I Comm:nwealth Edl=n Zion Generating Station 101 Shiloh Blvd.

Zion, Illinois 6o099 Telephone 708 / 746-2084 I

1 l

1 l

l l

October 13, 1994  ;

ZAD-94-010 Nuclear Regulatory Conmission Document Control Desk Washington, DC 20555

Dear Sir:

Attached is the September Operating Status Report.

.'t@YA"f f E. A/.~ Broccolo j ;

Station Managerl/

Zion Station EAB/jlc Enclosure cc: Regulatory Assurance USNRC Document Control M Wallace J. Martin (NRC)

T. Rieck D. Farrar D. R. Eggett 1 INPO l Div. of Enforcement Health i State of Illinois /IDNS l F. Yost l NRC Inspector Zion 1

Operating Engrs.

C. Y. Shiraki - Fax Master File p i

9410200141 940930 PDR ADOCK 05000295 l}

R PDR ZCLERK-(1)

1 i

OPERATING DATA REPORT l

DOCKET NO. 50-295 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708)746-2084 X3169 i 1

QPERATING STATUS

1. Unit Name: Zion Unit 1
2. Reporting Period: 0000 090194 to 2400 093094 Notes
3. Licensed Thermal Power (MWt): 3250 1 l
4. Nameplate Rating (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): 1040 1
6. Maximum Dependable Capacity (Gross MWe): 1085 7 ~. Maximum Dependable Capacity (Net MWe): 1040 .
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: N/A i
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative.

11 Hours in Reporting Period 720.0 6.551.0 181.895.0 1 2.316.7 121.752.3

12. Number Of Hours Reactor Was Critical 720.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 2.621.8
14. Hours Generator On-Line 720.0 2.265.2 118.188.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2.322.957.0 6.921.564.0 345.494.711
17. Gross Electrical Energy Generated (MWH) 774.133.0 2.293.904.0 112.153.464
18. Net Electrical Energy Generated (MWH) 746.175.0 2.199.062.0 106.745.633
19. Unit Service Factor 100.0 34.6 65.0
20. Unit Availability Factor 100 0 34.6 65.0- {
21. Unit Capacity Factor (Using MDC Net) 99.6 32.3 56.4 l
22. Unit Capacity Factor (Using DER Net) 99.6 32.3 56.4 '

i

23. Unit Forced Outage Rate 00.0 48.4 16.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: 1
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved- -l INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-(2) l

OPERATING DATA REPORT DOCKET NO. 50-304 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708)746-2084 i X3169 l

l OPERATING STATUS l

1. Unit Name: Zion Unit 2
2. Reporting Period: 0000 090194 to 2400 093094 Notes ,
3. Licensed Thermal Power (MWt): 3250 l
4. Nameplate Rating (Gross MWe): 1085  ;
5. Design Electrical Rating (Net MWe): 1040 i
6. Maximum Dependable Capacity (Gross MWe): 1085 )
7. Maximum Dependable Capacity (Net MWe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.

Give Reasons: N/A

9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A l

This Month Yr-to-Date. Cumulative

11. Hours In Reporting Period 720.0 6.551.0 175.608.0
12. Number Of Hours Reactor Was Critical 720.0 4.009.8 123.974-9
13. Reactor Reserve Shutdown Hours 0.0 0.0 226.1
14. Hours Generator On-Line 720.0 3.983.5 120.989.6
15. . Unit Reserve Shutdown Hours- 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2.325.453.0 12.738.065.0 359.867.852 ,
17. Gross Electrical Energy Generated (MWH) 777.978.0 4.263.996.0 115.945.158  ;

Net Electrical Energy Generated (MWH)

^

18. 750.390.0 4.090.174.0 110.493.015
19. Unit Service Factor 100.0 60.8 68.9
20. Unit Availability Factor 100.0 60.8 - 68.9
21. Unit Capacity Factor (Using MDC Net) 100.2 60.0 60.5
22. Unit Capacity Factor (Using DER Net) 100.2 60.0 -60.5
23. Unit Forced Oatage Rate 0.0 0.0 14.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of.Each).

Refuelino Outaae Startina 1/5/95 Duration 70 days

25. If Shut Down At End Of Report Period. Estimated Date of Startup: . l
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION J

I

)

i i

, ZCLERK-(3) i

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-295 UNIT NAME Zion Unit 1 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169 REPORT MONTH SEPTEMBER 1994 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down. 3 Report # Prevent Recurrence Reactor Unit On-line For ,

The Entire Reporting Period.

1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examiriation 5-Reduced Load i F-Administrative 5 l G-Operational Error (Explain) Exhibit 1 - Same Source l

H-Other (Explain)

ZCLERK-(4)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-304 UNIT NAME Zton Unit 2 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169 REPORT MONTH SEPTEMBER 1994 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Dcwn 3 Report # Prevent Recurrence i Reactor Unit On-line For The Entire Reporting Period.

1 2 3 4 F: Forced Method Exhibit G - Instructions S: Scheduled ReasonhmentFailure(Explain)

A-Equi 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee ,

C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load

  • F-Administrative 5' G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

ZCLERK-(5)

___ __ _ __ _ ._ . _ _ _ _ . _ . .. .- ._ - . - - - . ~ _ _ _ . _ .

~ - .__ _ - _ - _ . _ . . _ - _ _ . . _ - - _

.- l t

AVERAGE DA1LY UNIT POWER LEVEL DOCKET N0. 50-295 TJNIT Zion Unit 1 DATE 10/13/94 COMPLETED BY J. CYGAN TELEPHONE (708) 746-2084 x3169- ,

MONTH SEPTEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 3 1 1011 17 1042 2 1041 18 1032 3 1041 19 1041 4 1035 20 1042 S 975 21 1041  ;

6 1037 22 1042 ,

7 1042 23 1039 1 8 1041 24 1041 ,

9 1041 25 1040 10 1042 26 1038 11 1034 27 1030 12 1040 28 1040 13 1042 29 1040-14 1041 30 1038 15 1042 31 16 1041

]

l INSTRUCTIONS 1 l

On this format, list the tverage daily unit power level in MWe-Net for each day in the  !

I reporting month. Compute to the nearest whole megawatt.

i ZCLERK-(6)

-_ _ . , . - . . = . . - - - ..

i a e AVERAGE DAILY UNIT POWER LEVEL c .

DOCKET NO. 50-304 UNIT Zion Unit 2 l DATE 10/13/94 1 COMPLETED BY J. CYGAN l TELEPHONE (708) 746-2084 1 x3169 MONTH SEPTEMBER 1994

. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1014 17 1042 2 1042 18 1044 3 1044 19 1049 4 1037 20 1051 ,

?

5 975 21 1050 6 1041 22 1049 7 1044 23 1048 8 1045 24 1049 9 1045 25 1049 10 1046 26 1049 11 1045 27 1048 12 1043 28 1049 13 1044 29 1048 s

14 1040 30 1047 15 1044 31 7

16 1045 i

1NSTRUCT10NS l On this format,11st the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I l

i ZCLERK-(7) I

SEPTEMBER 1994

SUMMARY

OF OPERATING EXPERIENCE UNIT l' Unit 1 began September on-line at 1081 MWe power level (100% rector power) and remained on line for the entire month of September.

Unit 1 concluded the reporting period at 1079 MWe power level (99.2% reactor power),

i i

UNIT 2 Unit 2 began September on-line at 1086 MWe power level (100% reactor power) and remained on-line for the entire month of September.

Unit 2 concluded the reporting period at 1086 MWe power level (99% reactor power).

l i

-)

i

'I ZClu, .3)-

L-

]

SEPTEMBER 1994

[.. ,

MAJOR MAINTENANCE f_QLLIPMENT NAME WORK PERFORMED (UNIT 1) l i

-0A FP Window Work Scheduled Work Performed OOS: 09/05/94 - 09/09/94 -i 1B D/G L/0 Pressure Switch ,

4 L/0 Pressure Switch Work

'- 00S: 09/27/94 - 09/28/94 l 1A SW Pp Major Overhaul 00S: 08/21/94 r i j I

l i

i 2

1 1

j- ,

f 1 i

i'

?

s.

, COMMENT:

i4 i

j-J i ZCLERK-(9) i.'

SEPTEMBER 1994 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 2) 2A D/G Replace Turbo Charger Turbo Charger Replaced 005: 09/06/94 - 09/08/94 2B D/G Replace Turbo Charger Turbo Charger Replaced 00S: 09/12/94 - 09/13/94 d.

OMMENT:

l l

1 I:

I -. ,

ZCLERK-(10) 2..-..._ ..--.:. _, ,. - _ __ _. _ -- ___ _..-. .-___. ___.._____.______ .._.__ __ _ _ . . _ _ - . _ _ _ . . .

p 1

REFUELING INFORMATION REQUEST i

OUESTIONS:

1. Name of facility.
2. Scheduled date for next refueling shutdown.
3. Scheduled date for restart following refueling.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will these be? '

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any l unreviewed safety questions are associated with the core reload (Ref. 10 t CFR Section 50.59)? ,

If no such review has taken place, when is it scheduled?

i

5. Scheduled.date(s) for submitting proposed licensing action and supporting. i information.  ;
6. Important licensing considerations associated with refueling, e.g.. new i or different fuel design or supplie.. unreviewed design or performance analysis methods, significant changes in fuel design, new operating ,

procedures.  !

7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
8. The present licensed spent fuel pool storage capacity and the size of any '

increase in licensed storage capacity that has been requested or is planned, in the number of fuel assemblies. >

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. ,

1 l

s l

l 1

Page 1 of 3 l

ZCLERK-(11)

I t

REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS:

1. Zion Unit 1.
2. Cycle 14 is scheduled to shutdown September ,, 1995 for refueling.
3. Cycle 15 is scheduled to start up November 4.1995.
4. No. There are no outstanding License Amendments required to allow resumption of operation after Refueling Outage Z1R14. However, there are two proposed License Amendments being prepared which will allow installation of modifications during the outage. The first License Amendment will revise the Secondary Undervoltage setpoint.s based on new engineering calculations. The second License Amendment will extend the Reserve Source of Off-Site AC Power Allowed Outage Time (A0T), on a one time basis, to allow installation of a System Auxiliary Transformer

, modification on Unit 1. A third proposed License Amendment in preparation will allow storage of fuel enriched to up to 4.65 weight percent U-235, in the New Fuel Storage Vault (NFSV), prior to.Z1R14. If this amendment is not received before new fuel receipt, new fuel will be transferred directly into the Spent Fuel Pit for storage.

The Reload Safety Analysis has not been completed. Initial review of the Reload will be completed in November. Final approval is scheduled to be completed by January 31, 1995.

5. The Reserve Source A0T Extension and NFSV License Amendment Requests are scheduled to be submitted in early October. The Secondary Undervoltage I License Amendment Request is scheduled to be submitted in late October.
6. Not applicable.
7. The number of fuel assemblies 1

(a) in the core is 193, and (b) in the spent fuel storage pool from Zion Unit 1 is 860. l

8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 3012 fuel assemblies (only 2762 locations will be accessible).
9. Zion Station will lose dual full core discharge capability in November 2001. at the beginning cf Unit 1 Cycle 19, based on the latest Nuclear Stations Refreling Schedule. Full core discharge capability for a single core will be lost in May 2003 at the beginning of Unit 1 Cycle 20.

These projections are based on the current number of available storage cells in the spent fuel pool and does not include the use of the offset tool.

2 of 3 ZCLERK-(12)

_ ~_ ._ . ._ _

REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:

1. Zion Unit 2.
2. Cycle 13 is scheduled to shutdown January 5. 1995 for refueling.
3. Cycle 14 is scheduled to start up March 22, 1995.
4. Yes, A License Amendment was required to allow resumption of operation after Refueling Outage Z2R13. The NIS Instrumentation License Amendment was approved by the NRC on 10/14/93 (License Amendment 149/137). This amendment will allow startup after Z2R13, during which new Source and Intermediate Range NIS detectors will be installed.
5. There are no outstanding proposed License Amendments required for startup from 22R13. This item is not applicable.
6. Not applicable.
7. The number of fuel assemblies (a) in the core is 193, and '

(b) in the spent fuel storage pool from Zion Unit 2 is 024.

8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 3012 fuel assemblies (only 2762 locations will be accessible)  ;
9. Zion Station will-lose dual full core discharge capability in November 2001, at the beginning of Unit 1 Cycle 19, based on the latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single core will be lost in May 2003, at the beginning of Unit : Cycle 20. ,

These projections are based on the current number of available storage '

r lls in the spent fuel pool and does not include the use of the offset tool. ,

1

'l 1

1 3 of 3 ZCLERK-(13)