Text

- -- - _ . _ _ _ _ _ _ - - - _- _. . _ _ _ - _ . . _.

MWR WORK PLAN #"

i ADDITION OF CIV AND TEST CONNECTION IWP ON94 066 NITROGEN SUPPLY TO ACCUMULATOR AND l, RAISING OF NITROGEN PIPING INTERFERING WITli CCW SUPPLY PIPING WO# 9507560 (CIV)

WO# 935035 (Raise Line) 1 UNIT 2 October 10,1995

{ '

P.

l 1.

SCOPE k i

' 1.1 j SI Accumulators; and 2) To re-support a porti , ;

1 interferes with the Radwaste CCW supply piping. (

j )

1.2 j The purpose of this modification is: L

1) To allow the CIV's associated with h A i

I containment penetration 14c to be Type C tested under 10 CFR 50,

2) To piping. alleviate the rubbing of valve body 2SI-846 on 2P-1 A Rad  ;

4 1.3 The approach outage of th::isolated.

with the lines properly installation is to install this modification during 1.4 i

QA Scope Clarifications: QA

{ 1,5 Support Requirements

  • 1.5.1

{

I Operations: llang the danger tag series, perforr hydro test, review package. *

1.5.2 Maintenance

Install the modification.

t

, 1.5 3 IIP; Support Installation of the mod in hi-rad or containinated areas. 8 1.5.4 QAS: Review the installation package, Perfor'n NDE on completed w 2.

PRE-INSTALIATifXJtEQUIREMENTS 2.1

References:

! l 2.1.1 Working drawings:

a. SK-94-066-01,
{..

Nitrogen Supply Pipmg with CIV as found. t 1 b SK.94 066-02, Nitrogen Supply Piping with CIV as lef t r

c. $K-944)66 03, Nitrogen Piping woh inierference as found 1>
d. SK.94 0664M. Nitrogen Piping with in'erference as lef t.

Pace 1 of 12 97d2190136 970210 PDR ADOCK 05000301 p PDR

)

L *"*

r: 4 -

MWR WORK PLAN #"

l ADDITION OF CIV AND TEST CONNECTION IWPON94-066 NITROGEN SUPPLY TO ACCUMULATOR AND j RAISING OF NITROGEN PIPING INTERFERING .

WO# 9507560 (CIV)

\ WITII CCW SUPPLY PIPING '

! WO# 935035 (Raise Line)

\

UNIT 2 October 10,1995 i C

1. SCOPE l' l

i 1.1 SI Accumulators; and 2) To re-support a port b

O i  ;

1 interferes with the Radwaste CCW supply piping. h i 1.2 1, The purpose of this modification is: 1) To allow the CIV's associated wit l

containment penetration 14c to be Type C tested under 10 CFR!'

I 50 j

2) To piping. alleviate the rubbing of valve body 2SI-846 on 2P-1 A Ra  ;

1.3 'i The approach outage of thn:

with the lines properly installation isolated, is to install this modification duri t

1.4 QA Scope Clarifications
QA ,

1 1 1.5 Support Requirements j

1 1.5.1 j Operations: llang the danger tag series, perform hydro test, review -

package.

l 1.5.2

' Maintenance: Install the modification. .

l.5.3 i' IIP: Support Installation of the mod in hi-rad or contaminated areas.

1.5.4 QAS: Review the installation package, Perfonn NDE on completed w 2.

J'BE-INSTALLATION REOUIREMENTS_

2.1

References:

2.1.1 Working drawings: .

l

a. SK-94-066 01, Nitrogen Supply Piping with CIV as found.
b. SK-94-066-02, Nitrogen Supply Piping with Civ as left. ~

r

c. SK-94-066-03, Nitrogen Piping with Interference as found. 1,
d. SK-94-0664)4, Nitrogen piping with Interference as lett.

' Page 1 of 12 9702190136 970210 PDR ADOCK 05000301 p PDR

- - - . _ _ _ - - . - . = - - - - - . - - - - . - - - - - - - - - - - - .

a '

h MWR WORK PLAN

~

,~

l ADDITION OF CIV AND TEST CONNECTION ON IWP 94-066 NITROGEN SUPPLY TO ACCUMULATOR AND .

! RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV)  ;

WITil CCW SUPPLY PIPING WO# 935035 (Raise Line) i UNIT 2

=

l October 10,1995

{ -

e. SK-94-066-05 Yoke Support Detail for Pipeway #3 support.

] f. SK-94-066-06, Piping Support Detail for Pipeway #3 suppon.  ;

)

i l

l 2.1.2 Permanent drawings: Westinghouse 110E035 sh.1 -

! Rockwell C-464527  ;,

j Copes-Vulcan L-138930 j

2.1.3 Supplemental Procedures fI  ;

j a. MI 7.1 Installation of Ilitti concrete expansion bolts.

j

b. NP 8.4.10 Exclusion of Foreign Material from Plant Components and i i Systems.

1 l:

c. MI 32.8 Guidelines for Opening Piping Systems. -
d. Welding Procedure WP-1 Carbon Steels Group P-1 to P-1 j, GTAW SMAW (or Contractor equivalent).

3

c. Procedure Specification for Structural Welding WP-5 (or Contractor  ;

equivalent). '

?

f. MI 36.3 Paint and Coatings Maintenance Instruction  !

2.2 Installation Pr_eparation Activities.

2.2.1 A Ilill of Material is attached to this IWP or is included on the construction drawmps. All materials on the HOMs are onsite. available .

for the modification, and QA released

, Page 2 of l' f

. _ _ _ _ _ _ _ _ . _ _ ______m ----*_ _ - _ _ _ - - - - - - -

e- -- -- - -w --

MWR WORK PLAN ADDITION OF CIV AND TEST CONNECTION ON IWP 94-066 i

NITROGEN SUPPLY.TO ACCUMULATOR AND .

! RAISING OF N!TROGEN PIPING INTERFERING WO# 9507560 (CIV) i WITl! CCW SUPPLY PIPING WO# 935035 (Raise Line) i  ;

UNIT 2 October 10.1995 2.2.2 Radiological Considerations.

This modification will be installed both in the unit 2 contairunent and'also j in the #3 pipeway. Precaution should be taken to minimize exposure.

I i 2.2.3 New equipment numbers are required and have been obtained from j CIIAMPS.  ;

i 2.2.4 New CllAMPS labels are required and have been requested.

i i

l 2.3 Pre-Installation Discussions  ;

t l 2.3.1 A Pre-Installation discussion with the installation group representative has -

bece performed, if necessary.

e 1

1 RE Date focJs-j to il bJ;u vo r.., ,'. t u tar r ci su 9 l 2.3.2 A field walkdown has been perfonned, if necessaiy, to verify that all aspects of the procedure may be performed as intended.

^

l Installation Supervisor (l.S2 _ Date r ,c c,

! v i

1 2.4 hientification of Permits Reunirgd l

a 2.4.1 The WO for the IWP has been written and submitted to CIIAMPS. See the IWP cover sheet for the WO No 24.2 The work will be done in a radiological zone and an RWP may be required.

2.4.3 The work will be done in Safe Shutdown area (s) i j 2 4.4 Transient Combustible Pennit is required 2 4.5 Ignition Control Permit is required i

k.

g D 1

_ _ _ - _ . e

' ~

MWR WORK PLAN l

i ADDITION OF CIV AND TEST CONNECTION ON IWP 94-066  :

NITROGEN SUPPLY TO ACCUMULATOR AND itAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV) (

WITil CCW SUPPLY PIPING WO# 935035 (Raise Line)  : 1

~

\

UNIT 2 October 10.1995 j,

The Installation Supervisor has assured that all necessary permits for this installation have been obtained. .

{

1S 2 Date Lobs ' '

/92" ,

it.%.th[ctt.,.Jn.m.Ld.py ic .c c/ l

?

2.5 Operational Installation Prerequisites a \

2.5.1 The plant conditions required are: The nitrogen supply line to the '

[

accumulators is isolated and vented. The air supply to the valve operators

{

have been isolated and vented.

2.5.2 Prepare a Danger Tag Series for the below listed equipment. Do not hang the tags until instructed to do so in the Installation Section.

a. 2SI-834 A, T-34A SI Accumulator Nitrogen Inlet SIIUT Control Switch i

b.2IA-01367, Instrument Air to 2SI-834A SilUT '

3 I

c 2SI-834B, T-3411 SI Accumulator Nitrogen inlet SIIUT Control Switch j
d. 2iA-01366, instrument Air to 2SI-834B SilUT {

t

e. 2SI-838A, T-34A/Il SI Accumulate Nitrogen Inlet SilUT i
f. 2SI-838H, T-34All! SI Accumulator Nitrogen Inlet SilUT
g. 2SI-838C, T-34A/B SI Accumulator Truck Fill inlet S!!UT  ;
h. 2f A-00938, Instrument air to 2S1-846 SilUT 1

i L

I j _ '

l i'

I

, Page 4 or 12 l

t

,i

p-MWR WORK PLAN l

i ADDITION OF CIV AND TEST CONNECTION ON IWP 94 066 NITROGEN SUPPLY TO ACCUMULATOR AND .

j '

RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV) j WITil CCW SUPPLY PIPING WO# 935035 (Raise Line) i

# l UNIT 2 October 10. 1995 9

2.5.3 Ilang the Danger Tag Series prepared in Step 2.5.2 above.

g 2.5.4 The system is isolated, drained and vented. -

n- )

Work may begin. , i

}

i DSS e Date / 0 ol9 (

t 1

3. INSTALLATION 1

3.1 Installation Descrintion '

l l

NOTE: Thefollowing is a detailed step-by-step listing of the actions necessary to perform this IWP. These steps can be cornpleted in any logical order. If

{ any of the steps cannot be completed as written or a change is necessary to complete the task, work must stop and the situation inust be discussed l with the responsible engineer or the installation supervisor.

1 l NOTE: The work in Containment (Section 3.2) and Pipeway #3 (Section 3.3) l CANNOT be done simultaneously due to containment closure reasons.

I i l l NOTE: '

PROPER FalE PRACTICES SilAl.L HE FOLLOWED DURING TIIE

- INSTAL.LATION OF TIIIS SIODIFICATION.

I

{

NOTE:

j TIIE WORK FOR TI:IS AIODIFICATION Wi!.L BE PERFORAIED -

IN TWO SEPARATE LOCATIONS. T!!E FIRST PORT 10N WILI, j

IIE INSIDE CONTAINSIENT, Tile SECOND WILL HE ;N TIIE #3 '

j PIPEWAY.

1 l N O Tli j Tile FOI. LOWING NDE IS REQUIRiiD ON AI.L WEl.DED JOINTS

-Visual Exam on all root passes.

! -Visual Exam on all finished surface welds. -

! Dye Penetrant Exam on all finished surface welds i  ;

, P. ige 5 of 12 4

i

h 1

MWR WORK PLAN

~

i 1

ADDITION OF CIV AND TEST CONNECTION ON IWP 94-066 I

NITROGEN SUPPLY TO ACCUMULATOR AND .

RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV) .

WITil CCW SUPPLY PIPING WO# 935035 (Raise Line)

UNIT 2 October 10,1995 l  :

j 3.2 "CONTAIN51ENT WORK" l 1

3' J 3.2.1 Release For Installation of Containment work.

) '

All of the above Operational Installation Prerequisites have been met and it is acceptable to proceed,with the installation.

j DSS v

__ Date D Time /M l,[

i NOTE: VALVE 2SI-834C WILL IlE RES!OVED FROSI ITS EXISTING i

) LOCATION IN THE VERTICAL RUN OF PIPE. IT WILL llE $

i RE-INSTALLED IN A NEW LOCATION.

(

i t

r l L i I l 3.2.2 Cut valve 2SI-834C from the vertical run of piping per SK-94-066 02.

F x I Cut points should be as near to valve ends as possible.

3.2.3 Prep and clean up sockets of removed 2SI-834C for reuse of valve. -

l (Use of containment approved cleaning solvent if required) s 3.2.4 Perform an infonnational PT on the welding surfaces of the 2SI-834C valve to ensure acceptability for re-use.

! 3.2.5 I

Install 2SI-834C, new 2SI-834D and new 2SI-1427 valves per drawing SK-94-066-02.

q 3.2.6 All root passes have been dyefpenetrant examined and are acceptable. '

M TN,-

'/ .

b

/

DateQ Slf .- -

1 i

i QAS . ,

Datef I l ' '! 8 i j 3 2.7 Non-Destructive Examination is required -

a. Visual for final welds,

) All welds are acceptable. 1 i

QAS m 11 w . . __. _

2

s 1

, Page 6 of 12 .L l

1 l 4

i

1 l

MWR WORK PLAN l ADDITION OF CIV AND TEST CONNECTION ON IWP 94-066 NITROGEN SUPPLY TO ACCUMULATOR AND RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CiV) -

WITil CCW SUPPLY PIPING WO# 935035 (Raise Line)

UNIT 2 October 10.1995 l

b. Dye Penetrant Exam required for final welds.

All welds aJe acceptable.

n ,

QAS _ w Date H)- lL/ - fI NOTE: The Acceptance Testing for this modification will be performed in section 4. A pressme test is not required for this line to be brought back into service, therefore it will only be performed as a matter of good engineering judgement when both portions of this mod have been completed.

Completion of containment work will be via acceptable NDE and ,

completion of Unit 2 ORT 32 for leakage testing of 2SI-834D.

Unit 2 ORT 32 Test Results: ,

i Work inside r contaifmynt

/! y is omplete. .

l , ,

1 DSA_ / i/

Date /((h[7 /

i I

j 3.3 **PIPEWAY #3 WORK **

3.3.1 Release For Installation of Pipeway #3 work.

l 4 1

l All of the above Operational Installation Prerequisites have been met and it is acceptable o nroceed wity,/he installation.

DSS _ Date / i'ime [',%

' /

!i l i

l l

j ,

Page 7 of 12 i

)

, , , i

m

[

~

MWR WORK PLAN ADDITION OF CIV AND TEST CONNECTION ON IWP 94-066 ,,

NITROGEN SUPPLY TO ACCUMULATOR AND .

I RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV)

WITl! CCW SUPPLY PIPING WO# 935035 (Raise Line)

UNIT 2 October 10,1995 NOTE: MINIMUM 5" CLEARANCE IS REQUIRED FOR REMOVAL OF i OPERATOR AND INTERNALS OF VALVE 2SI-846. TIIE VALVE SIIOULD IlE RAISED PER DRAWING TO RELIEVE INTERFERENCES WITII TIIE CCW PIPING IT CURRENTLY RESTS ON.  !

3.3.2 Temporarily support valve 2SI-846 so it may be cut free from the line. '

3.3 3 Valve is supported and the line may be cut.

MTN Date I O ~ Z 3

  • 95 3.3.4 Disconnect Instrument Air Supply to Valve 2SI-846.

3.3.5 Cut the piping where shown on SK-94-066-03. l 3.3.6 Remove support No.1 per SK-94-066-03. >

3.3.7 Raise valve 2" and install piping per SK-94-066-04.

3.3 8 Remove temporary support installed in Step 3.1.8.

3.3.9 Install permanent support for 2SI-846 per drawing SK-94-066-05. I

\

\

3.3.10 Reconnect Instrument Air Supply.

l

~ ,

j 3.3.11 v,Q oa'* \

All root passes have been tlyegnetrimt examined and are acceptable.

l l MTN_ - ~ a. 2 i Date 1 0 - 2. 4 4.f  :

QAS .,..,r Date 'c

  • _4 9.r-j t

1 3312 Non-Destructive Examination is required.

1 l a. Visual for final welds 1

All welds are acceptable.

QASl' Date ' _ ? ',

, Page 8 of 12 i .

j .

. MWR WORK PLAN  :

ADDITION OF CIV AND TEST CONNECTION ON IWP 94 066 NITROGEN SUPPLY TO ACCUMULATOR AND .

WITil CCW SUPPLY PIPING WO# 935035 (Raise Line)

UNIT 2 October 10,1995

,../ ,, '_

. . n . ,, u ,i' . , , , , . , No t ,, g ,,,) f,,_

MWIha-Ma_rn-rqMv-Em! " degg , 4

+.,+- <a . u - . u. 8,w

-All weldsarncteptabl- 'o r s ICfPIY ,

-QAS -

- - ./ Jtf""].f Date ~ ,, . 7 NOTE: The Acceptance Testing for this modification will be performed in section 4. A pressure test is not required for this line to be brought back into service, therefore it will only be performed as a matter of  ;

good engineeringjudgement when both portions of this mod have been '

completed.

Completion of Pipeway #3 work will be via acceptable NDE. I Work in Pipeway #3 is complete.

? /

DSS i- .

<. i Date // / '/ , c/j -

i L '

j -

l i

j 3.4 Clean up 1

l Any constmetion debris in or around the location of work, has been cleaned up.

{ l.S.

Date i .,- !;c t.c t

l <--

g s l 3.5 Installation Complete -

l^

3 5.1 List all cahbrated equipment used during installation of tlus modification in the MWR.

352 Record QAR Number (s) in MWR i

l'.l[e I) (if I)

]

'P i

MWR WORK PLAN i ADDITION OF CIV AND TEST CONNECTION ON IWP 94 066 NITROGEN SUPPLY TO ACCUMULATOR AND .

RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV) 5 WITl! CCW SUPPLY PIPING WO# 935035 (Raise Line)

UNIT 2 October 10,1995 3.5.3 The installation of this IWP is complete. '

4. Date /a 4,c./g
4. _TES'I ING V 4.1 Iestine Information 4.1.1 The intent of this testing is to verify pressure boundary integrity.

4.1.2 Acceptance criteria for this testing is .io it.akage from the test boundary during the pressure test.

4.1.3 A PBNP Initial Service leak Test is requested per NP 7.4.1 (see forms I attached).

4.2 Pre-Test Requirements

} 4.2.1 Clear tagouts necessary to facilitate testing.

J 4.2.2 Release for Testing l

DSS _ _ Date //./g -rTime cpod i

i l

4.3 Testigg Results

} *

{ 4.3.1 The testing of the installation has been completed and the results are i described below:

j _

4.3 2 Attach any addinonal testing documentanon to this IWP l

1 I

, Page 10 of 12 I

i 1

i i 4 l 1

MWR WORK PLAN  !

i, i

1 ADDITION OF CIV AND TEST CONNECTION ON IWP 94 066 I

NITROGEN SUPPLY TO ACCUMULATOR AND .

l RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV) -

WITil CCW SUPPLY PIPING WO# 935035 (Raise Line) l l

UNIT 2 October 10.1995 1

i i 4.3.3 List all calibrated equipment used during testing of this modification in the MWR.

j 4.3.4 The testing is completed and adequately tests the modification and the -

associated installation.

Testing Supervisor _

Date l/p/ 9( ,

l 4

l S. RESTORATION >

i l 5.1 Pre-AcceptanSg i

)

5.1.1 The following items need to be completed prior to acceptance:

l a. Updates to Control Room and Work Control Center drawings and  ;

, documents,

i l
b. Temporary / Permanent Changes to Procedures.

i c. Installation of temporary / permanent labels on equipment.

l d. All ECRs have final approvals. -

i All items that need to be completed prior to acceptance have been completed.

R.E Date i

5.2 Sntem Restoration 5.2.1 Close out all remaining tapouts and permits for this IWP 5.2.2 Reahgn system as required for nornal operations /per DSM System ready

[ lor release.

DSS lbte ft/fff_pr Tune jy yg l

i 1

j , P.ipe 11 of 12

,_.___..,...-L - - --- --------- - - - . ---

i i

j

'. MWR WORK PLAN *$

1 i.

l ADDITION OF CIV AND TEST CONNECTION ON IWP 94-066 i NITROGEN SUPPLY TO ACCUMULATOR AND

, f RAISING OF NITROGEN PIPING INTERFERING WO# 9507560 (CIV) i k WITII CCW SUPPLY PIPING WO# 935035 (Raise Line) i d' I , UNIT 2 October 10,1995 l

f-1 f- 6. ACCEL"rANCE 6.1 Final Acceptance ,

This installation and the associated modification have been installed and tested and are acceptable.

Mgr. of Acceptance Group / DSS Date 1/gfg J

i f

j 6.2 Follow-on Tasks i

a l NOTE: Follow-on tasks do not directly affect the installation and therefore can be done after acceptance.

6.2.1 Painting.

6.2.2 Install CII AMPS labels.

I i

Iteturn Compkted IWP and Modification to responsible engineer i

f

)

i I

i e

i l t 1 1

l 1

t l

}

f I l l l

Pace 12 of 12 l _ . _ _ -

/. ..

ansp p 'Fft & ftIfIElt% ar- Ltl, g  ;

- y y.. weww s BJhMVR{U U

.. - u g

  • u .u e :o %a7e7 yn :-i nr i e 2 ei o UNI p 4 -P #TT ? =

. ,3 4Ty :pt. ' r ~ (. 4 4 :.t, ; s . ", r:' c ' ~"~.

sa s 1 x -sy

~ ^

a . , .

g; "$. "

' " ' " ' ~ ~

, , . ,  ; ,r5.i .

.) 1, C Ws i o t oca+ ion- 26 /~.9'r %' '!i"o"er D: w Oc

"*h[9M 33fcriptiT".

CHANGE NORMAL PC CONTROL PtP FROH P'i-i? In 071 4"' pj ; H; c6-027 e tim.. c, ae. .;L. o. o._ o 3 Originstc' i"" Outage ID. U2R22 Tig/! ticker i a r a - 4 199127 Tag, N .%r Lc -

Jcb Type: MODIFICATION SUPPOR- Projec+ ID: Condt+ an Per e- + '

Work Function: 4GRY ORDEP Mad Req 1: 96 - 022

==============================================================.:===.r===.;

QA- l' SEIS: i Ope" nititv Pre-Tez+ N Procedures:

?P Y LCO: N i EO- N Operability Post-Ter+~ V Procedurea 7 SSA: Y PMT Y CIV- 4 MRULE- 9 A. r .W8/k

,,,,,y I"d 1

A/P' Y CACC RRH: - - - -

Tech Trec Ref- 3.7.A i 5 QA Codes: 10 21 Sect XI Class-T w l.<- hk ter-

===================================================================-v=.===.m-;=- .

- mu i ownd . PLann9r- dei) SON. C T E'*; E TRN

'm k P l a a /I.ar t r uc T k

.. ). N. r.

c p r.. p ./ r. .e n. ;<

..u 3; .e.l. AME %. .r. . o _ . . . . . . . _ .. U ' /O'/p 'If.

=========,=c===,==== . ============...,=-======r -:,==========.r== ,::==,

Piant Condi+ionJ REFUELING Ignitior Cantret Pe' r r c l

'J t h e r Cnd!tione- T " -i n c i im ? C o m t' u r * * !. e " e ' a i t  ?

Fire Darrier Penetration Perri-

WP t' E1uipment Irel.ation Required: 't CHE Y Isolation Tag Ser l es t 42A-R..i.s.f _ .

Operability Pre-'i'es t Comp l e te . /L Equipment Isola + ion as reques ed M [

Permission 1 ranted to perform Work Ops DSS Notificalion Req Y Op s DSS S i g n a t ur e ' y?// I41 _._ D a t e : /O.8. 45,

============-============================================================-

SoeciaL Noiification-t fLc F c r.. - i u G .o, . F. n. o.. L n n .#. <r -L'O kJ.kLe . C T T o_ N.e i

I i

Number of Steps- 001 l Acct 4 10 - 0000N - 9500261 - 00000 MFG Code- WEST Tech Manual Cntt ?: 00446

===================================================================
  • WORK ORDER CLOSEOUT
  • 1

=

======'"5==============* * * - '

  • t:====="4======= 0= =**- ===J*".==4".=

Group Head Signature: . _ _ . Date: . . / b"" =/N': ": = = = = = ;3 = = = = = = "; = = " I

= = ======= = ============ = __ _ =============== = === = = = = = ============,

i 1

1

1 ORIGINAL . ********** PBNP ********* WO-No: % 07007001 40 Priority: M

  • UNIT 2
  • MWO + UNIT ? +

. Resr. Group: MTN ********** S'IEP DETAIL ********n Step Print O o ' .' ' N Equipment' B-03 Jvstem: 4%V HP i n :

Equipment.Name: 480V SAFEGUARDS LOAD CEN7ER Phvrica! Location: 26/CD/CTR Sequence No- Oi- Need Det=

Short Darc: CHANGE NORMAL DC CTL PUR Oched Start Dm

================:_======================================================.-:=.

PLANNED: b OG '( oROCEDURES-Crew: ME Sh!ft: 2 Class- 420

===================================================================

Work Plan Description-SEE IWP 'M-922-2 FOR DETAILED WORK STEPS, FME/PM~ TAGOUT REQUIREMEi2TS NO QC HOLD OR INSPECTION POINTS REQUIRED.,

,=-======================.======================================================

QC REVIEW REQUIRED: Y BENSON, STEVE TRN DATE: 093096

===================================================================

WtJR.'( PERFORMED.: __ he C4 - o#2- R .e_ 5 .M_.. _ m_ _ . b_ .. . .o 4. _ ./ a . M_ ..M - _ ..M_ _ _ .. _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _. r d ed..ammk.dwudh.53_ so Cure.< ds c&i.. .

. - d. _ _ _ _ , . up_.M a.C.w!_e.L l Gw.a:. awe L.r.c_-w_uws_nay_so L_ m.Jamj a

Q'."U.__. .Me44_A9 3 _W w._.w.44c_.h h X M..p.E M u_h3-Tr.________________._________._

_._ _ryehd._.

__________._._.__.._._____.__.._.._~_____.__________.._.___._________.____._._._ _ .

=======================================================================:

87;. MC o?._.M. _ _ _ _ _. _. _. . .. _ _ _ .. - - - ecc tr) c. _S_-9. 0_. 5_ _ _ ... _ _ _ _ _. _ ._ _. . __. _ _ __ ___.__._ .._ _ .___ .___. ___.

================================================================-============:.

^r oTUAL USED: P R.E W : _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . _ _ _ . . _ _ _ _ _ _ . _ _

.P.ut.W Le T _ _ . . _ . _ _ _ - _ . _ _ _ . _ _ _ _ _ . _ _ . _ . _ _ _ _ _ _ . _ . _ . _ .

WORKER CLAIS- _32O _ _ _ __J16 ___ _________ ____.___ _____ _

qJMBE..Ps OF R>O'u~' v c.P~c __._2____.___L________._.__._____.__.__._

TOTAL. HOURS- __.l.____ ._ _S______ __ _ _.___ ._._____.___ .__._.______

TTL e_ v.J.c.nJ c,E.

. .e a /. c, ,4 6.n. ...M 3

c. M F e_ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ . _ . _ _ . _ _ _ _ . _ . _ _ . _ _ . _ _ . _ _ _
=================================================================:==
  • ARTS USED LIST ATTACHED: Y/H WO TAGS REMOVED- v

/N/d2 WORK COMPLETE DATE. .M//S'.% "

EMPLOYEE NUMDER-iC q n . EMPLOYEE NME .. n.u _~ - %* . . _ _ . _

=================.___ . - . -

.===================== = = c. .=.===-=

  • NORK COMPLETED
  • Cause Failure Code: PM / 61 l' NRM / $4.b___

As Found-Gut of Spec t- a i t w.. .l omp o na.. n t :

Y / W Hachina History Review Req.utred- Y/N Corrattive Action-o RP/RE/. _ _ .

O - Downtime- _ _ , _. h r r

- LINE SUPERVISOR: . NAME: _ ._______ DATE /0._ . '/.B. / N.

=========r ======. ==============L========._=====================
  • EQUIPMFNT RE URN 'O S F ICE
  • OperabiLitv.. Port Terting: __ . . _ . _ _

f _ _ _ . . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ - _ .

EQUIP. TAKEN 00S - DATE: __/__/__ TIME _. _ _ . RTN DATE- __/_ '_.._ TIME _ . . _ . _ .

r.perabitity Procr Performed _________.___ ____ _.____ __._.________._ __ _._______

NON OPS SUPV: ! _ ! _ ! _ I .. i l 'g' NAMI- _______ , ..____ ___ DATE: __/_ /.

DSS: " r ' -^ </ - _. ___ DATE: /_ / ,

N M E :c_: --

9407007 h .vMr 9fr 023 -9

'1 l POINT BEACH NUCLEAR PLANT MAINTENANCE ELECTRICAL SAFETY CHECKLIST ,

1.

If practical, de-energi:s all electrical equipment. Red-ug breakers and r.vitches as apprep l

NOTE: Some equipment may be powered from more than one source. lbTT1ALS  !

- a.

Check all equipment wid a meter to ecsure it is de-energized before working on it,

b. Observe proper working clearances during work, refer to 1.5.1 i of the Wisconsin Electic Safety Manual.

2.

If it is necessary to work on energized equikent, perfor:n 6e fouowing ,

applicable steps. Mark 'N/A' for 6ose items that do not apply to the evolution.

NOTE: Low-voltage gloves may be worn in lieu of high-voltage gloves while l working on conductors or equipment which are, or may become, energized i

st 130 V or less. l 2.

Ensure approved high-voltage gloves are obtained and air tested prior to use.

b. Ensure approved low-voltage gloves are obtained and air tested prior to use.

e, Rubber gloves have been verified, voltage tested within de last 60 days".

d. Approved leader glove protectors obtained and verified in good working condition.
c. Approved rubber sleeves protectors obtained and voltage tested within the last 60 dayst
f. Approved rubber blankets or o6er covering equipment obtained and voltage tested de last 60 days- (where necessary for covering equipment where parts of the body __

may not be protected by rubber gloves and sleeves.)

g. Ensure coJy electrically insulated tools are used.
h. Use warning signs and/or barricades while working on equipment and when equipment is left open.
i. Note acy additional considerations, procedures, workplans, etc. associated with the job being performed. .
k. Rescue brea6er kit available.
  • Items must be exchanged if test interval > 60 days.

I l

PSF-Oo44 Rcvision 2 o9/16/93 .

t

.k CONDITION REPORT CR 96-1153 STATUS: OPEN UNIT: 0 SYSTEM: 125VDC INITIATED: 10/21/96 CLOSED:

MSS #: ADMINISTRATOR.

INITIATOR: ISSUE MANAGER:

NUMBER OF OPEN ACTIONS: 2 NUMBER OF CLOSED ACTIONd: v Alarm Response Contrary To What Was Anticipated Per The Procedure DESCRIPTION:

When the DC control power to bus 2B03 was de-energized, the Unit 2 Common Critical Control Power Failure alarm (Window CO2 F 4-1) was not received. The previous step of the controlling procedure to de-energize the control power indicated this alarm should have been received.

i Significance: Unanticipated response contrary to procedure.

Corrective Actions: Reviewed drawings and determined the Unit 2 Common Critical Control Power Failure alarm (Window CO2 F 4-1) should not be received when the 2B03 DC Control Power is de-energized. The 2B03 fuse monitor relay ( 2B 03 -74 FM) inputs to the alarm and only monitors the DC Control Power to 2B03 lockout scheme which has a different supply than the overall bus control power.

STATUS UPDATE:

SCREENED BY : DATE: 10/21/96 REGULATORY REPORTABLE . . . . . (Y/N) : N TS VIOLATION . . . . . . . . . . . . . . (Y/N) : N 10 CFR 21.................(Y/N): N TS LCO....................(Y/N): N OPERABILITY IMPACT PER TS.(Y/N): N JCO REQUIRED . . . . . . . . . . . . . . (Y/N) : N  :

MSS REVIEW................(Y/N): N S CAQ . . . . . . . . . . . . . . . . . . . . . . ( Y /N ) : N OPERABILITY DETERMINATION. (Y/N) : N COMM ITMENT . . . . . . . . . . . . . . . . ( Y/N ) : N l SUPPORTING DETERMINATIONS:

There was no automatic control action associated with this alarm. The .

lack of the alarm did not affect the operability of safety related l equipment. An evaluation of the appropriateness of this response is questioned in one of the action items. If that appropriateness is determined to be different than what is stated, this will be updated.

This is not considered reportable.

REFERENCES:

IWP 96-022-2 WEST.DRW 206C061_SH 12 WEST DRW 499B4666 SH 344, 974 ALARM RESPONSE BOOK l

TRENDING INFORMATION: I WHEN__: 1996 OUTAGE WHO  :

WHY  : PROCEDURE WAS WRONG NOT AN ADVERSE CONDITION ,

I WHAT : OPERATIONAL STATUS CONTROL SYST55: 125 VDC ELECTRICAL I It hasn't been determined that this was an adverse condition, other than the un xpected response.

S e

N ACTIONS PRI ACTION STATUS RESPONSIBLE PERSON DUE DATE gg g ggg g g g g g 6 6 . W - @ 6 - --- - ... ........ ..........------------------

e 1 -100 ACTION NEEDED 2 - 100 ACTION NEEDED b

l 1

I l

l

. 1 Work Order No. 94 C 700 7 Return to Service Testing Reviews mrrats Pre-Refesse / Pre or Post-RTS g.

Work Groun Post-Wmtenance Testine

1. VECC3
  • LL- 2 Cene~ea Cazizens (s rnas kra faswae "

_ Aupuastwswa cerndS ,

/, VEs K s 2-97/1603 AfsETS (st a re n C L EA A a /voLTas es = 0)

3. _ VFAtsb D - 392/ sos debers C Acada cessa.s }voonas e o) y, Vt:1rs 2-273lso3 Msvrs (stase casei /yoins es e c) i C vu s pas ma Bassas na DBo3 nrsr<sf o"E crets vent
  • tTN&- PAa9EA 09e#Artvd.

Section XI Ecuinment Y!8) _ ~ _

Omrability Testine N

Intervice Teetin9 t_I b i/

e. --

l A

W O

^ A- <

i ENGINFFRING REVIEW -s . _

SECTION XT ENGINFFRING REVIEW e /