MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 ML20137P8441997-02-14014 February 1997 Rev 5 to Authorization of Changes,Test & Experiments (10CFR50.59 & 72.48 Reviews) ML20140G9351997-02-14014 February 1997 Rev 13 to ISTs IT 585, Leakage Reduction & Preventive Maint Program Test of Post-Accident Containment Atmospheric Sampling Sys (Refueling) ML20140G8921997-02-14014 February 1997 Rev 7 to ISTs IT 215, SI Valves (Cold Shutdown) ML20140G9401997-02-0707 February 1997 Rev 21 to TS Tests TS 10A, Containment Airlock Door Seal Testing ML20138K2991997-01-31031 January 1997 Rev 46 to OP 4D,Part 1, Draining RCS to CVCS Hut W/O Entering Reduced Inventory ML20138K2031997-01-31031 January 1997 Rev 6 to IT 380, Purge Valve Air Sys Check Valve (Quarterly) for Unit 1 ML20138K2551997-01-31031 January 1997 Rev 2 to IT 530B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) for Unit 1 ML20138K2411997-01-31031 January 1997 Rev 12 to IT 530, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 1 ML20138K3231997-01-31031 January 1997 Rev 9 to RP 6A, SG Crevice Flush (Vacuum Mode) ML20137P8551997-01-31031 January 1997 Brine Tank Standpipe Mod ML20138K3071997-01-31031 January 1997 Rev 38 to OP 9C, Containment Venting & Purging ML20138K2901997-01-31031 January 1997 Rev 2 to IT 535A, Leakage Reduction & Preventive Maint Program Test of Train a HHSI & RHR Sys (Refueling) Unit 2 ML20138K2641997-01-31031 January 1997 Rev 12 to IT 535, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 2 ML20138K4991997-01-31031 January 1997 Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device for Unit 2 ML20138K3181997-01-31031 January 1997 Rev 33 to RP 1B, Recovery from Refueling ML20138K3031997-01-31031 January 1997 Rev 1 to OP 4D,Part 5, Draining RCS to CVCS Hut W/O Entering Reduced Inventory & W/O SG Tubes ML20138K2251997-01-31031 January 1997 Rev 7 to IT 385, Purge Valve Air Sys Check Valve (Quarterly) for Unit 2 ML20138K4791997-01-31031 January 1997 Rev 15 to Ort 67, Component Cooling Water to & from Excess Letdown Heat Exchanger-Refueling Shutdown for Unit 1 ML20138K4701997-01-31031 January 1997 Rev 17 to Ort 59, Train Spray Sys CIV Leakage Test for Unit 1 ML20138K5041997-01-31031 January 1997 Rev 7 to Ort 50, PRT to Gas Analyzer Sample Line for Unit 2 ML20138K5161997-01-31031 January 1997 Rev 18 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 2 ML20138K4751997-01-31031 January 1997 Rev 19 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 1 ML20138K5231997-01-31031 January 1997 Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2 ML20138K7311997-01-31031 January 1997 Rev 9 to TS 80, Sampling of Emergency Fuel Oil Tank (T-72), Fuel Oil Storage Tanks (T-175A,B) & EDG Day Tanks (T-31A,B & T-176A,B)(Quarterly) ML20138K7171997-01-31031 January 1997 Rev 6 to TS 37, Containment Spray Nozzles Check (Frequency of Less than or Equal to Five Yrs) for Unit 1 ML20138K3121997-01-31031 January 1997 Rev 43 to RP 1A, Preparation for Refueling 1998-09-30
[Table view] |
Text
POINT BEACH NUCLEAR PLANT
[h
/ WO WorkPlan Work Control Document: WO# 9606626 Removal and Installation of Conduit near the Unit 2 26' Elevation Containment Hatch Third Door (Door 235)
Work hgginator: Todd A. Schaffer Date: 9/18/96 IIold Step Point No. Work Plan Description Worker Date NOTE: Scope:
The scopeof this work plan is to lift and tape w;res in Door 232 Door Box and to pull back cable and remove approximately 10 feet of conduit near the Unit 2 26' elevation Containment Hatch 3rd Door (Door 235) in conjunction with the removal of the 26' equipment hatch. In conjunction with the re-installation of the equipment hatch near the end of the outage, the work plan will proside the necessary steps to install conduit, pull cable into the raceway, connect all wires, and to test the functionality of the switch.
The equipment hatch wil! be removed per RMP 224.
The scope of this work plan is non-QA. , , _g
9TE: Attachments:
Attachments:
Sheet I WO 9606626 Conduit Removal & Installation NOTE: Equipment:
Tools for wire termination / determination and for conduit removal.
l l
l NOTE: Requirements:
Notify securay prior to opening Door Box 232.
This work will be done in conjunction with RMP 224 " Removal and Replacement of Containment Equipment Hatch." The removal of the Equipment Hatch requires that the pertinent unit be in cold shutdown, and that no refueling operations (as defmed by PBNP Technical Specifications) are being performed.
This work order has no safety concerns, and this work will not effect the nonnal or abnormal operation of Point Beach.
Obey all Health Physics postings and barriers as necessary. Obtain a Radiological Work Permit (RWP) if necessary to complete work in this area.
9702190171 970210 PDR ADOCK 05000301 p PDR PDF m2o Page1of4 Revison 1 09/02/94
POINT BEACH NUCLEAR PLANT
/~h
.A WO Work Plan Work Control Document: WO# 9606626 Removal and Installation of Conduit near the Unit 2 26' Elevation Containment Hatch Third Door (Door 235)
Work Plan Originator: Todd A. Schaffer Date: 9/18/96 IIold Step Point No. Work Plan Description Worker Date Special Instructions:
FME: 1. Refer to NP 8.4.10 " Exclusion of Foreign Material from Plant Components and Systems" and NP 8.4.12 " Equipment, Job Site and Plant Cleanliness Practices and Plant Storage Requirements" to maintain adequate FME and Plant Cleanliness practices. , .
I&C g.n Conduit Removal at:d In:tallation NOTE: RMP 224 will disconnect Door 235 Magnetic Switch wires and will disconnect the associated flexible conduit.
OPS 2. Verify that the plant is in cold shutdown that no refueling operations are in progress. Due to the Steam Generator Project, the plant will be defueled. OPS / DSS
- 3. Notify security that Door 232 Door Box needs to be opened so that a guard can be dispatched to monitor Door 232 Door Box while it is opened. Open Door Box (Security will receive a tamper alarm).
O . d.
Security a
- 4. Lift and tape the following wire connections:
Color Ierminal Point Blk TSS-I I A TS5-12A L3//4 Red I&C u Verifi- 5. Independent Verification:
Verify the following wires were lifted and taped:
Color Terminal Point Blk TSS-II A Red TSS-12A A>/A
,8 Verifier <l A)/A
- 6. Close Door 232 Door Box and Verify that the tamper alarm has cleared. N/A I&C g
y ,p
- 7. Pull back Cable and remove conduit near the Unit 2 26' elevation Equipment flats as shown on the attached Sheet 1. Remove quick disconnect connectors if -
neessary to pull cable. I&C ja-/7 PBF-90:o Page 2 of 4 Revisum 1 09G/94
POINT BEACH NUCLEAR PLANT
,8 h WO Work Plan Work Control Document: WO# 9606626 i Removal and Installation of Conduit near the Unit 2 26' Elevation l
Containment Hatch Third Door (Door 235)
Work Plan Originator: Todd A. Schaffer Date: 9/18/96 l Hold Step Point No. Work Plan Description Worker Date NOTE: The following steps cannot be completed until the Unit 2 26' Equipment Hatch l is ready to be installed per RMP 224.
l
- 8. Install conduit and cable that were removed in Step 6 of the work plan. Install any _ _
quick disconnect connectors removed in Step 6. 1&C ,t g ,
- 9. Notify security that Door 232 Door Box needs to be opened so that a guard can be l dispatched to monitor Door 232 Door Box while it is opened. Open Door Box %%
(Security will receive a tamper alarm). Security i 3.g
- 10. Remove tape and land the following wires:
Cg!gt Terminal Point j Bik TSS-I I A W Red TSS-12A I q_a
. .rifi- 11. Independent Verification:
Verify that the tape was removed, and the follwoing wires were landed:
5 Color Terminal Point Blk TS5-ll A m l Red TSS-12A q,n FME: 12. Perfonn a visual FME closcout inspection of the Door Box. Verify the area free of foreign debris or working materials.
km Jg, '
I&C
- 13. Close Door 232 door box and verify that the tamper has cleared. tp I&C ,t.n NOTE: Post Maintenance Testing cannot be performed until RMP 224 has been competed. RMP 224 will reconnect the flexible conduit from the magnetic switch and connect the quick disconnects.
PMT Post Maintenance Testing: )
- 14. Notify security to put Door 235 on line and monitor incoming alarms.
I&C q.g
- 15. Hold the 26' elevation containment hatch door (Door 235) open for 2 minutes and _
verify that a timeout alarm is received in the CAS. , 1&C q,g
- 16. Close the door and verify that the timeout alann clears. __
lac /2-17 PBFo:o Page 3 of4 ;
Revisum 1 09/02/94
POINT BEACH NUCLEAR PLANT
- d WO Work Plan Work Control Document
- WO# 9606626 Removal and Installation of Conduit near the Unit 2 26' Elevation Containment Hatch Third Door (Door 235)
Work Plan Originator: Todd A. Schaffer Date: 9/18/96 Hold Step Point No. Work Plan Description Worker Date Acceptance Criteria:
- 17. Security has verified that the alarm was neceived after the door was open for 2 s,,
minutes and has accepted the work completed under this work order. Security l g,n The work performed under this IWP is complete. All equipment is Operational.
l l
I i
PBF-Wu0 Page 4 of 4 Revmon I mnum
9 \
v a
ft ' Eln/U&) to N rdia m f^tr //4 rc a Ito pog ONIf 2 Jwcr/04 oui?*oY$osarci ,
na er
{$ f,& /4 O
i
{
j
-+-
i m ;
i ocos tzs*
g-
_/
f f
l 4 4 l 4 )
l ltChovG $ Rf /4 Sf4L L DWG: SHErr/ TITLE: 4,o ygog474 covouip OF RE*0 VA L 4- TMTAL L A Trod SHEET OMR ECR O
_ wo - 94044 76 m DP4WN DATE CHECKED DATE g
- *)llg}% f T h M D. DATE TFl:
$ REV DATE DESCRIPTION