve Shutdown Hours _ 020_.. 0.0_ OA
- 16. Gross Thermal Energy Generated (MHH) L32LfL4L _ _L321245_ _31L.05L136_
- 17. Gross Electrical Energy Generated (MHH) 780JLL 7aQ.314 _103.314.328._
- 18. Het Electrical Energy Generated (MHH) 758.013_ 75.84013_ __18.283.66L
- 19. Unit Service Factor 100.0_ 100 A 65.5_
- 20. Unit Availability Factor 100 A 100.0_ 65 1
- 21. Unit Capacity Factor (Using MDC Net) 9L9_ 91 1 56 1
- 22. Unit Capacity Factor (Using DER Net) _ 97. 9__ 97 9_ 56.4
- 23. Unit Forced Outage Rate 040_ _ OA 16 1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period Estimated Date of Startup: . .
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY _
INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-5(2)
OPERATING DATA REPORT I
DOCKET NO._50:304 DATE_D2Ll0193 COMPLETED BY_L_Cymta '
TELEPHONE _GD8L216:20fLL
_K3169 l
1 OEEMUEG.il&IUS
- 1. Unit Name
- _11on Unit 2_
i 2. Reporting Period: 0000_93010Lta_2400_930131 Notes i 3. Licensed Thermal Power (MHt):. 3250
- 4. Nameplate Rating (Gross MHe): 1985 ,
- 5. Design Electrical Rating (Net MHe):__ 1040 '
- 6. Maximum Dependable Capacity (Gross MHe):__.10BL ,
- 7. Maximum Dependable Capacity (Net MHe): 10A0_
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last
- Report, Give Reasons
- N/A
- 9. Pcaer Level To Which Restricted If Any (Net MHe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative 4
i
- 11. Hours In Reporting Period 74LD0_ 744.0_ 16LD4LQ_
4
- 12. Number Of Hours Reactor Has critical 0.0_ 0.0 - 114.53LL i
- 13. Reactor Reserve Shutdown Hours 0.0 0.0_ _ 226 l_
- 14. Hours Generator On-Line .D A __0J 111.571<0_
- 15. Unit Reserve Shutdown Hours _0J 0.0_ Q4D_
, 16. Gross Thermal Energy Generated (MHH) 0A_ 0.0 _330,692.340_
- 17. Gross riectrical Energy Generated (MHH) 0 10_ 0 . 0_ __ _101J61J3L
- 18. Net Electrical Energy Generated (MHH) 0J_ 01 0_ _l0L 110 464_
- 19. Unit Service Factor 0.0_ 0.0_ 692L
- 20. Unit Availability factor 0J_ OJ _ ___ _69 2_
- 21. Unit Capacity Factor (Using MDC Net) 0A_ 0A .50 L
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.D_ 60.3
- 23. Unit Forced Outage Rate 00 1 D.0_ l.515_
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Z2R12 - Refueling._lll12/92 - OZl25L93 l
~
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:._02/2iL9L
- 26. Units In Test Status (Prior to Commercial _ Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-5(3) 3
UNIT SHUTCONMS AND POWER REDUCTIONS DOCKET NO. M-295 UMIT SAME Ilca_Qnit 1
- ATE QZL10/93 00MPLETED BY J. Cycan .
TELEPHONE (708) 746-208a x3169' REPORT MONTH _ January 1991_
Duration , Method of Licensee Systga Compogant Cause & Corrective Type l Reason 4 Shutting Event Code Code Action to No. Pate (Hours)
Down Report # Prevent Recurrence Reactor 3 At 1530 GSEP was de-01/04/93 F 2 A 5 clared. 18 SI Pp OOS
& 1A Chg Pp became inoperable due to high vibration on speed changer.
Started power reduc-tion. At 1740 power reduction stopped.
Halver from NRC for 24 hrs. received.
Ramped unit to normal power. Normai power operation for duration of month.
3 4 1 2 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual _ for Preparation of Data
[
B-Maintenance of Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & Licensee Examination S-Reduced Load S
F-Administrative G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)
ZCLERK-5(4) k_
UNIT SHUTDOWNS 'AND POHER REDUCTIONS DOCKET NO.
50-304 UNIT NAME Zion Unit 2 DATE 02/10/93 .
COMPLETED BY J. Cygan TELEPHONE (708) 746-2084 x3169 REPORT MONTH January 1993 Duration Method of Licensee Systgm Compogent Cause & Corrective No. Date Type l (Hours) Reason', Shutting Event Code Code Action to Down Report # Prevent Recurrence Reactor 3 01/01/93 5 744.00 C Continuation of Refueling Outage 1 2 3 4 F: Forced Reason: tiellipd Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Sare Source H-Other (Explain)
ZCLERK-5(5)
4 i .
AVERAGE DAILY UNIT POWER LEVEL l DOCKET N0._50 295-UNIT _ZlonJalt 1 DATEJZLLO193
- COMPLETED BY_A_Cygan TELEPHONE _UDaLL46
- 2014_
j .23169 HONTH JADuitry 1993 2
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- (MWe-Net) (MWe-Net) l 1 1.019 17 . 1.D28 1
j 2 LD.30_ 18 1.057 2
3 .9aB 19 1.058 4 _IRL 20 LDl9 4
1 5 _A60 21 1 022_
l 6 1,011 22 1 94]
7 IJ55 23 1 006 8 1.051 24 945
) 9 IJ5.4 25 1.029 l 10 1.0AE 26 1.037 11 _1A54 27 1.n3D 12 1.050_ 28 989 13 IJ13 29 1.051 14 1.047 30 1.053.
c 15 1.CLU_ 31 LD52 16 _1A30 INSTRIcTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
ZCLERK-5(6)
t
\
AVERAGE DAILY UNIT POWER LEVEL l
.i, a DOCKET N0._50-30.4 i
'.! UNIT _11.on Unit 2 l DATE._02LLOL93 i
~
COMPLETED BY_L _Cygan )
TELEPHONE _(10allsh-20BA
.131b2 f MONTH January 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MHe-Net) (HWe-Net) l 1 -12 17 -
12--- l 1
l 2 -12 18 - 12
! 3 . -12 19 - 11
! 4 -12 20 - 12 5 -12 21 __ - 12 6 -12 22 - 11 l 7 -12. 23 - 12 i
! 8 -12 24 -
12 i
- 9 -12 25 -12 10 -12 . . _ 26 - 12 i 11 -12 27- .12 12 -12 28 - 12 i
13 -12 29 - 11 14 -12 _ 30 - 12 15 -12 31 -
12 J
, 16 -12 _
INSTRUCTIONS On this format, list the average daily unit power level in MHe-Net for'each day in the reporting month. Compute to the nearest whole megawatt.
4 ZCLERK-5(7) 4
-r -
-,y -r- -r-- - , . , , , - - . . _ . , ,y ,,.,,,.,.,.m.,- . -e,,-, e., y, p -we4-,- -,-n-,,,-.,y .wn.-,,r,,-y v- , ~ ~ -
knuarL1993 SUM!BRLOLDEEIMIIMLEEER1LNCE UNLL1 Unit 1, began January at 1089 MWe power level (99.4% reactor power). On January 4, 1993 at 1530 a GSEP was declared, 10 51 Pump was 005 and 1A Charging Pump became inoperable due to high vibration on speed changer, power reduction was started.
At 1740 power reduction was stopped. A waiver was received from the NRC for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Unit I was at 385 Mwe and starting power increase to normal power per load dispatcher directions.
Normal power operation for duration of month. The Unit concluded the 5eporting period at 1097 MHe power level (99.5% reactor power).
UlilL2 Unit 2, began January in a Refueling Outage, Mode 6 and stayed in Mode 6 until January 22, 1993 when the Mode changed to CSD Mode 5. Refueling Outage continues with projected on line date of February 25, 1993.
ICLERK-5(8) i
t1Anuary.1993
. tWOR_5MEII REL&ILDJdAINIENANCE
'EquipmentJiam Hei_feriormed -
(UNIT 1) 0A CC Pump Rotor Axial Movement: Hork Completed 005: Continued - 1/1/93 "0" Pp Air Comp Inspect / Clean Cooler: Hork Completed 005: Continue - 1/24/93 OA Fire Pump Sheared Sensing Line: Repair Completed & 011 Changed 005: Continue - 1/7/93 OB CC Pump 011 Change - PM Hork: 011 Changed 00S: 1/4/93 - 1/4/93 IB ST Pump Rectre Line Check Valve Repair:
Hork Completed 005: 1/3/93 - 1/5/93 1A Chg Pump High Vibes on Speed Changer:
Vibration Found Acceptable 005: 1/4/93 - 1/7/93 1A D/G Hater in 011: Hater Leak Repaired 005: 1/10/93 - 1/12/93 1C CD/CDB Pp Clean Strainer: Strainer Cleaned 005: 1/13/93 - 1/13/93 1C FH Pump LoveJoy Contr. Calibration:
Calibrated LoveJoy System 005: 1/15/93 - 1/15/93 1C CH Pump Upper Bearing Motor Sightglass:
Sightglass Leaks Repaired 005: 1/21/93 - 1/21/93 OD CC Pump Replace Carbon Steel Cooling Lines:
Hork Cooling Lines 00S: 1/21/93 - 1/24/93
- 1 Pp Air Comp Failed to Start Locally: Cooler Leak Repaired 005: 1/24/93 *
- 2 Pp Air Comp Does Not Stop Hhen Pressurized:
Sensing Lines Cleaned Up OSS: 1/24/93 - 1/24/93 2A IA Comp Tripping On Vibration: Adjusted Vib Trip Sensor 005: 1/?2/93 - 1/25/93 COMMENT:
During the Maintenance Run the Compressor Ran Hot - Investigating ZCLERK-5(9)
I
, , hnuary_1993 MA20fLSAfRLRELAIED_HAIRIEHANCE Entdpmentflame dori.feriormed (UNIT 2)
REFUELING OUTAGE 9
ZCLERK-5(10)
REIVEl.ING IlfEORMAIIO!LREQUESI Queitions:
- 1. Name of facility.
- 2. Scheduled date for next refueling shutdown.
- 3. Scheduled date for restart following refueling.
- 4. Hill refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If no such review has taken place, then is it scheduled?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations associated with refueling, e. g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
- 7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
- 8. The present Itcensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
Page 1 of 3 ZCLERK-5(11)
l Un11_3_z_ Answers t 1. Zion Unit 1
- 2. Cycle 13 is scheduled to shutdown September 9, 1993 for refueling.
- 3. Cycle 14 is scheduled to start up February 7, 1994.
I 4. No Technical Specification changes are planned for Z1C14 so far.
- 5. Not appilcable or none proposed.
- 6. Not applicable. <
- 7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool from Zion Unit 1 is 784.
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 2112 fuel assemblies. Plans are being developed to rerack the Spent Fuel Pool to increase storage capacity to 3012 assemblies. j i
- 9. Zion Station will lose dual full core discharge capability in February 1994, at the beginning of Unit 1 Cycle 14, based on the latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single core will be lost in February 1996, at the beginning of Unit 2 Cycle 15.
l Page 2 of 3 l:
ZCLERK-S(12)
Unit 2 - Annen
- 1. Zion Unit 2
- 2. Cycle 12 was Shutdown November 12, 1992 for refueling.
- 3. Cycle 13 is scheduled to start up February 20, 1993.
- 4. Yes. Technical Specification changes have been made to include the Hestinghouse VANTAGE fuel design being loaded for Z2C13, and effects of the vessel fluency reduction program beginning with Z2C13.
A Tech Spec change has also been made that will allow CECO to use a CORE OPERATING LIMITS REPORT (COLR) in place of some existing Tech Spec Limits.
- 5. License amendments for the Z2C13 reload were submitted in Summer 1991, and were approved July 26, 1992 Amendment 128,
- 6. License considerations atsectated with the Z2C13 reload include the new VANTAGE fuel design, and the new LOCA analysis with higher core power peaking factors required for the low-low-leakage loading pattern used in 22C13.
- 7. The number of fuel assemblies a) in the core is 193 , and b) in the spent fuel storage pool from Zion Unit 2 is 840,
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies. Plans are being developed to rerack the Spent Fuel Pool to increase storage capacity to 3012 assemblies.
- 9. Zion Station will lose dual full core discharge capability in February 1994, at the beginning of Unit 1 Cycle 14, based on the latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single core will be lost in February 1996, at the beginning of Unit 2 Cycle 15.
Page 3 of 3 L ZCLERK-5(13)- ,
4 4 ADDENDUM TO ZION STATION HONTHLY REPORT Special Report submitted in accordance with Zion Tech Spec. Sury. 4.15.1.B.5 This report addresses one valid failure of the 0 EDG. The criteria to determine valid tests is in accordance with section C.2.e of Reg. Guide 1.108.
On January 10, 1993 the IA EDG was declared inoperable due to a high concentration of water in the lube oil. Investigation revealed that jacket water was entering the lube oli through a cylinder head stud hole. The cylinder head was replaced and the EDG was declared operable following the successful performance of PT-11. As of January 31, 1993 this was the 6th valid railure in the last 100 valid unit demands for Unit 1. This failure was determined to be valid per Reg. Guide 1.108 C.2.e.
The tett frequency for IA EDG changed to 7 days.
ICLERK-5(14)