I Commonwealth I.dison Contpany f Zion Generating Station e' 101 Shiloh ikiulevard Zion,11. 60099-2797 l Tel 817-7W20M l g

l November 13. 1996 i Nuclear Regulatory Commission 1 Document Control Desk '

Washington, DC 20555  !

I

Dear Sir:

Attached is the October Operating Status Report.

i M G. K. Schwartz '

Station Manag 1 Zion Station ,

i GKS/jlc Enclosure cc: Regulatory Assurance USNRC Document Control  :

H. Keiser j W. Beach (NRC)  :

D. Farrar  !

D. R. Eggett l INPO 4 Div. of Enforcement Health State of Illinois /IDNS F. Yost NRC Inspector Zion l IDNS Inspector, Zion  ;

Operating Engrs. '

C. Y. Shiraki Master File l

f 9611190297 961031

/&L'l1

'/

I PDR ADOCK 05000295 R PDR ,

ZCLERK.-1

.u nicom conyun>

.0 OPERATING DATA REPORT DOCKET N0. 50-295 DATE 11/13/96 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 OPERATING STATUS

1. Unit Name: Zion Unit 1
2. Reporting Period: 0000 100196 to 2400 103196 Notes
3. Licensed Thermal Power (MWt): 3250 4 Nameplate Rating (Gross MWe)_: 1085
5. Design Electrical Rating (Net MWe): 1040
6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 745.0* 7.320.0 200.184.0
12. Number Of Hours Reactor Was Critical 745.0 6.000.1 136.039.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 2.612.8
14. Hours Generator On-Line 745.0 - 5.704.7 132.101.9 15 ._ Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2.407.723.0 18.138.634.0 389.834.231
17. Gross Electrical Energy Generated (MWH) 801.368.0 6.049.992.0 126.956.065 ,
18. Net Electrical Energy Generated (MWH) 777.415.0 5.807.288.0 120.970.240 j
19. Unit Service Factor 100.0 77.9 66.0 l
20. Unit Availability Factor 100.0 77.9 66.0
21. Unit Capacity Factor (Using MDC Net) 100.3 76.3 58.1
22. Unit Capacity Factor (Using DER Net) 100.3 76.3 58.1 j
23. Unit Forced Outage Rate 56.9 14.5 16.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
  • Add I hour for time change.

ZCLERK-2

- , - - . . - . . - - - = -.-

d OPERATING DATA REPORT DOCKET NO. 50-304 DATE 11/13/96 COMPLETED BY J. CYGAN l

TELEPHONE (847)746-2084

-X3169 OPERATING STATUS 1 E 1. Unit Name: Zion Unit 2 l

2. Reporting Period: 0000 100196 to 2400 103196 Notes

, 3. Licensed Thermal Power (MWt): 3250 _

.4.

Nameplate Rating (Gross MWe): 1085

5. Design Electrical Rating (Net MWe): 1040
6. Maximum Dependable Capacity (Gross MWe): 1085 l
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: N/A
9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A

! This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 745.0
  • 7.320.0 193.897.0 l
12. Number Of Hours Reactor Was Critical 00.0 5.846.4 138.378.7 l
13. Reactor Reserve Shutdown Hours 00.0 0.0 226.1
14. Hours Generator On-Line 00.0 5.688.6 135.098.8
15. Unit Reserve Shutdown Hours 00.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 00.0 17.63).458.0 402.647.369
17. Gross Electrical Energy Generated (MWH) 00.0 5.846.647.0 130.102.951
18. Net Electrical Energy Generated (MWH) 00.0 5.618.358.0 124.095.088
19. Unit Service Factor 00.0 77.7 69.7
20. Unit Availability Factor .

00.0 77.7 69.7 l 21. Unit Capacity Factor (Using MDC Net) 00.0 73 7 61.5

22. Unit Capacity Factor (Using DER Net) 00.0 73.7 61.5
23. Unit Forced Outage Rate 00.0 1.3 13.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

1 Refuelino Outaae (Z2R14) Startina Seotember 19. 1996 and Lastina 58 days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

L -26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved l

l INITIAL CRITICALITY

. INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Add 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.for time change.

l i

ZCLERK-3 L

s .

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-295 UNIT NAME Zion Unit 1 -

DATE 11/13/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH October 1996 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor I

Unit 1. Remained On Line For The Entire <

Month Of October.

l t

1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 2-Manual Trip Entry Sheets for Licensee B-Maintenance or Test C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load '

F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source ,

H-Other (Explain)

ZCLERK-4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-304 -

UNIT NAME Zion Unit 2 DATE 11/13/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH October 1996 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence i Reactor 7 10/01/96 S *745.0 C 1 Unit 2 Remained Off-Line For The Entire Month Of October For Refueling Outage Z2R14.

i i

i 1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

  • 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> added for time change ZCLERK-5

. . _ - - - - _ _ _ _ . _ - . - - - - - . _ - _ _ . _ . - . . - . _ , - - _ _ a- ,

AVERAGE DAILY UNIT POWER LEVEL

' DOCKET NO. 50-295 UNIT Zion Unit 1 DATE 11/13/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 MONTH October 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

. (MWe-Net) (MWe-Net) t 1 1041 17 1043 l 2 1042 18 1044 3 1043 19 1043 4 1041 20 1046 5 1041 21 1043 6 1047 22 _ 1044

7. 1043 23 1047 8 1045 24 1045 l

9 1044 25 1043 10 1042 26- 1045

'll 1041 27 1088 I i

l 12 1043 28 1040 'I 13 1044 29 1041 '

14 1045 30 1045 i 15 '1045 31 1046 16 1043 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. .

1 ZCLERK-6

AVERAGE DAILY' UNIT POWER LEVEL DOCKET NO. 50-304

. UNIT Zion Unit 2 DATE 11/13/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 October- 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 -12 17 -12 2 -12 18 -12 3 -12 19 -12

-4 -12 20 -12 5 -12 21 -12 6 -11 22 -12 7 -12 23 -12 8 -12 24 -12 9 -12 25 -12 10 -12 26 -12 11 -12 27 -12 12 -12 28 -12 13 -12 29 -12 14 -12 30 -11 15 -12 31 _. -11 16 -12 INSTRUCTIONS On this format, list the average daily- unit power level in' MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

ZCLERK-7

- ~ - -- - _ - - - _ .-. .. - - ._.

. . - - . ~ . - .

e October 1996

SUMMARY

OF OPERATING EXPERIENCE 1

i l

UNIT 1  !

\

' Unit 1 began October on-line at 1076 MWe power level (99.9%-reactor power). Unit 1 remained on line. for the entire reporting period. Unit 1 concluded the. ,

- reporting period at 1080 MWe _ power level (100% reactor power) and with an availability factor of IM,0% for the month of October.

i-

! l l

)

i UNIT 2 l i-l

l Unit 2 began October off-line for a continuation of refueling outage (Z2R14). j U1it 2 is sched91ed to be back on-line on December 10, 1996.

l g

I ZCLERK-8

. 7_

(

t i .

1 October 1996 MAJOR MAINTENANCE

]

EQUIPMENT NAME WORK PERFORMED (UNIT 1)

OB IA COMP- Repair Packing Follower

. Completed j 005: 09/29/96 - 10/01/96

'1B HD PP 1B HD Pump Lube Oil Temp i . Completed 005: 09/11/96 - 10/23/96 1A C/CB PP Verify Pump Alignment

., Completed j .005: 10/17/96 - 10/23/96 I

e 4

4

)

i 4

i i

i r

COMMENT:

l ZCLERK-9

l ..

, October 1996 MAJOR MAINTENANCE-

=

EQUIPMENT NAME WORK PCRFORMED (UNIT 2) 2B C/CB PP Perform PM/ Change. Lubrication 00S: 07/30/96

  • 2A IA Comp Compressor Replacement DOS: 07/14/96
  • I i

i COMMENT.:

  • No return to service date.

(

ZCLERK-10 l

I

7 REFUELING INFORMATION REQUEST 1 OVESTIONS:

.1. Name of facility.

2. Scheduled date for next refueling shutdown.
3. Scheduled date for restart following refueling,
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If a"swer is yes, what, in general, will these be?

If unswer 1s- no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?  !

J l S. Scheduled Jate(s) for submitting proposed licensing action and supporting information.

6. Important licensing considerations associated with refueling, e.g., new or l- different fuel design or supplier, unreviewed design or performance analysis
methods, significant changes in fuel design, new operating procedures. l l  !

t 7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel

storage pool. 1 l 8. .The present licensed spent fuel pool storage capacity and the size of any l increase in licensed storage capacity that has been requested or is planned,

! in the number c,f fuel assemblies. 'l

9. The projected date of the last refueling that can be discharged to the spent L fuel pool assuminn the present licensed capacity.

i l

r t

l i

i

l Page 1 of 4 ZCLERK-11

1 I

1 l

REFUELING INFORMATION REQUEST l UNIT 1 - ANSWERS:

1. Zion Unit 1.
2. Cycle 15 is scheduled to shutdown April 5.1997 for refueling.
3. Cycle 16 is scheduled to start up May 25, 1997.
4. The following License Amendments are required to allow resumption of operation after Refueling Outage Z1R15.

e Increase Steam Generator plugging limit. Required to ensure Unit derating will not be required based on Steam Generator plugging.

The Reload Safety Analysis for cycle 16 will be completed during Z1R15

5. Pro. armed submittal of License Amendment is the last half of December 1996.
6. Not applicable.
7. The number of fuel assemblies (a) in the core is 193. and (b) in the spent fuel storage pool from Zion Unit 1 is 932.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit
2) is 3012 fuel assemblies. Of these 3012 storage locations. 11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A. C).
9. The projected date of the last refueling than can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22-90-0-008A. C) will be installed prior to June 2003. This j projected date is subject to change based on outage durations or Overhaul '

Schedule changes.

l l

I 2 of 4 l

ZCLERK-12 3

REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:

1. Zion Unit 2.
2. Cycle 14 is scheduled to shutdown September 19, 1996 for refueling.
3. Cycle 15 is scheduled to start up December 10, 1996.
4. The following outstanding License Amendment Requests are required for startup of Unit 2 following Refueling Outage Z2R14.
  • PTLR Amendment - sent to NRC.
5. There are no outstanding proposed License Amendments required for startup from Z2R14.
6. No license considerations associated with refueling.
7. The number of fuel assemblies (a) in the core is 0 (Unit 2 is shutdown for refueling, and Core offload was completed 10/5/96).

(b) in the spent fuel storage pool from Zion Unit 2 is 1101.

l l

l 3 of 4 l

ZCLERK-13

i REFUELING INFORMATION REQUEST UNIT'2 - ANSWERS: (Continued) l i

4

8. The present licensed spent fuel pool storage capacity (shared with Zion Unit

! .2) is 3012. fuel assemblies. Of these 3012 storage locations.11 are  ;

i unavailable and 239 are inaccessible pending completion of the Offset Tool. i

! . Modification (M22-90-0-008A.- C) .  !

~

9. - The projected date of the last refueling that can be discharged to the spent ,

fuel pool, assuming the present licensed capacity of 3012 locations (11 out j of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996  :

1 Projected Comed Overhaul Schedule. 'This ' assumes the Offset Tool-Modification (M22-90-0-008A, C) will be installed prior to June 2003. This  !

projected date is subject to change based on outage durations or Overhaul Schedule changes.