Cominonwealth Edimn Cornp.iny Zion Gencrating Station 101 Shilots Itoulevard ZMn fl.(dMP.4 2797 Tcl 817." 16 208 i March 14, 1997 Nuclear Regulatory Commission Document Control Desk l
Washington. DC 20555 l
l l
Dear Sir:
Attached is the February Operating Status Report.
NIIN
- 41. S. Starkey g
g Plant General Manager Zion Station l
l RSS/jlc I
Enclosure cc:
Regulatory Assurance USNRC Document Control H. Keiser A. B. Beach (NRC)
D. Farrar D. R. Eggett INP0 Div. of Enforcement Health State of Illinois /IDNS F. Yost NRC Inspector, Zion IDNS Inspector. Zion Operatfng Engrs.
C. Y. Shiraki Master File I
i 9703200125 970228 F
i PDR ADOCK 05000295 R
- 00039 kI W.
ZCLERK-1 3 enicom company
~
OPERATING DATA REPORT DOCKET NO.
50-295 DATE 3/14/97 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 OPERATING STATUS 1.
Unit Name:
Zion Unit 1 2.
Reporting Period: 0000 020197 to 2400 022897 Notes 3.
Licensed Thermal Power (MWt):
3250 4.
Nameplate Rating (Gross MWe):
1085 5.
Design Electrical Rating (Net MWe):
1040 6.
Maximum Dependable Capacity (Gross MWe): 1085 7.
Maximum Dependable Capacity (Net MWe):
1040 8.
If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted. If Any (Net MWe):
N/A 10.
Reasons For Restrictions. If Any:
N/A This Month Yr-to-Date Cumulative 11.
Hours in Reporting Period 672.0 1.416.0 203.064.0 12.
Number Of Hours Reactor Was Critical 494.3 1.238.3 138.741.3 13.
Reactor Reserve Shutdown Hours 0.0 0.0 2.612.8 14.
Hours Generator On-Line 494.3 1.238.3 134.804.2 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1.115.595.0 3.442.179 0 398.004.120 17.
Gross Electrical Energy Generated (MWH) 362.987.0 1.137.150.0 129.673.297 18.
Net Electrical Energy Generated (MWH) 340.919.0 1 079.324.0 123.571.046 19.
Unit Service Factor 73.6 87.5 66.4 20.
Unit Availability Factor 73.6 87.5 66.4 21.
Unit Capacity Factor (Using MDC Net) 48.8 73.3 58.S 22.
Unit Capacity Factor (Using DER Net) 48.8 73.3 58.5 23.
Unit Forced Outage Rate 00.0 00.0 15.8 24.
Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Cycle 15 is scheduled to shutdown for a Refuelina Outaae on Seotember 6.1997 (58 days) 25.
If Shut Down At End Of Report Period. Estimated Date of Startup: No estimated date 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
I ZCLERK-2 j
~. _ _ _ _
OPERATING DATA REPORT DOCKET N0.
50-304 DATE 3/14/97 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 1
OPERATING STATUS 4
1.
Unit Name:
Zion Unit 2 2.
Reporting Period: 0000 020197 to 2400 022897 Notes 3.
Licensed Thermal Power (MWt):
3250
}
4.
Nameplate Rating (Gross MWe):
1085 5.
Design Electrical Rating (Net MWe):
1040 J
6.
Maximum Dependable Capacity (Gross MWe):
1085 7.
Maximum Dependable Capacity (Net MWe):
1040 l
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 672.0 1.416.0 196.777.0 12.
Number Of Hours Reactor Was Critical 00.0 00.0 138.378.7 13.
Reactor Reserve Shutdown Hours 00.0 00.0 226.1 14.
Hours Generator On-Line 00.0 00.0 135.098.8 15.
Unit Reserve Shutdown Hours 00.0 00.0 0.0 16.
Gross Thermal Energy Generated (MWH) 00.0 00.0 402.647.369 17.
Gross Electrical Energy Generated (MWH) 00.0 00.0 130.102.951 18.
Net Electrical Energy Generated (MWH) 00.0 00.0 124.095.088 19.
Unit Service Factor 00.0 00.0 68.7 20.
Unit Availability Factor 00.0 00.0 68.7 21.
Unit Capacity Factor (Using MDC Net) 00.0 00.0 60.6 22.
Unit Capacity Factor (Using DER Net) 00.0 00.0 60.6 23.
Unit Forced Outage Rate 00.0 00.0 13.3 24.
Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25.
If Shut Down At End Of Report Period. Estimated Date of Startup: No estimated date 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-3
i4 -. -
m.4 d4_
1 6_4.*
4#Lt A1-2.1 4 J.M.4u
,.+14.Am..4_.m E%_,,36m L6 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-295 t
UNIT NAME Zion Unit 1 DATE 3/14/97 i
COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084-x3169 REPORT MONTH February 1997 1
Duration 2
Method of Licensee System Component Cause & Corrective No.
Date Type (Hours)
Reason Shutting Event Code 4 Code 5 Action to Down 3 Report #
Prevent Recurrence Reactor 3
02/11/97 5
255.8
- H 5
Unit 1 Rampdown To I
44% Power For LCO.
Off LCO But Holding At 44% Power.
4 02/21/97 S
177.7
- H 1
97-005 Ur.it 1 LC0 Expired.
Unit Taken Off-line At 14:15 on 2/21/97 And Remained Off-line For Maintenance Outage (Z1M06).
t
- H - Please refer to column on right (Cause & Corrective Actions) 1 2
3 4
F: Forced Reason:
Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source H-Other (Explain)
ZCLERK-4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-304 UNIT NAME Zion Unit 2 DATE 3/14/97 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084.x3169 REPORT MONTH February 1997 1
Duration 2
Method of Licensee System Component Cause & Corrective No.
Date Type (Hours)
Reason Shutting Event Code 4 Code 5 Action to Down 3 Report #
Prevent Recurrence Reactor 7
02/01/97 5
672.0 C
1 Unit 2 Remained Off-Line For The Entire Month Of February For The Continuation Of Refueling Outage Z2R14.
1 2
3 4
F: Forced Reason:
Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source H-Other (Explain)
ZCLERK-5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-295 UNIT Z1on Unit 1 DATE 3/14/97 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 MONTH February 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVEPAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l 1
1036 17 383 2
1039 18 386 3
1037 19 388 4
1037 20 386 5
1040 21 205 6
1038 22
-19 7
1038 23
-19 8
1038 24
-21 9
1037 25
-22 10 1007 26
-22 11 371 27
-20 12 361 28
-14 13 369 29 14 377 30 15 384 31 16 383 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
f i
ZCLERK-6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-304 UNIT Zion Unit 2 DATE 3/14/97 COMPLETED BY J. CYGAN TELEPHONE _1847) 746-2084 x3169 February 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-12 17 -
-11 2
-12 18
-11 3
-12 19
-11 4
-12 20
-12 5
-12 21
-14 6
-12 22
-18 7
-12 23
-19 8
-12 24
-21 9
-12 25
-21 10
-12 26
-22 11
-12 27
-19 12
-12 28
-14 13
-12 29 14
-12 30 15
-11 31 16
-11 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
ZCLERK-7 l
1 I
l i
February 1997
SUMMARY
OF OPERATING EXPERIENCE i
UNIT 1 Unit 1 began February on-line at 1089 MWe power level (100% reactor power).
On February 10, 1997 at 22:27 Unit 1 started to rampdown for an LCO (Limiting Condition of Operation) shutdown. At 00:00 on February 11, 1997 rampdown was stopped. Unit is off LC0 for shutdown but holding at 44% power.
On February 21, 1997 an NRC Emergency Notification System (ENS) Phone call was i
made at 12:14 concerning the start of Unit 1 shutdown which was caused by expiration of Technical Specification LCO clock. Unit was off-line at 14:15 on February 21, 1997 and remained off-line for the rest of the reporting period for Maintenance Outage (Z1M06).
j UNIT 2 Unit 2 began February off-line for a continuation of refueling outage (Z2R14).
Unit 2 is scheduled to be back on-line on March 2, 1997.
i ZCLERK-8
A February 1997 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 1) 1A SA COMP Repair Tubing Oil Leakage Completed 005: 02/03/97 - 02/04/97 q
1A lid PP Repair Pump Inboard Seals / Lube Completed 005: 02/04/97 - 02/08/97 1B C/CB PP Cleaning Oil Cooler Completed 005: 02/06/97 - 02/08/97 1B C/CB PP Clean Motor Internals Completed 005: 02/10/97 - 02/14/97
'O' PP COMP Clean Service Water Cooler Completed 00S: 02/10/97 - 02/20/97 1C CS PP Clean And Inspect Completed 005; 02/11/97 - 02/12/97 1C AFW PP Clean And Inspect Completed 005: 02/18/97 - 02/19/97 1C CS PP Troubleshoot PP Failure To Start Completed 00S: -02/19/97 - 02/21/97 COMMENT:
ZCLERK-9
February 1997 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 2) 2A SA Cmp Repair Oil Leaks i
Completed 1
005: 02/07/97 - 02/13/97 2A SA Comp Repair Oil Leaks Completed 1
OOS: 02/15/97 - 02/19/97 COMMENT:
ZCLERK-10
i l
REFUELING INFORMATION REQUEST OVESTIONS:
1.
Name of facility.
2.
Scheduled date for next refueling shutdown.
3.
Scheduled date for restart following refueling.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
If no such review has taken place, when is it scheduled?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
7.
The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in the number of fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
i Page 1 of 3 ZCLERK-11
REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS:
1.
Zion Unit 1.
2.
Cycle 15 is scheduled to shutdown September 6, 1997 for refueling.
3.
Cycle 16 is scheduled to start up November 5. 1997.
4.
The following License Amendments are required to allow resumption of operation after Refueling Outage Z1R15.
Increase Steam Generator plugging limit. Required to ensure Unit derating will not be required based on Steam Generator plugging.
Authorize Steam Generator tube sleeving per new Topical Report.
e Required to allow additional sleeving options to minimize plugging.
e Authorize new F* limit on tube re-roll and new EF* re-roll limit.
Recuired to support increased plugging limit. Required to allow adcitional re-roll options to minimize plugging.
The Reload Safety Analysis for cycle 16 will be completed during Z1R15.
S.
Projected submittal of License Amendments: March, 1997.
i 6.
Not applicable.
7.
The number of fuel assemblies (a) in the core is 193. and (b) in the spent fuel storage pool from Zion Unit 1 is 932.
8.
The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 3012 fuel assemblies. Of these 3012 storage locations.11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A, C).
9.
The projected date of the last refueling than can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is Aoril 2006 (from Z1R21) based on the 1997 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22-90-0-008A, C) will be installed prior to June 2003.
This projected date is subject to change based on outage durations or Overhaul Schedule changes.
2 of 3 ZCLERK-12
4 REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:
1.
Zion Unit 2.
2.
Cycle 14 shutdown September 19. 1996 for refueling.
3.
Cycle 15 has no scheduled date for start up.
4.
There are no outstanding License Amendments required for startup of Unit 2 following Refueling Outage Z2R14.
S.
There are no outstanding proposed License Amendments required for startup of Unit 2 following Refueling Outage Z2R14.
6.
New fuel reloaded into Unit 2 Cycle 15 core will incorporate the following design changes:
Selected standard Integral Fuel Burnable Absorber (IFBA) patterns e
have been updated following a Westinghouse Core Engineering investigation of peripheral IFBA rod loading within the fuel assembly. The net effect of this change is to achieve the most efficient absorber orientation at Beginning of Life (BOL) and for burnups through 5000 MWD /MTU. These patterns provide self-limiting features that mitigate the extent of DNB propagation.
In addition, these IFBA patterns provide significant peaking factor and reactivity holddown benefits.
e IFBA rods will have a nominal B-10 enrichment loading with a reduction in backfill pressure from 200 to 100 psig. The nominal B-10 loading is 1.77 mg/ inch. Rod internal gas pressure has an effect on two of the fuel rod design criteria that are evaluated for the reload: Rod internal pressure and clad stress criteria.
The Zion Unit 2 Cycle Specific fuel design analysis has been performed and has demonstrated that the design criteria were met.
7.
The number of f"el assemblies (a) in the core is 193 and (b) in the spent fuel storage pool from Zion Unit 2 is 984.
8.
The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 3012 fuel assemblies. Of these 3012 storage locations. 11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A, C).
9.
The projected date of the last refueling that can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22-90-0-008A. C) will be installed prior to June 2003.
This projected date is subject to change based on outage durations or Overhaul Schedule changes.
3 of 3 ZCLERK-13