1 Zion Generating Station l 101 Shiloh Blvd.

Zion, Illinois 60o99 <

Telephone 708 / 746-2084 ]

l February 14, 1996 ZAD-96 002 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

Attached is the January Operating Status Report.

NAZh>

G. K. Schwa Station Man >r Zion Station GKS/jlc Enclosure cc: Regulatory Assurance USNRC Dorument Control M. Wallace H. Miller (NRC)

D. Farrar D. R. Eggett INPO Div. of Enforcement Health i State of Illinois /IDNS F. Yost NRC Inspector. Zion IDNS Inspector. Zion Operating Engrs. ,

C. Y. Shiraki - Fax I Master File i 9602220073 960131 PDR ADOCK 05000295 R PDR 220025 ,

ZCLERK-(1) NNii ,

f -'

OPERATING DATA REPORT DOCKET N0. 50-295 DATE 2/14/96 COMPLETED BY J. CYGAN TELEPHONE (708)746-2084 X3169 OPERATING STATUS

1. Unit Name: Zion Unit 1
2. Reporting Period: 0000 010196 to 2400 013196 Notes
3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): 1040 l
6. Maximum Dependable Capacity (Gross MWe): _1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last l Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. dours in Reporting Period 744.0 744.0 193.608.0
12. Number Of Hours Reactor Was Critical 744.0_ 744.0 130.782.9 j 0.0 2.612.8
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.7 744.0 127.141.2
15. Unit Reserve Shutdown Hours 0.0 0.0 3.0
16. Gross Thermal Energy Generated (MWH) 2.406.999.0 2.406.999.0 374.102.596
17. Gross Electrical Energy Generated (MWH) 805.135.0 805.135.0 121.711.208 l
18. Net Electrical Energy Generated (MWH) 770.617.0 770.617.0 115.933.569
19. Unit Service Factor 100.0 100.0 65.7
20. Unit Availability Factor 100.0 100.0 -65.7
21. Unit Capacity Factor (Using MDC Net) 99.6 99.6 57.6 i
22. Unit Capacity Factor (Using DER Net) 99.6 99.6 57.6 I
23. Unit Forced Outage Rate 0.0 0.0 16.1 l
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): 1 l
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i

~ZCLERK-(2)

? '

I OPERATING DATA REPORT DOCKET NO. 50-304 DATE 2/14/96 COMPLETED BY J. CYGAN  ;

TELEPHONE (708)746-2084 X3169 ,

OPERATINGSTATl).S

1. Unit Name: Zion Unit 2 ,
2. Reporting Period: 0000 010196 to 2400 013196 Notes
3. Licensed Thermal Power (MWt): 3250

+

4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): 1040
6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 744,0 744.0 187.321.0
12. Number Of Hours Reactor Was Critical 357.1 357.) __ 132.889.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 226.1.
14. Hours Generator On-Line 289.8 289.8 129.700.0 15 Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 631.745.0 631.745.0 385.647.636
17. Gross Electrical Energy Generated (MWH) 203.296.0 203.296.0 124.459.600
18. Net Electrical Energy Generated (MWH) 188.123.0 188.123.0 118.664.853
19. Unit Service Factor 39.0 39.0 69.2
20. Unit Availability Factor 39.0 39 0 69.2
21. Unit Capacity Factor (Using MDC Net) 24.3 24.3 60.9,
22. Unit Capacity Factor (Using DER Net) 24.3 24.3 60.9
23. Unit Forced Outage Rate 0.0 0.0 13.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Planned Outaae Z2P04 January 13. 1996 to January 27. 1996 (14 Days)

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-(3)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-295 UNIT NAME Zion Unit 1 -

DATE 2/14/96 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169..

REPORT MONTH January 1996 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor Unit Was On-line For The Entire Reporting Period 1 2 3 4 F: Forced Recson: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenence or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Sou ce H-Other (Explain)

ZCLERK-(4)

UNIT SHUTDOWNS AND PDWER REDUCTIONS DOCKET NO. 50-304 ~

UNIT NAME Zion Unit 2 DATE 2/14/96 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169 .

REPORT MONTH January 1996 1 Duration 2 Method of Licensee System Component Cause & Corrective i No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor 12 1/01/96 S 168.0 B 5 Continuation Of Unit 2 At less Than 50%

Power To Prepare To Isolate The Condenser NE waterbox 1 1713/96 S 357.8 B 1 Unit 2 Went Off-line For Condenser Tube Repairs (Z2P02) And Stayed Off-line For The Rest Of The Reporting Period 1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling. 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

ZCLERK-(5)

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-295 UNIT Zion Unit 1

'=o DATE 2/14/96 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169 MONTH January 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1033 17 1040 2 1038 18 1040 3 1037 19 1040 4 1040 20 1040 5 1041 21 1041 6 1041 22 1032 7 1041 23 LO23 8 1043 24 1026 9 1046 25 1027 10 1046 26 1026 11 1046 27 1025 12 1046 28 1025 13 1035 29 1024 I

14 2019 30 1026 '

15 103E 31 1025 16 1041 1

INSTRUCTIONS l On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

ZCLERK-(6) l

._____-____a

.' .. r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-304

' UNIT Zion Unit 2 DATE 2/14/96 COMPLETED BY J. CYGAN 1 TELEPHONE (708) 746-2084 x3169 MONTH January 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 466 17 -12 2 465 18 -12

'3 466 19 -12 4 464 20 -12 5 464 21 -12 6 449 22 -13 7 436 23 -13 8 834 24 -13 9 974 25 -13 10 1040 26 13 11 1044 27 -13 12 967 28 -13 l

13 -4 29 -13 14 -12 30 -13 15 -12 31 -13 __

16 -12 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

ZCLERK-(7)

1

. I e ,

\

)

1 January 1996 i

SUMMARY

OF OPERATING EXPERIENCE UNIT 1 Unit 1 began January on-line at 1088 MWe power level (100% reactor power) and remained on-line for the month.

Unit 1 concluded the reporting period at 1093 MWe power level (100% reactor power) and with an availability factor of 100% for the month of January.

i l

l j)_NTT2 )

Unit 2 began January on-line at 501 MWe power level (49% reactor power).

l Unit 2 had been at less than 50% power to prepare to isolate the condenser northeast waterbox since December 27, 1995, On January 13,1996 at 0200 the reacts r was manually tripped for scheduled outage Z2P04 for repairs on the Main Condenser tube leaks.

Unit 2 remained off-line for the rest of the reporting per,iod and had a 39%

~

availability factor for the month of January.

l I

ZCLERK-(8) i

.. ? ,

Jary 1996 M W MAlHTENANCE EQUIPMENT NAME . WORK PERFORMED (UNIT 1)

IC CW PP Repair Clogged Piping to Motor Cooler i

Completed 005: 01/02/96 - 01/04/96  ;

IC.CW PP Repair Clogged Piping to RG Work Completed 005: 01/04/96 - 01/11/96 1C MFW PP Lovejoy System Recalibration .

Com leted 005 01/05/96 - 01/05/96 1A MFW PP Breaker Repair Completed 005: 01/04/96 - 01/05/96 OD CC PP Breaker Overhaul l Completed 005: 01/09/96 - 01/11/96 OB FIRE.PP Window Work (Misc)

Completed j 00S: 03/15/96 - 01/27/96 1C HD PP Grease Fittings Lube / Filter /

Disassemble Motor Completed 005: 01/20/96 - 01/24/96 1A SI PP Recirc Flow Low

, Completed 005: 01/25/96 - 01/26/96 1C CW PP PP Tripped / Investigate / Troubleshoot Completed 005: 01/27/96 - 01/27/96 COMMENT:

l

.ZCLERK-(9): -

. . . \

I

.. ~

l January 1996 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 2)-

2A C/CB PP Speed Increaser Repair Completed 00S: 12/10/95 -

  • U2 Condenser Condenser Tubes Repairs Completed i 00S: 01/06/96 - 01/07/96' 2A HD pp Window Work Overhaul / Clean / Inspect Completed 005: 01/11/96 - 01/11/96 2A AFW PP Window Work Lubricate / Clean / Inspect Completed 00S: 01/09/96 - 01/12/96 2B SW PP Breaker Overhaul Completed 005: 01/09/96 - 01/12/96 2B AFW PP Window Work Lubricate / Clean / Inspect Completed 005: 01/16/96 - 01/18/96 2A MFW PP Breaker Overhaul / Change Lube Completed DOS: 01/21/96 - 01/27/96 COMMENT: No Return To .ervice Date J

l 1

ZCLERK-(10)

I

4' 1

REFUEL!NG INFORMATION REQUEST

. 0UESTIONS:

1, Name of facility.  :

2. Scheduled date for next refueling shutdown.

.3. Scheduled date for restart following refueling.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer.is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety uestions are associated with the core reload (Ref. 10 CFR Section 50,59) l If no such review has taken place, when is it scheduled?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

Important licensing considerations associated with refueling, e.g.. new 6.

or different fuel design or supplier, unreviewed design or performance i analysis methods, significant changes in fuel design, new operating i procedures. J l

7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel i storage pool.
8. The present licensed spent fuel pool storage capacity and the size of any 1 increase in licensed storage capacity that has been requested or is  !

planned, in the number of fuel assemblies. ]

9. The projected date of the-last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

Page 1 of 3 ZCLERK-(11)-

REFUELING INFORMATION REQUEST v

UNIT 1 - ANSWERS:

1. Zion Unit 1.
2. Cycle 15 is scheduled to shutdown March 8, 1997 for refueling.
3. Cycle 16 is scheduled to start up April 25, 1997.
4. No, there are no identified License Amendments required to allow resumption of operation after Refueling Outage Z1R15.

The Reload Safety Analysis for cycle 16 will be completed during Z1R15.

5, Not applicable.

6. Not applicable.
7. The number of fuel assemblies (a) in the core is 193, and (b) in the spent fuel storage pool from Zion Unit 1 is 932.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 3012 fuel assemblies (only 2762 locations will be accessible).
9. Zion Station will lose dual full core discharge capability in December 2001, at the beginning of Unit 1 Cycle 19, based on the latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single i core will be lost in May 2003, at the beginning of Unit 1 Cycle 20.

These projections are based on the current number of available storage cells in the spent fuel pool and does not include the use of the offset tool.

2 of 3 1-ZCLERK-(12)

j;f- ,,

REFUELING INFORMATION REQUEST TUNTT2-ANSWERSi

1. ' Zion Unit 2.
2. Cycle 14 is scheduled to shutdown September 7,1996 for refueling.
3. Cycle _15 is scheduled to start up December 3, 1996.

4 .' No. There are no outstanding License Amendment Requests required for-startup of Unit 2 following Refueling Outage Z2R14.

5. There are no. outstanding proposed License Amendments required for startup from Z2R14. This item is not applicable.  ;
6. Not applicable.
7. The number of fuel assemblies (a) in the core is 193, and (b) in the spent fuel storage pool from Zion Unit 2 is 908,
8. The present licensed spent fuel pool storage capacity (shared with. Zion Unit 1) is 3012 fuel assemblies (only 2762 locations will be accessible).
9. Zion Station will lose dual full core discharge capability in December 2001, at the beginning of Unit 1 Cycle 19, based on the latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single core will be lost in May 2003, at the beginning of Unit 1 Cycle 20.

These projections are based on the curre " number of available storage i cells in the spent fuel pool and does not include the use of tne offset l tool ,