Commnnwrith Edison Zion Generating Station 101 Shiloh Blvd.
Zon, Illinois 60099 Telephone 708 / 746-2084 P
September 10. 1993-ZAD-93-009 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
Attached is the August 1993 Operating Status Report.
kWfhw(
E. A. Broccolo-Station Manager Zion Station TPJ/jlc Enclosure cc:
Regulatory Assurance USNRC Document Control M. Wallace J. Martin (NRC)
T. Rieck D. Farrar j
D. R. Eggett INPO Div. of Enforcement Health State of Illinois F. Yost NRC Inspector. Zion Operating Engrs.
1 C. Y. Shiraki - Fax l
Master file 4
I i
I ZCLERK-5 (1) 9309230142 930832
})i
(/
PDR ADOCK 05000295 t ai R
PDR L)
-)
OPERATING DATA REPORT DOCKET NO.
50-295 DATE 09/10/93 COMPLETED BY J. Cyaan TELEPHONE (708)746-2084 i
X3169 1
OPERATING STATUS i"
1.
Unit Name:
Zion Unit 1 2.
Reporting Period: 0000 080193 to 2400 083193 Notes i
3.
Licensed Thermal Power (MWt):
3250
'i
~
4.
Nameplate Rating (Gross MWe):
1085 5.
Design Electrical Rating (Net MWe):,
1040 6.
Maximum Dependable Capacity (Gross MWe): 1085 1
7.
Maximum Dependable Capacity (Net MWe):
1040 f
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted. If Any (Net MWe):
N/A l
10.
Reasons For Restrictions. If Any:
N/A l
This Month Yr-to-Date Cumulative.
~
11.
Hours in Reporting Period 744.0 5.831.0 172.415.0 f
12.
Number Of Hours Reactor Was Critical 744.0 5.785.3 118.217.8 d
13.
Reactor Reserve Shutdown Hours 0.0 0.0 2.621.8
.14.
Hours Generator On-Line 744.0 5.766.6 114.722.7 15.
Unit Reserve Shutdown Hours 0.0 0.0-0.0 y
16.
Gross Thermal Energy Generated (MWH) 2.398.035.0 18.304.902.0-335.038.193 17.
Gross Electrical Energy Generated (MWH) 799.963 0 6.128.645.0 108.692.659 18.
Net Electrical Energy Generated-(MWH) _
770.045.0 5.902.961.0
-103.428.555 19.
Unit Service Factor 100.0 98.9 66.5-20.
Unit Availability Factor 100.0 98.9 66.5 -
i 21.
Unit Capacity Factor (Using MDC Net) 99.5 97.3
- 57. 7 '
22.
Unit Capacity Factor (Using DER Net) 99.5 97.3 57.7 23.
Unit Forced Outage Rate 0.0 1 :1 13.2 l
24.
Shutdowns Scheduled Over Next 6 Months-(Type. Date.,and Duration of Each):
i Scheduled Shutdown for Refuelino Outaae 10/21/93.
Startuo scheduled for 3/31/94 25.
If' Shut Down At End Of Report Period. Estimated Date of Startup:
i 26, Units in Test Status (Prior to Comr.ercial Operation):
Forecast Achieved _
. INITIAL CRITICALITY
)
INITIAL ELECTRICITY j
COMMERCIAL OPERATION 1
i l
- l ZCLERK-5 (2) 1
~
i
'f OPERATING DATA REPORT DOCKET NO._
50-295 DATE 09/10/93 COMPLETED BY J. Cyaan TELEPHONE (708)746-2084 l
X3169 OPERATING STATUS l
l i
1.
Unit Name:
Zion Unit 2 2.
Reporting Period: 0000 080193 to 2400 083193 Notes i
3.
Licensed Thermal Power (MWt):
3250 4.
Nameplate Rating (Gross MWe):
1085 i
5.
Design Electrical Rating (Net MWe):
1040 6.
Maximum Dependable Capacity (Gross MWe):
1085
?
7.
Maximum Dependable Capacity (Net MWe):
1040 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A c
9.
Power Level To Which Restricted. If Any (Net MWe):
N/A 10.
Reasons For Restrictions. If Any:
N/A This Month Yr-to-Date Cumulative
'[
11.
Hours In Reporting Period 744.0 5.831.0 166.128.0 12.
Number Of Hours Reactor Was Critical 744.0 4.562.6 119.100.3
.1 13.
Reactor Reserve Shutdown Hours 0.0 0.0 226.1 14.
Hours' Generator On-Line 744.0 4.562.6 116.141.6 l
15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
~
16.
Gross Thermal Energy Generated (MWH) 2.295.533.0 13.738.143.0-344.430.483 17.
Gross Electrical Energy Generated (MWH) 767.938.0 4.604.297.0 110.772;232 l
18.
Net Electrical Energy Generated (MWH) 739.046.0 4.424.187.0 105.534.851
.l 19.
Unit Service Factor 100.0 78.2 69.9 l
20.
Unit Availability Factor 100.0 78.-2 69.9 21.
Unit Capacity Factor (Using MDC Net) 95.5 73.0 61.1 22.
Unit Capacity Factor (Using DER Net)
-95.5 73.0 61'.1 23.
-Unit Forced Outage Rate 0,0 0.0 15.1 l
24,
-Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each),
Scheduled Shutdown for Service Water Outace 10/7/93.
Startuo scheduled for 3/8/94.
-i 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test. Status (Prior to Commercial Operation):
Forecast Achieved
- l INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL OPERATION
.I ZCLERK-5 (3)
..,n.
~. - --
.I
UNIT SHUTDOWNS AND POWER REDUCTIONS-
. DOCKET NO. 50-295 UNIT NAME Zion Unit 1 DATE 09/10/93 COMPLETED BY J. CYQan TELEPHONE (708) 746-2084 x3169 REPORT MONTH AUGUST 1993 1
Duration 2
Method of Licensee System Component Cause & Corrective No.
Date.
Type (Hours)
Reason Shutting Event Code 4 Code 5 Action to Down 3 Report #
Prevent Recurrence Reactor On-Line for the entire reporting period.
7 1
2 3
4 F: Forced Reason:
Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File
+
D-Regulatory Restriction 4-Continued (NUREG 0161)
E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source H-Other (Explain)
ZCLERK-5'(4)-
.__---_.-..._.._..____.___.____..__._._.u.__,...;_..._._._
. ~
UNIT SHUTDOWNS NJD F0WER REDUCTIONS DOCKET NO 50-304 UNIT NAME Zion Unit 2-DATE 09/10/93 COMPLETED BY J. Cyaan TELEPHONE'(708) 746-2084 x3169 REPORT MGNfH AUGUST 1993 Duration 2
Method of Licensee System. Component Cause & Corrective No..
Date.
Type (Hours)
Reason Shutting Event Code 4 Code 5 Action to Down 3 Report #
Prevent Recurrence-Reactor On-line for the entire reporting period.
1:
2 3
4 Method Exhibit G - In.structions F: Forced ReasonhmentFailure(Explain)
S: Scheduled A-Equi 1-Manual Entry Sheets for Licensee for Preparation of Data B-Maintenance or Test ~
2-Manual Trip C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatcry Restriction
.4-Continued (NUREG-0161) l~
E-Operator. Training & Licensee Examination 5-Reducad Load i-F-Administrative-5 G-Operational Error (Explain)-
Exhibit'l -'Same Source H-Other (Explain)
I' r
- ZCLERK-5 (5)
. =.= -..-...-._.-...... -. a - ----.=...:.-.,....-.-.-....-_..-.--...-.-_..-...-.---
c-AVERAGE DAILY UNIT POWER LEVEL l
DOCKET N0. 50-295-UNIT Zion Unit 1 DATE 09/10/93 COMPLETED BY J. Cvoan
_ TELEPHONE-(708) 746-2084 x3169 i
MONTH AUGUST 1993 DAY.
AVERAGE DAILY POWER LEVEL DAY -AVERAGE' DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i 1
1.043 17 1.040 2
1.044 18 1.035 i l 3-1.047
. 19
-1.039 l
l 4
1.032 20 1.034 i
5 1.04^
21 1.031 l
6 1.042 22 1.033 7
1.024 23' 1.040 1
8 947 24 1.025 t
9 1.042 25 1.040 10 1.042 26 1.041
.l
-l 11 1.044 27 1.042 3
12 1.045 28 1.041 13 1.031 29 1.022 14 1.039 30 1.037 1
15 1.041 31 1.036
-q 16 1.042 1
4 INSTRUCTIONS j
Dn this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
ZCLERK 5 (6)
I
-*r*
-w
[e w
y y
N,
)
~l
' 's AVERAGE DAILY UNIT POWER LEVEL
'I
' DOCKET NO. 50'-304-
-l UNIT Zion Unit 2' DATE 09/10/93 COMPLETED BY J. Cyoan
- i TELEPHONE _[708) 746-2084 x3169
.i MONTH AUGUST 1993 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) j 1-994 17 1.038
- i 2
938 18 1.022
- t 3'
1.022 19 1.022 4
910 20 1.015
]
5 963 21 1.004
-l 6
973 22 =
950 7
899 23 1.003 l
8 916 24 1.045 9
932 25 1.012 I
1 10 964
.26
').035 11 1.034 27 1.047 12 1.039-28 1.017
-i
- i 13 1.045 29 933 14 1.028 30 989 15 955 31 1.035 16-1.017 l
. INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
H 9
i
' ZCLERK-5' D)--
A
1
~ :
l 1.-
t AUGUST 1993
SUMMARY
OF OPERATING EXPERIENCE
-l 1.
y L
j 4
i UNIT 1 j
1:
Unit 1. began August at 1093 MWe power level (100% reactor power). There were i
I.
no load Reductions or Unit shutdowns during the month of August. Unit I was i
continuously on line for 51 days on 8/31/93. The Unit concluded the reporting period at 1089 MWe power level (100% reactor power).
]
i l
UNIT 2 i
i i
Unit 2. began August at 1091 MWe power level (99.6% reactor power). There i
were no Load Reductions or Unit shutdowns during the month of August. Unit 2 l
was continuously on line for 187 days on 8/31/93. The Unit concluded the reporting period at 1092 MWe power level (99.3% reactor power).
4 i
.g i
I i
j.
?
e i-l 3
i j
4 t
-l i
j i
l' l
l 6
5' i
t h
ZCLERK-5 (8).
.. ~
i AUGUST 1993 MAJOR SAFETY PELATED MAINTENANCE l
Eauipment Name Work Performed (UNIT 1) 1A IA Comp Major Overhaul:
005: 6/29/93 1B Charg. Pp Pre Outage PM Work:
Work completed 005: 8/02/93 - 8/05/93 1A Charg. PP Pre Outage PM Work:
Work completed 005: 9/09/93 - 8/12/93
'O' Pp Air Comp Preventive Maintenance:
Work completed 005: 8/09/93 - 8/16/93 1C CS Pp Repair Fuel Leaks:
Fuel Leaks repaired 005: 8/13/93 - 8/14/93 IB RHR Pp Scheduled EQ Inspection:
Work completed DOS: 8/15/93 - 8/17/93 OD CC Pp Scheduled Mod work:
Vent Mod completed 005: 8/16/93 - 8/29/93
- 1 Pp Air Comp Preventive Maintenance:
PM work completed 005: 8/17/93 - 8/23/93 1A D/G Turbocharger replacement:
Work completed 005. 8/19/93 - 8/20/93 1A RHR Pp Scheduled PM work:
Work completed 005: 8/23/93 - 8/28/93 1C SW Pp Lube Oil Cooler Inspection:
Work completed 005: 8/23/93 - C/27/93 DE CC Pp Seal Line Mod:
005: 8/30/93 COMMENT (S):
1 A 1 A Comp RCD is under review OE CC Pp Expected RSD 9/01/93 2 CLERK-5 (9)
?i i
AUGUST-1993 MAJOR SAFETY RELATED MAINTENANCE
[gufoment Name Work Performed
-(UNIT 2)
- 3 2C Hdr Pp Major Overhaul:
005: 5/17/93
- ~
l 2B CD Pp Major Overhaul:
005: 7/28/93
Adjustment not made Deferred to 2R13 005: 8/11/93 - 8/11/93 L
l g
i l
i i
5
-i';
COMMENT (S):
2C Hdr Pp- -scheduled RTS 3/30/94' 2B CD Pp
. scheduled RTS 9/07/93
[:
LZCLERK-5-(10)
5 REFUELING _INFORMATION REQUEST j
Que'stions:
1.
Name of facility.
j 2.
Scheduled date for next refueling shutdown.
3.
Scheduled date for restart following refueling.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what in general. Will these be?
i If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any
- l unreviewed safety questions are associated with the core reload (Ref.
10 CFR Section 50.59)?
4 If no such review has taken place, when is it scheduled?
5.
Scheduled date(s) for submitting proposed licensing action and i
supporting information.
t 6.
Important licensing considerations associated with refueling, e. g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
7.
The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
l I
)
f b
I i
^
f i
. i 3
I Page 1 of 3
- ZCLERK-5 (11) 4
,e
.m.
- ... -..... -. -. -... -. -. -. -. ~. - -. -. - -
J 1
a o
Unit 1 - Answers
.l.
Zion Unit 1 i
4 2.
Cycle 13 is scheduled to shutdown October 21, 1993'for refueling.
3.
Cycle 14 is scheduled to start up March 31, 1994.
j 4.
Yes. Neutron Flux - NIS Instrumentation unit change per Gamma Metrics l
Mod. Onsite Review completed 4/8/93 submitted 4/21/93, approval expected by 10/21/93.
1 l
j 5.
Not applicable or none proposed.
6.
Not applicable.
o 7.
The number of fuel assemblies l
a) in the core is 193. and j.
b) in the spent fuel storage pocl from Zion Unit 1 is 784.
-l t
i 8.
The present licensed spent fuel pool storage capacity (shared with Zfcc j-Unit 2) is 3012 fuel assemblies (only 2762 locations will be accessible).
9.
Zion Station will lose dual full core discharge capability in November i
2001, at the beginning of Unit 1 Cycle 19, based on the-latest Nuclear Stations Refueling Schedule. Full core discharge capability for a i
single core will be lost in May 2003, at the beginning of Unit 1 Cycle 20.
j V
1 a.
t i
i.
I.
t
.l i-1-
i:
I l
4.
l 4
4 Page 2 of 3 i
2 CLERK-5 (12)
=..a.,_2.-.-
.]
2 i
.1 i
Unit 2 - Answers
(
~
- 1 1.
Zion Unit 2 2.
Cycle 13 is scheduled to shutdown January 5,1995.for refueling.
3.
Cycle 14 is scheduled to start up March 22. 1995.
4.
Yes. Neutron Flux - NIS Instrumentation unit change per Ganma Metrics i
Mod. Onsite Review completed 4/8/93. submitted 4/21/93. approval expected by 10/21/93.
5.
Not applicable or none proposed.
6.
flot applicable.
l t
i 7.
The number of fuel assemblies a) in the core is 193. and i
b) in the spent fuel storage pool from Zion Unit 2 is 824.
8.
The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 3012 fuel assemblies (only 2762 locations will be-accessible).
j I
9.
Zion Station will lose dual full core discharge capability in' November 2001, at the beginning of Unit 1 Cycle 19 based on the latest' Nuclear Stations Refueling Schedule. Full core discharge capability for a i
single core will be lost in May 2003, at the beginning of Unit 1 Cycle i
20.
i l
j i
I Page 3 of 3
~
ZCLERK-5 (13) q
~l
4 i
ADDENDUM TO ZION STATION MONTHLY REPORT n
l j
Special Report submitted in accordance with Zion Tech Spec.. Surv. 4.15.1.B.5 This repcrt addresses one invalid failure of the 1A EDG. The criteria to determine
~
6 valid tests is in accordance with Section C.2 e of Reg. Guide 1.108.
On August 20, 1993 at 1737 the 1A EDG was secured during PT-L1 due to erratic-voltage control. Investigation by the system engineer revea'ted a dirty voltage adjust potentiometer. The potentiometer was cleaned and verified to be operating-smoothly. The EDG was returned to service August 21.1993 at 0146 following a successful PT-11. Additional corrective measures are being evaluated. This failure-l was determined to be invalid per R.G. 1.108. The 1A EDG was unavailable for approximately 08:09 hours during the course of this event.
l The test frequency for 1A EDG is 31 days.