Text

i f Commonwealth lihson Compan) f ,, . Zion Generating Station i

  • 101 shiloh Ik>ulevard Zion.11J099-2797 Tcl H 17-744208 i i

December 13. 1996 Nuclear Regulatory Commission l

Document Control Desk l' Washington. DC 20555  !

Dear Sir:

Attached is the November Operating Status Report.

. *//

G. K. SchwYrtz Station Manager Zion Station j GKS/jlc l Enclosure cc: Regulatory Assurance USNRC Document Control H. Keiser W. Beach (NRC)

D. Farrar D. R. Eggett INPO Div. of Enforcement Health State of Illinois /IDNS F. Yost NRC Inspector. Zion IDNS Inspector. Zion Operating Engrs.

C. Y. Shiraki Master File

}

l 3 9612200092 961130 PDR ADOCK050002y5 t R

\

ZCLERK-1 A rnk om compan>

i .

OPERATING DATA REPORT DOCKET NO. 50-295 DATE 12/13/96 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 OPERATING STATUS

1. Unit Name: Zion Unit 1
2. Reporting Period: 0000 110196 to 2400 113096 Notes.
3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): 1040
6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: N/A
9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720.0 8.040.0 200.904.0
12. Number Of Hours Reactor Was Critical 720.0 6.720.1 136.759.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 2.612.8
14. Hours Generator On-Line 720.0 6.424.7 132.821.9 -
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 2.324.618.0 20 463.252.0 392.158.849 1
17. Gross Electrical Energy Generated (MWH) 777.172.0 6.827.164.0 127.733.237
18. Net Electrical Energy Generated (MWH) -752.127.0 6.559.415.0 121.722.367 l
19. Unit Service Factor 100.0 79.9 66.1 '
20. Unit Availability Factor 100.0 79.9 66.1 ,
21. Unit Capacity Factor (Using MDC Net) 100.4 78.4 58.3 l
22. Unit Capacity Factor (Using DER Net) 100.4 78.4 58.3 ;
23. Unit Forced Outage Rate 00.0 13.1 16.0 <
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refuelino Outaae startina 4/5/97 and endino 5/25/97

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-2

._ ___ .. . .~ - ~ _ _ ._ ._. . __ . .. - ... _

4 OPERATING DATA REPORT DOCKET NO. 50-304 DATE 12/13/96 <

COMPLETED BY J. CYGAN l TELEPHONE (847)746-2084 X3169 l OPERATING STATUS 1.' Unit Name: Zion Unit 2 l 2. Reporting Period: 0000 110196 to 2400 113096 Notes

3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): 1040 l 6. Maximum Dependable Capacity (Gross MWe): 1085 l 7. Maximum Dependable Capacity (Net MWe): 1040 l 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give l Reasons: N/A
9. Power Level To Which Restricted. If Any (Net MWe): N/A ,

i 10. Reasons For Restrictions. If Any: N/A l

This Month Yr-to-Date Cumulative l

j

11. . Hours In Reporting Period 720.0 8.040 0 194.617.0 12 Number Of Hours Reactor Was Critical 00.0 5.840 T. 138.378.7
13. Reactor Reserve Shutdown Hours 00.0 tT 226.1
14. Hours Generator On-Line 00.0 5.688.6 135.098.8 l 15. Unit Reserve Shutdown Hours 00.0 0.0 0.0 l 16. Gross Thermal Energy Generated (MWH) 00.0 17.631.458.0 402.647.369 l 17. Gross Electrical Energy Generated (MWH) 00.0 5.846.647.0 130.102.951

! 18. Net Electrical Energy Generated (MWH) 00.0 5.618.358.0 124.095.088

19. Unit Service Factor 00.0 70.8 69.4
20. Unit Availability Factor 00.0 70.8 69.4 r
21. Unit Capacity Factor (using MDC Net) 00.0 67.2 61.3
22. Unit Capacity Factor (Using DER Net) 00.0 67.2 61.3
23. Unit Forced Outage Rate 00.0 1.3 13.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

l 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/25/96 i 26. Units In Test Status (Prior to Comercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I i i ZCLERK-3 l

l

UNIT SHUTDOWNS AND POWER REDUCTIONS t DOCKET NO. 50-295 UNIT NAME Zion Unit 1 DATE 12/13/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH November 1996 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor Unit 1 Remained On Line For The Entire '

Month Of November.

t T

1 2 3 4  ;

F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File '

t D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source  ;

H-Other (Explain)  ;

ZCLERK-4

UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50-304 UNIT NAME Zion Unit 2 DATE 12/13/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH November 1996 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor 7 11/01/96 5 720.0 C 1 Unit 2 Remained Off-Line For The Entire Month Of November For Refueling Outage Z2R14.

r 1 2 3 4 F: Forced Reason Method Exhibit G - Instructions 5: Scheduled A-EquihentFailure(Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 ,

G-Operational Error (Explain) Exhibit 1 - Same Source >

H-Other (Explain)

ZCLERK-5

. . _ . . - - _ _ . _ . . _ . - - . _ . . _ _ _ _ ~ .

9 i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-295 #

UNIT Zion Unit 1 f DATE 12/13/96 [

COMPLETED BY J. CYGAN i TELEPHONE (847) 746-2084 1 x3169 i I

MONTH November 1996 -

I DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL GiWe-Net) (MWe-Net) .f 1 1046 17 1046  :

\

2 1043 18 1045 i 3 1045 19 1042 i 4 1045 20 1044 i 5 1046 21 1044 6 1048 22 1045 7 1048 23 1046  !

8 1047 24 1047 9 1046 25 1043 l 10 1048 26 1043 J 11 1043 27 1042 12 1044 28 1043 ,

13- 1044 29 1041 i l

14 1045 30 1042 j 15 1043 31 16 1046 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, i

ZCLERK-6

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-304 UNIT Z1on Unit 2 DATE 12/13/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 November ~ 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -11 17 -12 2 -12 18 -12 3 -12 19 -12 4 -12 20 -12 5 -12 21 -12 6 -12 22 -12 7 -12 23 -12 8 -12 24 -12 9 -12 25 -12 10 -12 26 -12 11 -12 27 -12 12 -12 28 -12 l 13 -12 29 -12 14 -12 30 -12 15 -12 31 16 -12 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the l reporting month. Compute to the nearest whole megawatt.

l l

l ZCLERK-7 l

_ _ . . _ __ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ _ . _ _ . _ . _ . _ . . _ _ _ - _ _ _ . . . _ _ _ . _ . ~ . . . _ _ . _ . . _ _ .

! November 1996 1

SUMMARY

OF OPERATING EXPERIENCE i

l I t

i UNIT 1 i l

l Unit 1 began November on-line at 1075 MWe power level (99.4% reactor power). Unit 1 remained on line for the entire reporting period. Unit I concluded the j j reporting period at 1085 MWe power level (99.8% reactor power) and with an l availability factor of 100.0% for the month of November.  ;

UNIT 2 Unit 2 began November off-line for a continuation of refueling outage (Z2R14).

Unit 2 is scheduled to be back on-line on December 25. 1996.

1 1

i l

I l

[ i a

i a

t I ZCLERK ! . _ _ _

. . 1 l

i  !

t Noveraber 1996  ;

MAJOR MAINTENANCE  !

l EQUIPMENT NAME WORK PERFORMED '

l (UNIT 1) l OB FP Battery # 1 & #2 >

Completed 005: 11/04/96 - 11/05/96 ,

1B CW PP Replace Exciter Fuses, Clean & Inspect Cabinet Completed ,

005: 11/19/96 - 11/30/96  !

1A AFW PP Surveillance, Valve Lubrication. Inspection Completed 005: 11/22/96 - 11/29/96 1B FW PP 1A Oil Pump Bearing Pressure Completed 00S: 11/15/96 - 11/26/96 i

\

4 i COMMENT:

l i

ZCLERK-9 ll .

i

. j November 1996 ,

MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED l

(UNIT 2) '

i 2B C/CB PP Perform PM/ Change Lubrication j 005: 07/30/96

  • 3 1

2A 1A Comp Compressor Replacement  !

005: 07/14/96

  • I l

l COMMENT:

  • No return to service date.

ZCLERK-10

_ __ - . _ _ . _ _ ___ __ . _ _ _ _ ._ m_ ___

l REFUELING INFORMATION REQUEST QUESTIONS-

1. Name of facility.
2. Scheduled date for next refueling shutdown. '
3. Scheduled date for restart following refueling. ,
4. Will refueling or resumption of operation thereafter require a technical i

, specification change or other license amendment?- i If answer is yes, what, in general, will these be?

l If answer is no has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

! 5. Scheduled date(s) for submitting proposed licensing action and supporting information.

6. Important licensing considerations associated with refueling. e.g., new or different fuel design or supplier unreviewed design or performance analysis methods, significant changes in fuel design new operating procedures.
7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in the number of fuel assemblies.
9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

1 Page 1 of 3 ZCLERK-11 4

9 REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS:

1

1. Zion Unit 1.
2. Cycle 15 is scheduled to shutdown April 5.1997 for refueling. l
3. Cycle 16 is scheduled to start up May 25, 1997.
4. The following License Amendments are required to allow resumption of operation after Refueling Outage Z1R15.

I e Increase Steam Generator plugging limit. Required to ensure Unit derating will not be required based on Steam Generator plugging.  ;

The Reload Safety Analysis for cycle 16 will be completed during Z1R15. l

5. Projected submittal of License Amendment is January, 1997. j
6. Not applicable.
7. The number of fuel assemblies (3) in the core is 193. and (b) in the spent fuel storage pool from Zion Unit 1 is 932. ]
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit
2) is 3012 fuel assemblies. Of these 3012 storage locations. 11 are unavailable and 239 are inaccessible pending completion of the Offset Tool ,

l Modification (M22-90-0-008A. C).

l l 9. The projected date of the last refueling than can be discharged to the spent i

fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22-90-0-008A. C) will be installed prior to June 2003. This

, projected date is subject to change based on outage durations or Overhaul l Schedule changes.

i l

I 2 of 3 ZCLERK-12

. \

l REFUELING INFORMATION REQUEST l l l l

UNIT 2 - ANSWERS:

)

l

1. Zion Unit 2.
2. Cycle 14 is scheduled to shutdown September 19, 1996 for refueling.
3. Cycle 15 1s scheduled to start up December 25, 1996.

l 4. The following outstanding License Amendment Requests are required for i l startup of Unit 2 following Refueling Outage Z2R14. l i

e PTLR Amendment - in NRC review. l

5. There are no outstanding proposed License Amendments required for startup l l from Z2R14. l l
6. New fuel reloaded into Unit 2 Cycle 15 core will incorporate the following design changes:

0 Selected standard Integral Fuel Burnable Absorber (IFBA) patterns have been updated following a Westinghouse Core Engineering investigation of peripheral IFBA rod loading within the fuel assembly. The net

effect of this change is to achieve the most efficient absorber l orientation at Beginning of Life (BOL) and for burnups through 5000 MWD /MTU. These patterns provide self-limiting features that mitigate the extent of DNB propagation. In addition, these IFBA patterns provide significant peaking factor and reactivity holddown benefits.

l e IFBA rods will have a nominal B-10 enrichment loading with a reduction l in backfill pressure from 200 to 100 psig. The nominal B-10 loading is 1.77 mg/ inch. Rod internal gas pressure has an effect on two of the fuel rod design criteria that are evaluated for the reload: Rod l internal pressure and clad stress criteria. The Zion Unit 2 Cycle l

Specific fuel design analysis has been performed and has demonstrated that the design criteria were met.

7. The number of fuel assemblies (a) in the core is 193 and (b) in the spent fuel storage pool from Zion Unit 2 is 984.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit
2) is 3012 fuel assemblies. Of these 3012 storage locations.11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A, C).
9. The projected date of the last refueling that can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22-90-0-00BA C) will be installed prior to June 2003. This projected date is subject to change based on outage durations or Overhaul Schedule changes.

3 of 3 I