MONTHYEARA99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 A97036, Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2 ML20217M4151997-07-31031 July 1997 Corrected Page to Monthly Operating Rept for Jul 1997 for Zion Generating Station,Unit 1 A97027, Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 2 ML20148L5771997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Zion Generating Station,Units 1 & 2 ML20141D8601997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Zion Station Units 1 & 2 ML20217M4011997-03-31031 March 1997 Corrected Page to Monthly Operating Rept for March 1996 for Zion Generating Station,Unit 1 ML20137Y1491997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Zion Unit 1 ML20136J5091997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Zion,Units 1 & 2 ML20135A5311997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Zion Station Units 1 & 2 ML20133M1891996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Zion Generating Station Units 1 & 2 ML20132D7401996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Zion Generating Station Units 1 & 2 ML20134K7121996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Zion Generating Station Units 1 & 2 ML20134K7531996-09-30030 September 1996 Corrected Monthly Operating Repts for Sept 1996 for Zion,Units 1 & 2 ML20129B3711996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Zion Generating Station ML20134K7491996-08-31031 August 1996 Corrected Monthly Operating Repts for Aug 1996 for Zion,Units 1 & 2 ML20217M4071996-04-30030 April 1996 Corrected Page to Monthly Operating Rept for Apr 1996 for Zion Generating Station,Unit 1 ML20149K2411996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Zion Unit 1 ML20149G2851994-09-30030 September 1994 Monthly Operating Repts for Sept 1994 for Zion Generating Station ML20058K2281993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Zion Generating Station ML20058K2341993-10-31031 October 1993 Corrected Monthly Operating Rept for Oct 1993 for Zion Unit 2 ML20059K0731993-10-31031 October 1993 Monthly Operating Repts for Oct 1993 for Zion Generating Station Units 1 & 2 ML20058P1631993-09-30030 September 1993 Monthly Operating Repts for Sept 1993 for Zion,Units 1 & 2 ML20057B6921993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for Zion,Unit 1 ML20056D6881993-07-31031 July 1993 Monthly Operating Repts for Jul 1993 for Zion Generating Station,Units 1 & 2 ML20128K6951993-01-31031 January 1993 Monthly Operating Repts for Jan 1993 for Zion,Units 1 & 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98049, Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 21998-09-25025 September 1998 Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 2 ML20195D1221998-08-31031 August 1998 DSAR, for Zion Station A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 ML20236J7911998-06-12012 June 1998 LER 98-S02-00:on 980517,first Shift Security Officer Reported Being Wounded by Unknown Subject Who Fled Area. Caused by accidental,self-inflicted Gunshot Wound.Removed Officer from Duty & Charged Officer W/Filing False Rept A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 A98034, 1997 Annual 10CFR50.59 Summary Rept1997-12-31031 December 1997 1997 Annual 10CFR50.59 Summary Rept ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 ML20202F1451997-12-0303 December 1997 Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 ML20199J5931997-11-26026 November 1997 SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14) A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event1997-11-13013 November 1997 Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 ML20211M0181997-10-0707 October 1997 Special Rept 295-123-97-001SR:on 970904,OA Motor Declared Inoperable Due to Pin Hole Leaks Identified on Pressure Regulating Relief valve,0FP0052.Procedure Was Rewritten to Ensure 0FP0052 Would Maintain Same Pressure When Fully Open A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual 1999-09-30
[Table view] |
Text
I Comm:nwealth Edl=n Zion Generating Station 101 Shiloh Blvd.
Zion, Illinois 6o099 Telephone 708 / 746-2084 I
1 l
1 l
l l
October 13, 1994 ;
ZAD-94-010 Nuclear Regulatory Conmission Document Control Desk Washington, DC 20555
Dear Sir:
Attached is the September Operating Status Report.
.'t@YA"f f E. A/.~ Broccolo j ;
Station Managerl/
Zion Station EAB/jlc Enclosure cc: Regulatory Assurance USNRC Document Control M Wallace J. Martin (NRC)
T. Rieck D. Farrar D. R. Eggett 1 INPO l Div. of Enforcement Health i State of Illinois /IDNS l F. Yost l NRC Inspector Zion 1
Operating Engrs.
C. Y. Shiraki - Fax Master File p i
9410200141 940930 PDR ADOCK 05000295 l}
R PDR ZCLERK-(1)
1 i
OPERATING DATA REPORT l
DOCKET NO. 50-295 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708)746-2084 X3169 i 1
QPERATING STATUS
- 1. Unit Name: Zion Unit 1
- 2. Reporting Period: 0000 090194 to 2400 093094 Notes
- 3. Licensed Thermal Power (MWt): 3250 1 l
- 4. Nameplate Rating (Gross MWe): 1085
- 5. Design Electrical Rating (Net MWe): 1040 1
- 6. Maximum Dependable Capacity (Gross MWe): 1085 7 ~. Maximum Dependable Capacity (Net MWe): 1040 .
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: N/A i
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative.
11 Hours in Reporting Period 720.0 6.551.0 181.895.0 1 2.316.7 121.752.3
- 12. Number Of Hours Reactor Was Critical 720.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 2.621.8
- 14. Hours Generator On-Line 720.0 2.265.2 118.188.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2.322.957.0 6.921.564.0 345.494.711
- 17. Gross Electrical Energy Generated (MWH) 774.133.0 2.293.904.0 112.153.464
- 18. Net Electrical Energy Generated (MWH) 746.175.0 2.199.062.0 106.745.633
- 19. Unit Service Factor 100.0 34.6 65.0
- 20. Unit Availability Factor 100 0 34.6 65.0- {
- 21. Unit Capacity Factor (Using MDC Net) 99.6 32.3 56.4 l
- 22. Unit Capacity Factor (Using DER Net) 99.6 32.3 56.4 '
i
- 23. Unit Forced Outage Rate 00.0 48.4 16.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 1
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved- -l INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-(2) l
OPERATING DATA REPORT DOCKET NO. 50-304 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708)746-2084 i X3169 l
l OPERATING STATUS l
- 1. Unit Name: Zion Unit 2
- 2. Reporting Period: 0000 090194 to 2400 093094 Notes ,
- 3. Licensed Thermal Power (MWt): 3250 l
- 4. Nameplate Rating (Gross MWe): 1085 ;
- 5. Design Electrical Rating (Net MWe): 1040 i
- 6. Maximum Dependable Capacity (Gross MWe): 1085 )
- 7. Maximum Dependable Capacity (Net MWe): 1040
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.
Give Reasons: N/A
- 9. Power Level To Which Restricted. If Any (Net MWe): N/A
- 10. Reasons For Restrictions. If Any: N/A l
This Month Yr-to-Date. Cumulative
- 11. Hours In Reporting Period 720.0 6.551.0 175.608.0
- 12. Number Of Hours Reactor Was Critical 720.0 4.009.8 123.974-9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 226.1
- 14. Hours Generator On-Line 720.0 3.983.5 120.989.6
- 15. . Unit Reserve Shutdown Hours- 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2.325.453.0 12.738.065.0 359.867.852 ,
- 17. Gross Electrical Energy Generated (MWH) 777.978.0 4.263.996.0 115.945.158 ;
Net Electrical Energy Generated (MWH)
^
- 18. 750.390.0 4.090.174.0 110.493.015
- 19. Unit Service Factor 100.0 60.8 68.9
- 20. Unit Availability Factor 100.0 60.8 - 68.9
- 21. Unit Capacity Factor (Using MDC Net) 100.2 60.0 60.5
- 22. Unit Capacity Factor (Using DER Net) 100.2 60.0 -60.5
- 23. Unit Forced Oatage Rate 0.0 0.0 14.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of.Each).
Refuelino Outaae Startina 1/5/95 Duration 70 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: . l
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION J
I
)
i i
, ZCLERK-(3) i
I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-295 UNIT NAME Zion Unit 1 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169 REPORT MONTH SEPTEMBER 1994 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down. 3 Report # Prevent Recurrence Reactor Unit On-line For ,
The Entire Reporting Period.
1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & Licensee Examiriation 5-Reduced Load i F-Administrative 5 l G-Operational Error (Explain) Exhibit 1 - Same Source l
H-Other (Explain)
ZCLERK-(4)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-304 UNIT NAME Zton Unit 2 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169 REPORT MONTH SEPTEMBER 1994 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Dcwn 3 Report # Prevent Recurrence i Reactor Unit On-line For The Entire Reporting Period.
1 2 3 4 F: Forced Method Exhibit G - Instructions S: Scheduled ReasonhmentFailure(Explain)
A-Equi 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee ,
C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & Licensee Examination 5-Reduced Load
- F-Administrative 5' G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)
ZCLERK-(5)
___ __ _ __ _ ._ . _ _ _ _ . _ . .. .- ._ - . - - - . ~ _ _ _ . _ .
~ - .__ _ - _ - _ . _ . . _ - _ _ . . _ - - _
.- l t
AVERAGE DA1LY UNIT POWER LEVEL DOCKET N0. 50-295 TJNIT Zion Unit 1 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169- ,
MONTH SEPTEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 3 1 1011 17 1042 2 1041 18 1032 3 1041 19 1041 4 1035 20 1042 S 975 21 1041 ;
6 1037 22 1042 ,
7 1042 23 1039 1 8 1041 24 1041 ,
9 1041 25 1040 10 1042 26 1038 11 1034 27 1030 12 1040 28 1040 13 1042 29 1040-14 1041 30 1038 15 1042 31 16 1041
]
l INSTRUCTIONS 1 l
On this format, list the tverage daily unit power level in MWe-Net for each day in the !
I reporting month. Compute to the nearest whole megawatt.
i ZCLERK-(6)
-_ _ . , . - . . = . . - - - ..
i a e AVERAGE DAILY UNIT POWER LEVEL c .
DOCKET NO. 50-304 UNIT Zion Unit 2 l DATE 10/13/94 1 COMPLETED BY J. CYGAN l TELEPHONE (708) 746-2084 1 x3169 MONTH SEPTEMBER 1994
. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1014 17 1042 2 1042 18 1044 3 1044 19 1049 4 1037 20 1051 ,
?
5 975 21 1050 6 1041 22 1049 7 1044 23 1048 8 1045 24 1049 9 1045 25 1049 10 1046 26 1049 11 1045 27 1048 12 1043 28 1049 13 1044 29 1048 s
14 1040 30 1047 15 1044 31 7
16 1045 i
1NSTRUCT10NS l On this format,11st the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I l
i ZCLERK-(7) I
SEPTEMBER 1994
SUMMARY
OF OPERATING EXPERIENCE UNIT l' Unit 1 began September on-line at 1081 MWe power level (100% rector power) and remained on line for the entire month of September.
Unit 1 concluded the reporting period at 1079 MWe power level (99.2% reactor power),
i i
UNIT 2 Unit 2 began September on-line at 1086 MWe power level (100% reactor power) and remained on-line for the entire month of September.
Unit 2 concluded the reporting period at 1086 MWe power level (99% reactor power).
l i
-)
i
'I ZClu, .3)-
L-
]
SEPTEMBER 1994
[.. ,
MAJOR MAINTENANCE f_QLLIPMENT NAME WORK PERFORMED (UNIT 1) l i
-0A FP Window Work Scheduled Work Performed OOS: 09/05/94 - 09/09/94 -i 1B D/G L/0 Pressure Switch ,
4 L/0 Pressure Switch Work
'- 00S: 09/27/94 - 09/28/94 l 1A SW Pp Major Overhaul 00S: 08/21/94 r i j I
l i
i 2
1 1
j- ,
f 1 i
i'
?
s.
, COMMENT:
i4 i
j-J i ZCLERK-(9) i.'
SEPTEMBER 1994 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 2) 2A D/G Replace Turbo Charger Turbo Charger Replaced 005: 09/06/94 - 09/08/94 2B D/G Replace Turbo Charger Turbo Charger Replaced 00S: 09/12/94 - 09/13/94 d.
OMMENT:
l l
1 I:
I -. ,
ZCLERK-(10) 2..-..._ ..--.:. _, ,. - _ __ _. _ -- ___ _..-. .-___. ___.._____.______ .._.__ __ _ _ . . _ _ - . _ _ _ . . .
p 1
REFUELING INFORMATION REQUEST i
OUESTIONS:
- 1. Name of facility.
- 2. Scheduled date for next refueling shutdown.
- 3. Scheduled date for restart following refueling.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be? '
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any l unreviewed safety questions are associated with the core reload (Ref. 10 t CFR Section 50.59)? ,
If no such review has taken place, when is it scheduled?
i
- 5. Scheduled.date(s) for submitting proposed licensing action and supporting. i information. ;
- 6. Important licensing considerations associated with refueling, e.g.. new i or different fuel design or supplie.. unreviewed design or performance analysis methods, significant changes in fuel design, new operating ,
procedures. !
- 7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
- 8. The present licensed spent fuel pool storage capacity and the size of any '
increase in licensed storage capacity that has been requested or is planned, in the number of fuel assemblies. >
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. ,
1 l
s l
l 1
Page 1 of 3 l
ZCLERK-(11)
I t
REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS:
- 1. Zion Unit 1.
- 2. Cycle 14 is scheduled to shutdown September ,, 1995 for refueling.
- 3. Cycle 15 is scheduled to start up November 4.1995.
- 4. No. There are no outstanding License Amendments required to allow resumption of operation after Refueling Outage Z1R14. However, there are two proposed License Amendments being prepared which will allow installation of modifications during the outage. The first License Amendment will revise the Secondary Undervoltage setpoint.s based on new engineering calculations. The second License Amendment will extend the Reserve Source of Off-Site AC Power Allowed Outage Time (A0T), on a one time basis, to allow installation of a System Auxiliary Transformer
, modification on Unit 1. A third proposed License Amendment in preparation will allow storage of fuel enriched to up to 4.65 weight percent U-235, in the New Fuel Storage Vault (NFSV), prior to.Z1R14. If this amendment is not received before new fuel receipt, new fuel will be transferred directly into the Spent Fuel Pit for storage.
The Reload Safety Analysis has not been completed. Initial review of the Reload will be completed in November. Final approval is scheduled to be completed by January 31, 1995.
- 5. The Reserve Source A0T Extension and NFSV License Amendment Requests are scheduled to be submitted in early October. The Secondary Undervoltage I License Amendment Request is scheduled to be submitted in late October.
- 6. Not applicable.
- 7. The number of fuel assemblies 1
(a) in the core is 193, and (b) in the spent fuel storage pool from Zion Unit 1 is 860. l
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 3012 fuel assemblies (only 2762 locations will be accessible).
- 9. Zion Station will lose dual full core discharge capability in November 2001. at the beginning cf Unit 1 Cycle 19, based on the latest Nuclear Stations Refreling Schedule. Full core discharge capability for a single core will be lost in May 2003 at the beginning of Unit 1 Cycle 20.
These projections are based on the current number of available storage cells in the spent fuel pool and does not include the use of the offset tool.
2 of 3 ZCLERK-(12)
_ ~_ ._ . ._ _
REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:
- 1. Zion Unit 2.
- 2. Cycle 13 is scheduled to shutdown January 5. 1995 for refueling.
- 3. Cycle 14 is scheduled to start up March 22, 1995.
- 4. Yes, A License Amendment was required to allow resumption of operation after Refueling Outage Z2R13. The NIS Instrumentation License Amendment was approved by the NRC on 10/14/93 (License Amendment 149/137). This amendment will allow startup after Z2R13, during which new Source and Intermediate Range NIS detectors will be installed.
- 5. There are no outstanding proposed License Amendments required for startup from 22R13. This item is not applicable.
- 6. Not applicable.
- 7. The number of fuel assemblies (a) in the core is 193, and '
(b) in the spent fuel storage pool from Zion Unit 2 is 024.
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 3012 fuel assemblies (only 2762 locations will be accessible) ;
- 9. Zion Station will-lose dual full core discharge capability in November 2001, at the beginning of Unit 1 Cycle 19, based on the latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single core will be lost in May 2003, at the beginning of Unit : Cycle 20. ,
These projections are based on the current number of available storage '
r lls in the spent fuel pool and does not include the use of the offset tool. ,
1
'l 1
1 3 of 3 ZCLERK-(13)