Monthly Operating Repts for Oct 1993 for Zion Generating Station Units 1 & 2
ML20059K073
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/31/1993
From: Broccolo E, Cygan J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ZAD-93-011, ZAD-93-11, NUDOCS 9311150179
Download: ML20059K073 (13)


Text

.-

Comm:nwarlth Edis:n j

Zion Generating Station 101 Shiloh Blvd.

Zion, Illinois 60099 Telephone 708 / 746-2084 1

1 j

1 i

i l

November 10, 1993 ZAD-93-011 Nuclear Regulatory Commission Document Control Desk Washington. DC 20555 i

Dear Sir:

Att:ried is the October 1993 Operating Status Report.

I i

l

./27(A

/]

StationManager[]

E /A. Broccolo 1

Zion Station TPJ/jlc Enclosure cc:

Regulatory Assurance USNRC Document Control M. Wallace J. Martin (NRC)

T. Rieck D. Farrar D. R. Eggett INFO Div. of Enforcement Health State of Illinois F. Yost NRC Inspector. Zion Operating Engrs.

1 C. Y. Shiraki - Fax Master File tj 3

l'j'g l

ZCLERK-5 (1) gj1100179931031 V

ADOCK 05000295 R

.'i PDR g

5 4'

l

OPERATING DATA REPORT j

50 295 l

1 DOCKET NO.

DATE 11/10/93 1

COMPLETED BY J. Cycan TELEPHONE (708)746-2084 l

X3169 j

OPERATING STATUS

j 1.

Unit Name:

Zion Unit 1 Li 2.

Reporting Period: 0000 100193 to 2400 103193 Notes 3.

Licensed Thermal Power (MWt):

3250 4.

Nameplate Rating (Gross MWe):

1085 5.

Design Electrical Rating (Net MWe):

1040 6.

Maximum Dependable Capacity (Gross MWe): 1085' 1

7.

Maximum Dependable Capacity (Net MWe):

1040 I

j 8.

If Changes Occur in Capacity Ratings (1tems Number 3 Through 7) Since Last Report. Give Reasons:

N/A j

j 9.

Power Level To Which Restricted. If Any (Net MWe):

N/A

-l 10.

Reasons For Restrictions, If Any:

N/A I

'i This Month Yr-to'-Date Cumulative -

-745.0 7.296.0' 173.880.0 l

11.

Hours,o Reporting Period 12.

Number 0f Hours Reactor Was Critical 482 3 6.987.6 119.420.1 13.

Reactor Reserve Shutdown Hours 0.0 0.0-2.621.8 14.

Hours Generator On-Line 480.4 6.967.0

-115.923.1 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 8

16.

Gross Thermal Energy Generated (MWH) 1.394.650.0-21.839.856.0 338.573.147 i

17.

Gross Electriccl Energy GeneratedO4WH) 456.196.0 7.295.546.0-109.859.560 18.

Net Electrical Energy Generated (MWH) 435.312.0 7.020.977 0 104.546.571 19.

Unit Service Factor 64.5 95.5 66.7

[

20.

Unit Availability Factor 64.5 95.5 66.7-21.

Unit Capacity Factor (Using MDC Net) 56.2 92.5-57.8-22.

Unit Capacity Factor-(Using DER Net)

-56.2 92.5 57.8 23.

Unit Forced Outage Rate 0.0 0.9

- 15. 9 -

i 24.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

]

I

~

25.

If Shut Down At End Of Report Period. Estimated Date of:Startup: 3/31/94

-26.

Units In. Test Status (Prior to Commercial Operation):

Forecast-Achieved 3

INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION l,

  • 1 Hour added for Time Chance from Daylicht Savinas Time to Central Standard Time-ul i

'. ZCLERK-5.(2):

j pL.

+

1 t

OPERATING DATA REPORT j

DOCKET N0.~

50-295-DATE 11/10/93 COMPLETED BY J. Cvoan TELEPHONE

-(708)746-2084 1

2 X3169.

)

OPERATING STATUS Jj i

j 1

Unit Name:

Zion Unit 2 2.

Reporting Period: 0000100193 to 2400103193 Notes 3.

Licensed Thermal Power (MWt):

3250 i

4.

Nameplate Rating (Gross MWe):

1085 5.

Design Electrical Rating (Net MWe):

1040 6.

Max; mum Dependable Capacity (Gross MWe): 1085 1

7.

Maximum Dependable Capacity (Net MWe):

1040.

j 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.

Give Reasons:

N/A

,)

i I

9.

Power Level To Wnich Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions. If Any:

N/A l

L l

This Month Yr-to-Date Cumulative 1

745.0 7.296.0'

._ 167.593.0~

d 11.

Hours In Reporting Period 12.

Number Of Hours. Reactor Was Critical 144.8 5.427 4 119.965.1 i

13.

Reactor Reserve Shutdown Hours 0.0

- 0. 0 226.1 J

14.

Hours Generator On-Line 144.5-5.427.1 117.006.1

-l 15.

Unit _ Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 445.783:0 16.437.447.0 347.129.787 17.

Gross Electrical Energy Generated (MWH) 150.340.0 5.513.227.0 111.681.162-

I 18.

Net Electrical Energy Generated (MWH) 138.001.0 5.292.177.0--

106.402.841 19.

Unit Service Factor 19.4 74.4 69.8

.i 20.

Unit Availability Factor 19,4 74.4

-69.8 i

21.

Uriit Capacity Factor (Using MDC Net) 17.8 69.7-61.0 t

22.

Unit Capacity Factor (Using DER Net) 17.8 69.7 61.0 23.

Unit Forced Outage Rate 0.0..

0.0 15.0 24.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

l 25.

If Shut Down At End Of Report Period, Estimated Date of Startup: 3/8/94 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved.

]

INITIAL CRITICALITY-INITIAL ELECTRICITY ~

A COMMERCIAL OPERATION l

  • 1 Hour added for Time Chance from Daylioht Savinos Time to Central Standard Time l-

.l l

1 i

i L

ZCLERK-5 (3)

-l

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-295 UNIT NAME Zion Unit 1 DATE-11/10/93 COMPLETED BY J. Cycan TELEPHONE (708) 746-2084 x3169.-

REPORT MONTH OCTOBER 1993 1

Duration 2

Method of Licensee System Component Cause & Corrective No.

Date Type (Hours)

Reason Shutting Event Code 4 Code 5 Action to Down 3 Report #

Prevent Recurrence Reactor 10/16 S

98.2 8

5 Power reduction to 50%

in preparation for-Main Steam Safety Valve Test.

10/21 S

264.6 C.

1 Unit shutdown for Refueling Outage.

'1 2

3

-4 Method Exhibit G - Instructions F: Forced-

-ReasonhntFailure(Explain)

S: Scheduled A-Equi 1-Manual for Preparation of Data B-Maintenance or_. Test 2-Manual Trip Entry Sheets for Licensee-

~C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued:

(NUREG-0161)

E-Operstor Training & Licensee Examination 5-Reduced Load F-Adtronistrative 5

'G-Operational Error (Explain).

Exhibit 1 - Same Soarce H-Other.(Explain)

'ZCLERK-5.(4)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-304

~

-UNIT NAME Z1on Unit 2 DATE 11/10/93 COMPLETED BY J. Cycan TELEPHONE (708) 746-2084 x3169' REPORT MONTH OCTOBER 1993 1

Duration 2

Method of Licensee System Component Cause & Corrective No.

Date Type (Hours)

Reason Shutting Event Code 4 Code 5 Action to Down 3 Report #

Prevent Recurrence Reactor 10/06 5

4.5 B

5 Power reduction started for Unit Outage.

10/07 599.5 F

1 Service Water Outage.

1 2

3

^4 F: Forced Reason:

Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)-

1-Manual for Preparation'of Data:

B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5

G-Operational Error (Explain)

Exhibit 1 - Same. Source H-Other-(Explain)-

<ZCLERK-5.(5) v.

I e

AVERAGE DAILY' UNIT POWER-LEVEL DOCKET'NO. 50-?95 UNIT Zion Unit 1 DATE-11/10/93 COMPLETED BY J. Cycan

-TELEPh9NE-(708) 746-2084 x3169 MONTH OCTOBER 1993-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)-

1 1.023 17 507 2

1.025 18 468 3

1.024 19 468 4

1.026 20 441 5

1.025 21

-16 6

1.025 22

-15 7

1.008 23

-13 8

1.016 24

-13 9

1.020 25

-9 10 1.027 26

~9 11 1.024 27'

-9 12-1.027 28'

-9 13 1.028 29

-9 14 1.028

'30

-9 15 1.029 31

-9 16 1.022 INSTRUCTIONS

' On this format'. list the average daily unit power level in MWe-Net for each day 'inL the-reporting month. Compute to the nearest whole megawatt.

ZCLERK-5 (6)

l
l 3

AVERAGE DAILY UNIT POWER LEVEL l

l J

DOCKET NO. 50-304 i

UNIT Z1on Unit 2 i

DATE 11/10/93 j

COMPLETED BY J. Cyaan TELEPHONE (708) 746-2084 x3159 I

MONTH OCTOBER 1993 j

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 7 (MWe-Net)

(MWe-Net) l 1

1.040 17

-12 1

2 1.028 18

-12 3

1.014 19

-12

.s 4

1.038 20

-12 i

i 5

1.014 21

-16 6

897 22

-15 7

-12 23

-12 8

-13 24 !

9

-12 25 28 l

10

-12 26 ;

11 27.

-8 l

12

-12 28-

-8 13

-12 29

-8 14-

-12

30 8

15'

-12 31

-8 16

-12

-l t

.d INSTRUCTIONS j

.i On this format, list the average daily unit power level.in MWe-Net. for. each day in the; j

reporting month, Compute to the nearest whole megawatt.

a

1

-ZCLERK-5-(7F

^

8 i

~ ]

~

1 OCTOBER 1993-l

?

SUMMARY

OF OPERATING EXPERIENCE /

1 UNIT 1 Unit-1 began October at 1070 MWe power level (100% reactor power).

_j l

On 10/16/93 at 2210 power reduction to 50% was started in preparation:for Main-Steam Safety Valve Test and reached on 10/17/93 at 0415.

q On 10/21/93 at 0022 Unit 1 was shutdown for Refueling Outage Mode-2 and Rx'

]

shutdown was at 0217 Mode 3.

'1 On 10/22/93 at 0040 Unit I was in Mode 4 cod at 1421 Unit 1 was in Mode 5.

On 10/30/93 at 1027 Unit I was in Mode 6.

j W

Unit I concluded the reporting period off-line for the Refueling Outage.

'i J

UNIT 2 ij Unit 2 began October at 1095 MWe power level (100% reactor power).

j On 10/6/93 at 2002 power reduction to 50% was started and at 2150 power was

]

reduced te 25%.

1 On10/7/93at0032 Unit 2wasshutdownforServiceWaterOutageModef2andIRx hj shutdown was at 0047 Mode 3.

+

y

~

On.10/7/93 at 1440 Unit 2 started cooldown.

d On 10/8/93 at 0240 Unit 2 was in Mode 4 and at 2027 Unit 2 was.in Mode 5.

j l

.On 10/14/93 at 0950 Unit '2 was in Mode 6, 1

The Unit concluded the reporting period off-line' for the Service Water Outage.

l l

ZCLERK-5f(8);

q

~

a e

1

~

OCTOBER 1993

.j MAJOR MAINTENANCE' l

?

EcuiDment Name Work Performed (UNif 1)

I v

1A IA Comp Major Overhaul:

005: 6/29/93 - 10/4/93 OB IA Comp PM Work - Repairs:

005: 10/31/93 t

~

i 1

i l

I t

1 i

.]

q

.t

. COMMENT (S):

Lj OB 1A Comp -Estimated RTS date is 11/12/93-

'l l

1

-ZCLERK-5-(9)

-.i j

OCTOBER 1993' j

. MAJOR MAINTENANCE i

Eauipment Name Work Performed

.i (UNIT 2) 2C SW Pp Dual Outage Support:

005: 9/01/93 - *

'i i

i t

-5 f

l a

ji

.- i

,j i

i i

COMMENT (S):

'?C SW Pp scheduled RTS at the end of the Dual Outage 1

=.

. i i

=ZCLERK 5.(10)

[

2

,w.,

e n

-w-w t

r

'4 REFUELING INFORMATION REQUEST Ouestions:

1.

Name of facility.

i 2.

Scheduled date for next refueling shutdown.

l 3.

Scheduled date for-restart following refueling, t

4.

Will refueling or resumption of operation thereafter require a i

technical specification change or other license amendment?

If. answer is yes, what, in general., will these be?

If answer is no, has the reload fuel design and core configuration been' reviewed by your Plant Safety Review Committee to determine whether.any unreviewed safety _ questions are associated _with the core reload (Ref.

10 CFR Section 50.59)?

>i If no such review has taken place, when is it scheduled?

. i 5.

Scheduled date(s) for submitting proposed licensing action _ and supporting information.

6.

Important licensing considerations associated with refueling. e. g..

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

7.

The number of fuel assemblies: (a) in the core and (b) in the spent-i fuel storage pool.

8.

The present licensed spent-fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned in number of fuel assemblies.

j 9:

The projected date of the-last refueling that can be discharged to_the i

spent fuel pool assuming the present licensed capacity.

j 6

h i

1 1

i d

q l

i Page-1 of 3

' ZCLERK-5 (11)'

j o

8 r

.=.-.

j Unit 1 - Answers 1.

Zion Unit 1 2.

Cycle 13 is scheduled to shutdown October 21, 1993 for refueling.

3.

Cycle 14 is scheduled to start up March 31, 1994.

4.

Yes. Neutron Flux - NIS Instrumentation unit change per Gamma Metrics -

l Mod. Onsite Review completed 4/8/93, submitted 4/21/93, approval was i

received on 10/29/93.

5.

Not applicable or none proposed.

j 6.

Not applicable.

7.

The number of fuel assemblies a) in the core is 0, and j

b) in the spent fuel storage pool from Zion Unit 1 is 977.

8.

The present licensed spent fuel pool. storage capacity (shared with Zion Unit 2) is 3012 fuel assemblies (only 2762 locations will be accessible).

9.

Zion Station will lose dual full core discharge capability in November l

2001 at the beginning of Unit 1 Cycle 19, based on the latest Nuclear i

Statioris Refueling Schedule. Full core discharge capability for a single core will be lost in May 2003, at the beginning of Unit 1 Cycle 20.

l l

l s

-Page 2'of 3 ZCLERK-5 (12)

i i

+

Unit 2 - Answers i

1.

Zion Unit 2 2.

Cycle 13 is scheduled to shutdown January 5.1995 for refueling.

3.

Cycle 14 is scheduled to start up March 22. 1995.

l 1

4.

Yes. Neutron Flux - NIS Instrumentation unit change per Gamma Metrics-

]

Mod. Onsite Review completed 4/8/93, submitted 4/21/93, approval was received on 10/29/93.

]

5.

Not applicable or none proposed.

q 6.

Not applicable.

7.

The number of fuel assemblies

-j a) in the core is 0. and b) in the spent fuel storage pool from Zion Unit 2 is 1.017.

j 8.

The present licensed spent fuel pool storage capacity (shared with Ziori.

}

Unit 1) is 3012 fuel assemblies (only 2762 locations will be accessible).

j 9.

Zion Station will lose dual full core discharge capability in November 2001, at the beginning of Unit 1 Cycle 19. based on the latest Nuclear J

Stations Refueling Schedule. Full core discharge capabilit" for'a single core will be lost in May 2003, at the beginning of Unit 1 Cycle.

I 20.

I i

}

l e

i i

1 1

Page 3 of 3 7 CLERK-5 (13) 1 1-