A97036, Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2
ML20210K402
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/31/1997
From: Cygan J, Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ZRA97036, NUDOCS 9708190242
Download: ML20210K402 (13)


Text

__ _ ___ _,.__,__ .,__ ________

Commonwcahh fileum Company "

$ Ziott Generating Station e

101 Mutoh Ikiulevard Zeon, IL (MM 2797.

Tel 847-7442081 ZRA97036 August 14, 1997 Nuclear Regulatory Cormission Document Control Desk Washington, DC 20555

Dear Sir:

Attached is the July Operating Status Report.

MIbn M. S. Starkey Plant General Manager Zion Station RSS/jic Enclosure L cc: Regulatory Assurance USNRC Document Control H. Keiser A. B. Beach (NRC)

D. Farrar D. R. Eggett INP0 Div. of Enforcement Health j State of Illinois /IDNS  ;

F. Yost NRC Inspector. Zion f.7 7f g s i IDNS Inspector. Zion Operating Engrs.

C. Y. Shiraki M. Kramer (FAC)

Master File p

_ -. n n .

9708190242 970731 DR ADOCK 050002 5 g , ff}l]fl,ll lll a i:nwom Company

_ _ _ _ _ --J

4

.. a OPERATING DATA REPORT DOCKET NO. 50 295 DATE 8/14/97 COMPLETED BY J. CYGAN TELEPHONE (847)746 2084 X3169 OPERATING STATUS

1. Unit Name: Zion Unit 1
2. Reporting Period: 0000 070197 to 2400 073197 y .es-
3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating (Gross MWe): 108h
5. Design Electrical Rating (Net MWe): LO40
6. 2LS
7. Maximum Dependable Maximum Dependable Capacity Capacity (Net MWe): (Gross

_, MWe): J4Q

8. if Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last Report. Give Reasons: N/A
9. Power Level To Wh1ch Restricted, If Any (Net !)We)? -N/A
10. Reasons For Restrictions. If Any: N/A _

This Month Yr to-Uste Cumulative

11. Hours in Reporting Period 744.0 5.097.(L 206.735.0
12. Number Of Hours Reactor Was Critical 00.0 1.2333~ 138.741.3
13. Reactor Reserve Shutdown Hours 00.0 0.0

- 2.612.8

14. Hours Generator On Line 00.0 1.233.3 134.804.2
15. Unit Reserve Shutdown Hours ' 00.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 00.0 3.442...79.0 398.004.120_
17. Gross Electrical Energy Generated (MWH; _. .., 00.0 .137. L50.0 L29.673.297
18. Net Electrical Energy Generated (MWH) .079.324.0 L23.571.046
19. Unit Service Factor 1 .- 24 3 65.2
20. Unit Availability Factor 00.0 24 3 -~ 65.2
21. Unit' Capacity Factor (Using MDC Net) 00.0 20.4 57.5
22. Unit Capacity Factor (Using DER Net) 00.0 20.4 -57 5 23; Unit Forced Outage Rate 00.0 000 15 8
24. Shutdowns Scheduled Over Next 6 Months IType, Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: No estimated date
26. lH ts In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

OPERATING DATA REPORT DOCKET NO. 50 304 DATE 8/14/97 COMPLETED BY J. CYGAN TELEPHONE (847)746 2084 X3169 OPERATING STATUS

1. Unit Name: Zion Unit 2
2. Reporting Period: 0000 070197 to 2400 073197 Notes
3. L1 censed Thermal Power (MWt): 3250 4 Nameplate Rr. ting (Gross MWe): 1085
5. Design Electrical Rating (Net MWe): LO40
6. Maximum Dependable Capacity (Gross MWe): .,085-
7. Maximum Dependable Capacity (Net MWe): 1040 -

8.

If Changes Reasons: Occur in Capacity N

/ARatings (ltems Number 3 Through 7) Since Last Report, Give

9. Power Level To Which Restricted, if Any (Net MWe): N/A 10, Reasons For Restrictions. If Any: N/A This Month Yr-to Date Cumulative 11, Hours In Reporting Period- 744.0 5.087.0 200.448.0-12, Number Of Hours Reactor Was Critical -00.0 138.378.7

, CJ 0_ _

13. Reactor Reserve Shutdown Hours 00.0 00. 0 226.1
14. Hours Generator On-Line 00.0 00. 0 135.098.8'
15. Unit Reserve Shutdown Hours 00.0 00 0 0.0
16. G! ass Thermal Energy Generated (MWH) 00.0 00.0 402.647.369
17. Gross Electrical Energy Generated (MWH) 00.0 00.0  :.30.102.951
18. Net Electrical Energy Generated (MWH) 00.0 00.0 24.095.088
19. Unit Service Factor 00.0 00.0 67.4
20. Unit Availability Factor 00.0 00.0- 67.4
21. Unit Capacity Factor (Using MDC Net) 0).0 00T 69.5
22. Unit Capacity Factor (Using DER Net) 00.0 00. 0 59 5
23. Unit Forced Outage Rate 00.0 00.0 13.3

. 24 .- Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

25. If Shut Down At End Of Report Period. Estimated Date of Startup: No estimated date
26. Units in Test Status (Prior to Commercial Operation): Forecast. Achieved INITIAL CRITICALITY' INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-205 UNIT NAME Zion Umt 1 DATE 8/14/97 COMPLETED BY J. CVGAN

TELEPHONE (847) 746-2064 x3169 REPORT MONTH July 1997 1 DurEticil 2 Method of Licensee System Component Cause & Corrective No. Date Type (H0ers) lReasan Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor

-= -

4 07/01/97' S 744.0 +H 1 97-005 Unit 1 Remained Off-Line For The y Entire Mo7th For Maintenance Outage

. Z1M06.

  • H - Please refer to column on right (Cause & Corrective Actions) 1 2 3 4 F: Forced Reason: Mathod Exhibit G - Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File 0-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Sam Source H-Other (Explain)

UNIT SHUTIXMNS AND POWER REDUCTIONS DOCKET NO. 50-304 UNIT NME Zion Unit 2 DATE 8/14/97 COMPLETED BY J. CYGAN TELEPHONE 184_7) 746-2084 x3169 i REPORT MONTH July 1997 1 '; Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor 7 07/01/97 5 744.0 C 1 Unit 2 Remained Off-Line For The Entire Month For The Continuation Of Refueling Outage Z2R14.

1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 295 UNIT Zion Unit 1 DATE 8/14/97 COMPLETED BY J. CYGAN TELEPHONE (847) 746 2084 x3169 MONTH July 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 6 17 -7 2 -5 18 -6 3 -6 19 -6 4 -7 20 -6 5 -6 21 6 6 -6 22 -6 7 -6 23 -6 8 -5 24 -6 9 -6 25 -6 10 -4 26 -6 11 -5 27 -6 12 -7 28 -6 13 -7 29 -6 14 -6 30 -6 15 -6 31 -6

16. -7 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

AVERAGE DAILY UNIT POWER LEVEL

" DOCKET N0._EL304 UNIT Zion Unit 2 DATE 8/14/97 COMPLETED BY J. CYGAN

. TELEPHONE (847) 746 2084 j .x3169 July 1997

]

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 4 .1

. -5 17 6

2 18 -5 h 3 -6 19 6-i 4 6 20 5 5 -5 21 5 l-6 -5 22 ~5 l.

4 7 5 23 -5

8 4 24 -5 9 5 25 -5 l 10 -4 26 5 11 5 27 -5 l 12 -6 28 -5 l

j 13 -6 29 -5 l 14 -6 30 -5 15 -6 31 -5 16 -6 4l - INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the 4

reporting month. Compute to the nearest whole megawatt, d

. p

'Juiv 1997

SUMMARY

OF OPERATING EXPERI,[UCE 1)!iU_1 Unit 1 began July off line for a continuation of Maintenance Outage (Z1M06) and remained off line for the entire reporting period. There is no scheduled

.date for Unit I to be back on line.

UNIT 2 Unit 2 began July off-line for a continuation of Refueling Outage (Z2R14) and remained off-line for the entire reporting period. There is no scheduled date-for Unit 2 to be back on line.

4 i

suly 1997 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 1) J i 'O' 0/G Replace Damper Mounting Bolts Completed 005: 07/11/97 - 07/13/97

'O' D/G Various Oil Leaks Completed ,

005: 07/11/97 07/12/97 IB D/G Service Water Portion Window Work 005: 07/30/97

  • l l

l 1B D/G Generator Inspection Completed l 005: 07/30/97 - 07/30/97 l i

t t

l l

I' i

COMMENT: NO RETURN TO SERVICE DATE

-__ -.- -. .....- - - - .. --_ - .--..--..-.- - .- - - . - - ~ . . - - - -

N i .

  • 1 4 July 1997 MAJORMAINTENARE 4

! E0VIPMENT NAME WORK PERFORMED  !

I j -(UNIT 2) 4 2A C/CB PP Cleaning / Inspection 005: 04/26/97 07/29/97 2B HD PP- 011 Change

,. Completed

-)

00S: 06/02/97 - 07/27/97 i

i-1 i

4 1

i I j i i

t i '

i +

i

-)

i l-i ,

1 I

i i

1 1

i i

i i

t i-(

i:.

COMMENT

s g_ _._

. . . , - . . . . , , - . , _ - - . _ , . . . . . . . , - . . , , . . . . . ~ . . . . _ . . - . - . . . - - ~ _ , . . . - - . . ~ . . ~ . .

,. .. REFUi. LING INFORMATION REQUEST ,

i OVEST10NS:

1. Name of facility.
2. Scheduled date for next refueling shutdown.
3. Scheduled date for restart following refueling. ,

4 Will- refueling or resumption of operation thereafter require a technical specification change or other license anendTent?

If answer is yes, what, in general, will these be?

  • If answer is no, has the reload fuel design and core configuration been "

reviewed by your Plant Safety Review Conrnittee to determine whether any unreviewed safety questions are associated with the core reload (Ref,10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

5. Scheduled date(s) for submitting proposed licensing action and supporting information. ,

t

6. Important licensing considerations associated with refueling, e.g , new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
8. The present licensed spent fuel pool storage ca>acity and the size of any

. increase in licensed storage capacity that has )een requested or is planned, in the number of fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

Page 1 of 3

., REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS-

1. Zion Unit 1.
2. Cycle 15 has no scheduled shutdown date for refueling.
3. Cycle 16 has no scheduled date.
4. The following License Amendments are required to allow resumption of operation after Refueling Outage Z1R15. <

o increase Steam Generator plugging limit. Required to ensure Unit derating will not be required based on Steam Generator plugging.

Required to allow additional sleeving options to minimize plugging.

e Authorize new F* limit on tube re roll and new EF* re-roll limit.

Re uired to support increased plugging limit. Required to allow ad itional re roll options to minimize plugging The Reload Safety Analysis for cycle 16 will be completed during Z1R15.

5. Projected submittal of License Amendments: September 1997.
6. Not applicable.
7. The number of fuel assemblies (a) in the core is 0, and (b) in the spent fuel storage pool from Zion Unit 1 is 1125.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 3012 fuel assemblies. Of these 3012 storage locations.11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A. C).
9. The projected date of the last refueling than can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1997 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22 9r).o.008A. C) will be installed prior to June 2003.

This projected date is subject to change based on outage durations or Overhaul Schedulc changes.

2 of 3

O REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:

1. Zion Unit 2,
2. Cycle 14 shutdown September 19, 1996 for refueling.
3. Cycle 15 has no scheduled date for start up.

4 A License Amendment converting the current Technical Specifications to improved Technical Specifications is re operation after Refueling Outage Z2R14, quired to allow resumption of

5. The proposed License Amendment converting the current Technical Specifications to improved Technical Specifications has been submitted.
6. New fuel reloaded into Unit 2 Cycle 15 core incorporates the following design changes:

e Selected star.dard Integral Fuel Burnable Absorber (IFBA) patterns have been updated following a Westinghouse Core Engineering investigation of peripheral IFBA rod loading within the fuel assembly. The net effect of this change is to achieve the most efficient absorber orientation at Beginning of Life (BOL) and fcr burnups through 5000 MWD /MTV. These satterns provide self-limiting features that mitigate the extent of )NB propagation. In addition, these IFBA Satterns provide significant peaking factor and reactivity lolddown benefits.

  • IFBA rods will have a nominal B-10 enrichnent loading with a reduction in backfill pressure from 200 to 100 psig. The nominal B-10 loading is 1.77 mg/ inch. Rod internal gas pressure has an effect on two of the fuel rod design criteria that are evaluated for the reload: Rod internal pressure and clad stress criteria.

The Zion Unit 2 Cycle Specific fuel design analysis has been performed and has demonstrated that the design criteria were met.

7. The number of fuel assemblies (a) in the core is 193 and (b) in the spent fuel storage pool from Zion Unit 2 is 984.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 3012 fuel assemblies. Of these 3012 storage locations.11 are unavailable and 239 are inaccessible Tool Modification (M22-90-0 008A. C).pending completion of the Offset
9. The projected date of the last refueling that can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22 90-0-00BA. C) will be installed prior to June 2003.

This projected date is subject to change based on outage durations or Overhaul Schedule changes.

3 of 3