Corrected Monthly Operating Repts for Sept 1996 for Zion,Units 1 & 2
ML20134K753
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/30/1996
From: Cygan J
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20134K748 List:
References
NUDOCS 9611200017
Download: ML20134K753 (2)


Text

~

  • CORRECTED PAGE OPERATING DATA REPORT DOCKET NO. 50-295 DATE 10/10/96 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 l l

1 OPERATING STATUS l l

1. Unit Name: Zion Unit 1
2. Reporting Period: 0000 090196 to 2400 093096 Notes
3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): 1040
6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.

Give Reasons: N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative '

1

11. Hours in Reporting Period 720.0 6.575.0 199.439.0
12. Number Of Hours Reactor Was Critical 325.1 5.255.1 135.294.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 2.612.8 l
14. Hours Generator On-Line 310.4 4.959.7 131.356.9 l
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l l 16. Gross Thermal Energy Generated (MWH) 911.170.0 15.731.404.0 387.427.001
17. Gross Electrical Energy Generated (MWH) 298.894.0 5.248.624.0 126.154.697
18. Net Electrical Energy Generat<. (MWH) 280.218.0 5.029.873.0* 120.192.825*
19. Unit Service Factor 43.1 75.4 65.9
20. Unit Availability Factor 43.1 75.4 65.9
21. Unit Capacity Factor (Using MDC Net) 37.4 73.6 57.9
22. Unit Capacity Factor (Using DER Net) 37.4 73.6 57.9
23. Unit Forced Outage Rate 56.9 16.4 16.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

1

. 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved l l

l INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

  • Corrected numbers l 9611200017 961113'
PDR ADOCK 05000295 R pm

, . CORRECTED PAGE OPERATING DATA REPORT DOCKET NO. 50-304 DATE 10/10/96 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 OPERATING STATUS

1. Unit Name: Zion Unit 2
2. Reporting Period: 0000 090196 to 2400 093096~ Notes
3. Liconsed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 1085 ,

, 5. Design Electrical Rating (Net MWe): 1040  !

6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur 1r. Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A 4

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 745.0 6.575.0 193.152.0

.12. Number Of Hours Reactor Was Critical 432.5 5.846.4 138.378.7

13. Reactor Reserve Shutdown Hours 0.0 0.0 226.1
14. Hours Generator On-Line 432.5 5.688.6 135.098.8

, 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH) 1.377.370.0 17.621.672.0* 402.637.583*  !
17. Gross Electrical Energy Generated (MWH) 453 402.0 5.846.647.0 130.102.951
18. Net Electrical Energy Generated (MWH) 427.792.0 5.608.466 0* 124.085.196*
19. Unit Service Factor 60.1 86.5 69.9
20. Unit Availability Factor 60.1 86.5 69.9 I
21. Unit Capacity Factor (Using MDC Net) 57.1 82.0* 61.8
22. Unit Capacity Factor (Using DER Net) 57.1 82.0* 61.8
23. Unit Forced Outage Rate 00.0 1.3 13.3
24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):

Refuelino Outaae (Z2R14) Startina September 19. 1996 and Lastina 58 days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION _
  • Corrected numbers