POINT BEACH NUCLEAR PLANT l INSTALLATION WORK PLANS f

MODIFICATION 96-073 IWP 96-073

.U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS 1.0 SCOPE

'~

1.1 The scope of this work plan is to modi.9 eleven selected pipe supports in the Residual Heat Removal (RH), Chemical and Volume Control (CV), Component Cooling Water (CCW), and Auxiliary Feedwater (AF) systems for Unit-2. gg7g 1.1.1 One pipe support (AC-152N-6-H5A) will be installed on EEiW HX shell side oudspeOS*005 reliefline piping for 2CC-7 to reduce piping vibration.

b *WW14 1.1.2 One pipe support (AC-601R-2-R40) on RHR piping inside containment will be modified to replace a pipe saddle with shim plate.

1.1.3 One pipe support (AC-601R-4 ) will be removed from the Refueling Water l

Circulating Pump Discharge -33) piping to RH systm.

w.e1$1'y 'W 1.1.4 One pipeq,upport (AC-601R-4-K) on the Refueling Water Circulating Puiny Discharge $-33) piping to RH system will be replaced entirely with an enhanced support design.

1.1.5 One pipe st4pport (AC-601R-4-B) will be removed from the RHR to letda n I crossconnect piping.

p 1.1.6 Two pipe supports (AO-o01R-4-C, and -D) on the RHR to letdown crossconnect l l piping will be replaced in their entirety with enhanced support designs.

1.1.7 One pipe support (CH-601R-1-F) will be removed from the letdown piping.

1.1.8 Two pipe supports (CH-601R-1-E, and -N) on the letdown piping will be replaced entirely with enhanced support designs.

1.1.9 One pipe snubber (EB-10-HS-21) will be removed from the AFW system. This support is located inside containment.

Page 1 of 23 i

9702190126 970210 9 i l

PDR ADOCK 05000301?'

a

~.

1 I

l POINT BEACH NUCLEAR PLANT l- INSTALLATION WORK PLANS l

MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS 1.2 The purpose of this modification is to modify, remove and install the pipe supports identified in Section 1.1 to bring all piping, pipe supports, and in-line components within their applicable licensing basis Code stress requirements.

1.3 QA-Scope Clarifications: All work discussed within this IWP is considered Safety-related and QA-scope.

1.4 The PBNP Maintenance group (MTN) will be performing the fabrications and installations for this IWP.

f 1.5 The Impact Project Number for this work is N9500215.

l 20 PRE-INSTALLATION REOUIREMENTS

I References 2.1.1. R/R/M Forms:
  • Six of these pipe supports are within the scope of the current ASME Section XI ISI program (ISI Class 2). Four of the remaining support in bold and italic face are not currently ISI classified. Specific Hold Points and Non-Destructive Testing (NDE) requirements are specified in the following R/R/M Forms:

l a. 96-0041 for pipe support AC-601R-2-R40 L

b. 96-0067 for pipe support EB-10-2HS-21
c. 96-0068 for pipe supports CH-601R-1-D/E/F/N and AC-601R-4-B/C
d. 96-0070 for pipe support AC-152N-6-HSA Page 2 of 23 I

l 1

.. .I

3 POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 l PIPE SUPPORTS 2.1.2 Working Drawings Nos.. Support Tag Numbert

a. SK-MR-96-073-01, Rev. 01 AC-152 N-6-H5 A
b. SK-MR-96-073-02 EB-10-2HS-21
c. SK-MR-96-073-03, Rev. 01 AC-601R-2-R40
d. SK-MR-96-073-04A AC-601R 4-B
e. SK-MR-96-073-04B AC-601R 4-B Location l 1
f. SK-MR-96-073-05A AC-601R 4-A /
g. SK-MR-96-073-05B AC-601R 4-A Location l
h. SK-MR-96-073-06A CH-60l R-1 -F )
i. SK-MR-96-073-06B CH-601R-1-F Location i I
j. SK-MR-96-073-07A. Rev. 01 AC-601R 4-C l

AC-601R 4-C Location I

k. SK-MR-96-073-07B l

l

1. SK-MR-96-073-08, Rev. 01 AC-601R 4-K
m. SK-MR-96-073-09, Rev. 01 CH-601R-1 -N
n. SK-MR-96-073-10, Rev. 01 CH-601R-1 -D
o. SK-MR-96-07311, Rev. 01 CH-601R-1 -E l

1 Page 3 of 23

~

1 I

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS i

MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS

-2.1.3 The responsible engineer has ensured that all of the above-listed references are approved, are with the installation group, and are either attached to this IWP or )

are otherwise r,egily avajlable to the installation group.

R.E _ . .

Date ' 7,,b-2.1.4 Background references (those not needed to perform work) include MR 96-073.

a. Bechtel Drawing P-249, sheet 1 for pipe support AC-152N-6-H5A.

(The installation cf this support is to reduce piping vibration)

b. Bechtel Drawing P-248, sheet 1 'or pipe support AC-601R-2-R40.

(This support will be modified to replace a pipe saddle with shim plate)

c. Bechtel Drawing P-242, sheet 1 for pipe support EB-10-2HS-21.

(This snubber will be removed) l 2.1.5 Supplemental Procedures

a. MI 7.1, Installation of Hilti Concrete Exnansion Bolts.

! b. MI 32.9, Erection of Tube and Clamo Section Scaffolding.

i t

c. Welding Procedure WP-4, Welding Procedure for Carbon Steels of ASME Groun P-1 to Austenitic Stainless Steels of ASME Groun P-8.
d. Welding Procedure WP-5, Procedure Speci6 cation for Structural Welding,
e. Structural Welding Code ANSI /AWS D1.1-92 2.2 Installation Prenaration Activities 2.2.1 A bill of materials is attached to the end of this IWP. All materials are on-site, available for the modification, and are QA released (as appropriate).

Page 4 of 23

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 i PIPE SUPPORTS l

2.2.2 The-Responsible Engineer or Installation Supervisor have assured that the above Installation Preparation A,ctivitjes are complete.

.te I Z0 I

R.E.d.S. .

'O 2.3 Pre-Installation Discussions 2.3.1 A pre-installation discussion with representatives of the design group, installation grouphand aci eptance n group has occurred.

R.E. ' ' g

_ Date / /

Lbh 2.3.2 A field walkdown was performed, to the extent possible, by the responsible engineer and installation group representatives. The design was produced as a l

! result of field walkdowns performed by Sargent & Lundy Engineers.

2.4 Personnel Safety Concerns Portions of this installation will take place at some elevation above the floor.

Installation personnel must take precautions against falling. The Installation Supervisor is awarc ef these concerns.

I.S. v - _ Date D

\

Identification of Reauired Permits D

' 2.5 2.5.1 The WO's for this IWP have been written and submitted to CHAMPS. The WO numbers are recorded on the IWP cover sheet.

2.5.2 Work will be performed in a radiological zone. An RWP will be required.

2.5.3 Installation will be done in Safe Shutdown areas.

2.5.4 Transient Combustible Permits may be required.

Page 5 of 23 l

i l

,a ,

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS ,

l MODIFICATION 96-073 IWP 96-073 l U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS t

2.5.5 Ignitiin Control Permits are required for field work involving cutting, grinding or welding. <

2.5.6 Scaffolding may be erected near or over Safety-Related equipment. If needede

.. . . . . . . . f: :::. ., ,, .  :' L ..,... . WeA To NP 1412EM 4MNI5 FM 5CMfoww4 AMAA WETf KGJ150 GQJlf/nGMTg q {p 2.5.7 The Installation Supervisor will assure that all necessary permits are obtained.

as apt >topriate, during the course of this installation.

I.S. -1 -

Date bd ~

Y 2.6 .Qggrational Installation Prerecuisites The required plant conditions are that the Unit 2 containment must be open for general i access for the removal of EB-10-HS-21, and any plant operating condition for AC- l 152N-6-H5A. The installation of the remaining supports is required prior to relying on j U2 RHR for U2R22 core reload leading up to the Unit 2 start up. These conditions are j spelled out within section 3.0 INSTAII ATION. ]

l DSS "

/ //

Date D/>)lM f \

1

! 1.S. . Date /-3-17 1 u (f 3.0 INSTALLATION 3.1 OC/NDE nnd Pipe Insulation Reauirements 3.1.1 QC/NDE support will be required for this installation. Visual inspections are required for welds and bolting. Checks are required for gap measurements.

QC/NDE and ANI notifications shall be performed as defined in this IWP. j 3.1.2 Contact insulation supervisor (TIS) for insulation removal for supp rt no. CH-601R-1-F as located on drawing no. SK-MR-96-073-06B.

l Page 6 of 23

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIPICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS s

MTN_ Date / ,7- f7 V V 3.2 Installation Descriotion GENERAL INSTAT I ATION NOTES: Modification of 11 pipe supports are coscred in the scope of this IWP.  ;

NOTE: Work on any grouping of supports or specific steps to be worked on hn individual supports may proceed in any logical sequence provided that the specific prerequisites are met for the individual supports. Contact the responsible engineer  !

if any installation cannot be$ccomplished in accordance with the IWP and/or the

, working drawmgs.

i i An exception is provided so that, for considerations such as raaterial availability. the l

field may substitute structural materials of the same material specification larger than those specified, provided no structural interference occurs. The field shall document any such material substitutions. Non-QA materials may not be substituted where QA materials are specified.

4 All weld filler material shall generally consirt of E70XX electrodes unless otherwise noted. All new material shall be ASTM A-36 or ASME SA-36 material, unless noted otherwise. All materials shall be QA-released as appropriate.

!!ot work (cutting, grinding or welding) in the field requires an approved Ignition D atrol Permit.

Structural welds shall be visually inspected in accordance with AWS D1 1. WP-4 and WP-5. Certain supports require VT-3 testing per NDE-754. as defined in the R R .\1 forms and as specified in this IWP.

All dinensions shown on the working drawings shall be 1/2", unless noted otherwise.

l

  • Page 7 of 23 i

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS NOTE: The ANI shall be contacted after work completion on cenain pipe supports. Refer to the specific guidance found later in this IWP.

- 3.3 RH System Pipe Supports

- 3.3.1 The RH system pipe supports are either located in the Unit-2 PAB or pipeway

  1. 3, with one exception. Pipe Support AC-601R-2-R40 is located inside Unit-2 containment on the 8' elevation (reference Bechtel isometric drawing no. P-248 for suppon location). None of these pipe supports are insulated. ,

- 3.3.2 Scaffolding may be required for field work on these s ports. '^ : '

- _ - L pi. hygg 7o All# ?. [ RiaaILEMJf5 r" '"x y :<a p_dM. sum-M2.4so 6QuiMcWT) to FM~jprod

-3.3.3 Che. . chat Unit 2 is in a Cold or Refueling Shutdown and that there are no refueling activities taking place in the refueling cavity. ,

- 3.3.4 AC-601R-2-R40. (Installation drawing: SK-MR-96-073-03. Refer to installation drawing and/or Bechtel piping isometric drawing no. P-248 for support location.) .

- a. The lower pipe saddle will be replaced with stainless steel plate or steel plate and stainless steel shim stock per field discretion. Stainless steel plate is required for like-to-like contact with the stainless steel pipe l

- b. Install a temporary support to prevent movement of the piping. The support must provided for a mmimum load of 5200 lbs prior to removal of saddle to maintain the proper pipe position.

The proposed temporary support for the pipe is installed and adequate.

CSE z ' Date l&9D 45

- c. Remove lower vertical pipe saddle with broken tack welds. Retain this saddle for future root cause examination by labeling it and placing it in eA* .

p.,9d %ff*ar

I.10 3 -

m . pes.t:25 page 8 of 23 q .'

(o'2lb POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF - 12/19/96 PIPE SUPPORTS the QA cage. Grind the surface tack welds flush with the pipe. Flu >h

--- the tack welds from the pipe for PT examination on pipe surface.

BJ{ed ed 44sMy hcK utlds fem Pr %. gra /-747 h QC HOLD POINT: Contact NDE Inspector who will perform a PT examination on the affected pipe surface.

n n, (ttAAAAS]

NDE Inspector Date / ~7- O y

%' p g y Note: Field welding requires an Ignition Control Permit.

3/g" Qf} fs 'I'iR -- d. Install the shim plate. The shim plate can either be fabricated from a yg o'y single sheet of stainless steel plate or built up as per the installation 4 q g Jg drawing detail per field discretiorr. The dimension of shim shall be such

~

//_) drM AM that there is a sliding fit between the pipe and shim plate resulting in a zero inch gap. Refer to drawing SK-MR-96-073-03 for installation '.

3),, @ E 770$ j details. Remove the temporary support.

i Q9% Remove all construction debris.

9 @ 3A337 y e.-

gg,gi 901-170150 f.- A steel plate and SS shim stock, or a stainless steel plate is installed underneath the pipe and the zero vertical gap between the stainless steel shim stock and pipe is met. Temporary support has been removed All construction, deb,ris has been clegd up.

. MTN __. , . -

Date 1 -IO-9 7  !

I l

g.- OC HOLD POINT: Contact NDE inspector who will perform a VT per AWS D1.1 on affected area, and verify the zero gap at the bottom of pipe.  ;

Ia l Date I 1047 _ (9 j NDE V

h. - ISI HOLD POINT: Contact ISI. who will perform a VT-lil per .N DI-754 on affected arez.

1 Page 9 of 23 l

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS

\M)DIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF . 12/19/96 PIPE SUPPORTS

't ISI Date No U @

- i. ANI HOLD POINT: Contact the ANI, who will perform a final visual inspection of the support.

. . , , j/

ANI r h Date N/d//7

- 3.3.5 AC-601R-4-A. (Location drawing: SK-MR-96-073-05B. Installation drawing:

SK-MR-96-073-05A.)

- a. Remove U-bolt. shim and angle as shown on installation drawing. The 3/8" base plate must be removed to allow for piping thermal growth.

The anchor bolts, Hilti may be left in place.

b. Remove all construction debris.

- c. The pipe support is removed as described on installation drawing. All construction debris has been cleaned up, a o n n MTN Date /'3T w

3.3.6 AC-601R-4-K. (Installation drawing: SK-MR-96-073-08. Refer to installation drawing for support location in the RHR HX Cubicle.)

xg y.hd{$ Note: Field welding requires an Igr.ition Control Permit.

d4 R lA M - a. Install a pipe shim as shown on installation drawing such that the pipe is ,

-- 9c a -% 2et resting on the shim and the 1/16" gap requirement at the top of pipe is 2" Fld $iuK GM.11%8 - b. Remove all construction debris.

k ON lMib b

- c. The pipe support has been modified as shown on the installation drawing. All construction. debris has been cleaned up. -

Page 10 of 23

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS  ;

. MTF _ _ Date /~ //~71

/

- d. OC HOLD POINT: Contact the NDE inspector who will perform a VT inspection per AWS DI.1, and verify the 1/16" gap at the top of pipe.

NDE ,

Date 1- 13 77' h,

. e. ANI HOLD POINT: Contact the ANI, who will perform a final visual inspection of the support.

ANI _ Date // Ib7

  1. i v

- 3.3.7 AC-601R-4-B. (Location drawing: SK-MR-96-073-04B. Installation Jr n.ng SK-MR-96-073-04 A.)

- a.

Remove the pipe clamp and cut the 1" pipe piece to the base pl.ite fhe base plate and pipe stub may be left in place, provided that the remaining pipe stub is less than 1 inch long as shown on installation drawing. j

- b. Remove all constniction debris.

- c. The pipe support is removed as shown on installation drawing. All construction debris has been cleaned up.

, - n MTN . .

Date /'3-97 )

d. % OC HOLD POINT Contact the QC or NDE Inspector who will verify the 1/16" gap at the top of pipe, and that the remaining I" pipe stub length does not exceed 1" from the base plate.

NDE ,

Date / E [ 7._ _  !

Page 11 of 23 s Mjl u.,L.v

,/ . . .

v POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 L'2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS

- 3.3.8 AC 501R-4-C (Location drawing: SK-MR-96-073-07B, Installation drawing:

SK-MR-96-073-07A.)

a. This piping does not need to be temporarily supported while the work is in progress. This modification changes the support functionality from vertical dead weight support into a lateral seismic support.

- b. Remove the pipe support as shown on installation drawing. Remove Lirinnell adjustable clevis, rod and welded beam attachment. Remove the Hilti anchor bolts and base plate. The anchor bolts can be cut /

ground flush with the wall and abandoned in place.

Note: Field welding requires an Ignition Control Permit.

- c. Install new base plate as shown on installaticn drawing.

9 *. n v u y,g .fc yj - d. Install tube section as shown on installation drawing, gg g - e. Install angles as shown on installation drawing, maintaining the lateral 1/16" maximum gap requirement and the muumum 1" gap requirement at the top of pipe.

f g g p(

f. Remove all construction debris.

g q -

g. The pipe support is installed as shown on installation drawing, and all construction debis has been clean up.

A A MTN Date /-/hO V

- h. OC HOLD POINT

  • Contact NDE, who will perform a VT inspection per AWS DI.l. and verify that lateral gap measurements are less than t 1/16" and vertical gap measurement is at least 1" at the top of pipe.

k & impecrab FER M *7 ou bxw*a9 r s ao. A c.uo t te . A s tl'y y f 2 , I ' L*1 7 v Page 12 of 23

v POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 '

U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS

,s NDE. Date /-/c 9 7 i.

k ANI HOLD POINT: Contact the ANI, who will perform a final visual ,

inspection of the support.

ANI y = A- Date A bi'If 7 .

/

- 3.3.9 Paint all newly installed welds, shim materials and support components on supports AC-601R-2R40, AC-601R-4-K and AC-601R-4-C.

- 3.3.10 The modification of RH supports AC-601R-2R40, AC-601R-4-K and AC-601R-4-C, and the removal of AC-601R-4-B and AC-601R-4-A is complete. All +

newly installed welds, shim materials and support components have been painted.

- ' n l MTN nam , Date '

I IVD a

3.4 CH Pipe Supports

- 3.4.1 General: All CH pipe supports are located on the Unit-2 PAB, pipeway #3 at 8' elevation. None of these pipe supports are insulated, with an exception of piping for support CH-601R-1-F. This portion of piping is insulated with 2" thick calcium silicate.

- 3.4.2 Scaffolding may be required for field work on these supports. ,_

p.. ... , L. ..v...J. RueA. To NP f.4.? p>< se.s FrisoiN6 R&RudikEM5 1 3enK Sate 11-RstAsso SRufAEdT. p Ihf's

- 3.4.3 CH-601R-1-F. (Location drawing: SK-MR-96-073-06B, Installation drawing:

SK-MR-96-073-06A.)

- a. Remove the pipe support as shown on installation drawing. The grout and shell anchors may be left in place.

- b. Remove all construction debris.

Page 13 of 23

I t

v POINT BEACH NUCLEAR PLANT I INSTALLATION WORK PLANS i i

MODIFICATION 96-073 IWP 96-073 l

U2R22 INSTALLATION AND MODIFICATION OF 12/19/96

. PIPE SUPPORTS

- c. _ The pipe support is removed as shown on installation drawing. All construction debris has been cleaned up.

0 ,

MTI Date /~3N '

3.4.4 CH-601R-1-N (Installation drawing: SK-MR-96-073-09. Refer to installation drawing for support location in the RCP Seal Water HX room. 2-P2)

@ (t Qlss Hl('c$clt - a. Install a temporary support to prevent pipe movement. The support needs to provide for a minimum load of 60 lbs prior to the start of

,, support modification.

- b. This piping is temporarily supported.

/i:t )clb. UV CO '

g - c. Remove the pipe support as shown on installation drawing. Remove U-bolt, angle and stiffener plate.

I MId -C 2,3 - d. Remove the U-bolt, angle and stiffener plate shown on the installation <

drawing.

- e. ' Install new base plate as shown on installation drawing.

I

~ Note: Field welding requires an Ignition Control Pennit. l

- f. Install angles as shown on installation drawing, maintaining the lateral and vertical gap requirements.

i I

- g. Remove temporary support. j 1

-j. Remove all construction debris.

h. OC HOLD POINT Contact NDE, who will perform a VT inspection l per AWS DI.1, and verify the 1/16" gap at top and sides of pipe.

~NDE Date /-23-9 7 h V

Page 14 of 23

I' ', .

. POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 Ep U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 S PIPE SUPPORTS A M Rk

#"k]8.P .g3#^'
i. ._. ISI HOLD POINT Contact ISI, who will perform akIII ri M

-%4.

r b ISI Date /-23 97 .. .

V -

k. ANI HOLD POINT: Contact the ANI. who will perform a Gnai m..o inspection of the support.

ANI Date /d 7 /r7 r .

p 3.4.5 CH-601R-1-D (Installation drawing: SK-MR-96-073-10. Refer to installation drawing for support location)

- a. Install temporary support to prevent pipe movement. The support needs 00CEM*(5 to provide for a minimum load of 110 lbs prior to the start of support d &t El571 modification.

. /f

, CA f( lQ 3-Q - b. This piping is temporarily supported.

bw k O IDO - c. Remove pipe clamp, rod, and pipe spool piece. 3/8" thick base plate.

also needs to be removed.

O %0d 1300{

A$ Note: Field welding requires an Ignition Control Permit.

3/.r: aw cA .ne; :'c'

- d. Install new W-beam as shown on installation drawing. @

l g,j , g.,j

- e. Install plate as shown on installation drawing. l I

- f. Remove temporary support. J

- g. OC HOLD POINT: Contact the QC or NDE inspector, who will perform a VT inspection per AWS DI.1, verify the zero gap at top and bottom of pipe, and witness the torquing of U-bolt.

Page 15 of 23

. l

. . 1

. POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073

- U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS

. iA -

._NDE Date t 21-97 Qp

- h. Install -bolt as shown on installation drawing, maintaining the zero gap at top and bottom of pipe. The U-bolts are torqued as specified on installation drawing.

- i. Remove all construction debris.

- j. The pipe support is installed as shown on installation drawing.

Temporary support has been removed. All construction debris has been cleaned up.

A Il MTN Date /-O-9 L

--k. IST HOLD POINT Contact ISI, who will perform a VT-III per NDE-754 I- 2l- 97 C

ISI Date t

~Q

- 1. ANI HOLD POINT: Contact the ANI, who will perform a final visual inspection of the support.

ANI Date I 21 97

,. av

-3 4.6 CH-601R-1-E (Installation drawing: SK-MR-96-073-11. Refer to installation drawing for support location)

- a. Install temporary supports to prevent pipe movement for this piping as 4 well as the 1" piping shown on the installation drawing to provide for a  !

l muumum load of 200 lbs prior to the start of modification.

- b. Remove the pipe suppor: as shown on installation drawing. Remove U- i bolt and angle. Temporarily disconnect the 1" piping. The pipe I l

)

Page 16 of 23 l

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS supports for 1" piping need to be retained for reinstallation arer the

.- work is done on support CH-601R-1-E.

- c. The U-bolt and angle shown on installation has been remosed.1" pipe support shown on installation drawing has also been temporarily disconnected.

0 ll MTt. -

Date /-/P9 b nau -CP{ Note: Field welding requires an Ignition Control Permit.

Outs #/t I1 E

- d. Install new base plate as shown r- installation drawing.

gg Install angle as shown on installation drawing, maintaining the 1/1tf pap pgg $Q /g " f.

at the sides and top of pipe.

4g

% x-/3 G4R. Q94{

- g. Install the 1" pipe support to the original location in its original Me -CD configuration.

" h. Retsve temporary support. j t

- i. Remove all construction debris.

-j. The pipe support is installed as shown on installation drawing, and the 1" pipe support is installed to the original location in its original configuration. Temporary support has been removed. All construction l

, debris has sbeen peanedm up j

/)

MTN ~ Date / .2 3' O

k. OC HOLD POINT: Contact NDE, who will perform a VT inspection per AWS Dl.1 and verify the 1/16" gap at top and sides of pipe.

NDE Date /-24-97_ ~

~

k Page 17 of 23 i

l j

i POINT BEACH NUCLEAR PLANT l INSTALLATION WORK PLANS NIODIFICATION 96-073 IWP 96-073 A I'2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS , ,

Y f. n f

~

1. ISI HOLD POINT: Contact ISI, who will perform a ~-iii pei NDE=

Ab. ,

A ISI _ ,

Date / 24 '77

m. ANI HOLD POINT: Contact the ANI, who will perform a final visual inspection of the support.

ANI Date /!/'/ /

/ i .

3.4.7 Paint all newly installed welds, shim materials and support components on supports CH-601R-1-N, CH-601R-1-D and CH-601R-1-E.

34.8 The modification of CH supports CH-60!R-1-N, CH-60lR-1-D and CH-60lR-1-E and removal of CH-601R-1-F is complete. All newly installed welds, shim i materials an,d support componentsjave been painted.

MTN , - - -

Date /G-O

- 3.5 Auxiliary Feedwater (AF) Support: (Installation Drawing: SK-MR-96-073-02. Refer to installation drawing for location.)

- 3.5.1 Support, EB-10-2HS-21 is located on 66' elevation of Unit-2 loop A, off the steam generator feedwater nozzle on 3" piping.

Note: Field welding or grinding requires an Ignition Control Permit.

3.5.2 EB-10-2HS-21

- a. Remove the pipe support as shown on installation drawing. Remove pipe clamp and snubber. The aux. steel and rear bracket may be left in place per field discretion. The removed snubber needs to be stored in a reserved lot for the snubber components. Contact the snubber

~ component engineer for required storage requirements.

Page 18 of 23

- - . . -- .= . - - . . . -

.l , . .

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 1WP 96-073 ,

U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS

- b. ... Remove all construction debris.

- c. The pipe support has been removed as shown on the installation drawing. All construction debris has been cleaned up. The removed snubber has been stored in a reserved lot for the snubber components.

A f) .

MTN , , , Date / 7')

l

-- d. ANI HOLD POINT: Contact the ANI, who will perform a final visual inspectinn of the support.

ANI '- ,

Date /N M/-

3.6 Component Cooling Water (CCW) Support

'* 3.6.1 Support AC-152N-6-H5A is located in Unit-2 pipeway #3. The pipmg nu do .

support is not insulated.

- 3.6.2 AC-152N-6-H5A. (Installation drawing: SK-MR-96-073-01.)

1

]

I It"C kg -

a. This support may be installed under any plant operating conditions.

' Q$. lam -

b. InA new 10" pipe clamp (item 1) on existing 10" line. The clamp

. U bc4 @ C /2.2 R shall be installed such that it is not free to rotate about the pipe. j

3y1> % G.R ll2% Note: Field welding requires an Ignition Control Pennit.

bk dfA 122T c. Install angle (item 2) as shown on installation drawing

- d. OC HOLD POINT Contact QC or NDE inspector who will perfonn a VT-I inspection per AWS DI.1, inspect the pipe clamp stability and l

witness the torqu;ng of U-bolt.

Date I 2l-97 D.,

QC I

1 Page 19 of 23 l

l 1

l -

POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS

\IODil lCA l'lON 96-073 IWP 96-073 1:2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS

-e ~ Install U-bolt (item 3) and torque as shown on installation drawing.

- f. Remove all constmetion debris.

g. New pipe suppon consisting of pipe clamp, angle and U-bolt as shown on installation drawing have been installed. All construction debris has been cleaned up.

~

  • n I]

MTN Date /- 2/41

) .
h. ISI HOLD POINT: Contact ISI, who will perform a VT-III per NDE-754.

.h (p ISI, Date I it- T/

i. ANI LD POINT: Contact the ANI, who will perform a final visual inspection of the supporv </ pg ,

3.7 Installation Comnlete ]

3.7.1 Contact the insulation supervisor (TIS) for piping reinsulation for support i CH-601R-1-F located as shown on drawing no. SK-MR-96-073-06B.

3.7.2 As-Built Description 1

The installation was performed in accordance with this IWP and following i documents-i SK-MR-96-073-01 revision _1_

SK-MR-96-073-02 revision 4 SK-MR-96-073-03%

W ""^0-07 023a.muu M revision h "Q el/M SK-MR-96-073-04A revision D Page 20 of 23

t,

=

l

~

\

, POINT BEACH NUCLEAR PLANT ]

INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS SK-MR-96-073-04B revision h SK-MR-96-073-05A revision b SK-MR-96-073-05B revision 6 SK-MR-96-073-06A revision 8 SK-MR-96-073-06B revision 6 2 + ddf# N-M 2-79-SK-MR-96-073-07A revision 148' SK-MR-96-073-07B revision 6 1

SK-MR-96-073-08 revision SK-MR-96-073-09 revision 1 M' W

SK-MR-96-073-10 revision 1 _

SK-MR-96-073-1 revision 1er M O C '3 ECRs # M- d 2. , M - 047; 97- d 4/t ; f ?Tdd/3 i

CRs Other considerations 3.7.3 Record all applicable QAR numbers on the WO.

3.7.4 List all calibrated equipment used during the installation of this modification in the WO.

3.7.5 As-built dimensions and weld details shall, if there were deviations from the specifications, be documented on the working drawings that were issued for construction. Attach any additional as-built documentation to this IWP 3.7.6 The installation of this IWP is complete.

. ,, n I.S? Date / - As'--re.

I 4.0 POST-MAINTENANCE TESTING 4.1 Non-Destructive Examinations, Visual Test VT-3, were performed. Refer to the testing requirements, as included with each support's installation.

Page 21 of 23

.i

[

1 POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96-

. PIPE SUPPOETS 4.2 Attach any additional testing documentation and copies of the VT-3 documents to this

~

IWP.

50 RESTORATION 5.1 Pre-accentance The final appr,ovpisgr,e coplete,for all applicable ECRs.

R.E. -

Date e' 30k u i 5.2 Svstem Restoration 5.2.1 All tag outs and installation permits are closed out.

~

r. //

I.S. Date /- 4 Y .f 7

/

5.2.2 This modificatign';r;installpon is ready for release to Operations.

R.E. ,

_ Date 8 ,

N 60 ACCEPTANCE 6I This IWP is complete. The responsible engineer has walked down all of the piping support installationsynsurf that ty modifications were incorporated as intended.

R.E. Date , 4, g

6.2 This modification's installation is complete. It has been tested and is accepted for operation. The RH, GKand AF systems are aligned per the DSS.

\ / P Y .nhol%

DSS _ -

Date l' O 6.3 Return this IWP to the Responsible Engineer, Mike Woznicki.

Page 22 of 23

[t , *

  • POINT BEACH NUCLEAR PLANT INSTALLATION WORK PLANS MODIFICATION 96-073 IWP 96-073 U2R22 INSTALLATION AND MODIFICATION OF 12/19/96 PIPE SUPPORTS PSB Room P128 Work phone.no. 8-221-4623 Home phone no. (414) 221-4623 ,

Fax phone no. 8-221-2010 l

Page 23 of 23 l

1

E

  • 4;;;_

WCC TRACKING i

p TreIGINAL -

  • nnnennen PBNP *Muen* UD Nc- GMi256 P/

WO Priority: 6

  • UNIT 2
  • MWO * 'JNIT 2
  • Rasp Group: MTN HHuna HEADER PAGE *H*uun Step Prir!- i2/20/96 Eq u i pmen t : PS AC 60iR-2-R40 Systen- RH HP Zone:

E9uipnent Nsme: RH PIPING SUPPORT PhysecaL Loration- 9/U2C Discavery Da e 40/10/?6 ProbLes

Description:

BROKEN TACK WELDS ON BOTTOM SADDLE. THREE TACH WELDS ON ONE SIDE 0' TACK UELD BROKEN REPAIR SADDLE WELDS. RRM FORM REGUIRED.

SEE ATTACHED ISO. (RRM 96-0041)

Originator: , ISE Outage ID: U2R22 Activity- E525 Tec/ Sticker - :o - 100571 Tag / Sticker Lctn:

Jcb Type: CORRECTIVE MAINTENANCE Project ID- Condition Report- -

Wori: Function: WORK ORDER hed Req 4- -

=====================================================================:========= _

QA- Y SEIS- i Operability Pre-Test- N Procedures-SR:

LCO: N EQ: N PMT- Y Operability Post-Test N Procedures-  :

SS4: N CIV- N MRULE- Y 9/P P CACC:

RRN - - - -

Tech S ec Re#-

GA Codes- 15 Sect XI Class: 2 Tools Needed:

=============.:====u=======_.========================================

Work t Lan/Instruc' -": reviewed.  :'tauner NELSON, MIK.. r:-S

!.INE SUPERVISOR: NAME: _ _ _ _ _ _ _ E. e i E - 2. ,'J._ /f/

= = = = = = = = = = = = = = = = = = =._ _ .- =========:. ==============.:==-==== ,

F' art Conditions-

. REFUELING 'Ior tior Cc" a: Pero'+ Y 013er ^ondi' ions OF~ RHR ransien+ Com5ert!b1.e P~w N l PWP V F re Barrier Penetra+ ion Pernit- N Eo u i pment Isolation Required: N E. Y Isolation Tag Series ?- _ _ _ _ _ _ _ _..__ _ _. _ _ _

1 OperaaiLity Pre-Test Comp!.ete. ____ Eq u i pment Iso la t i an as requeste:! . _

l Fernission granted to perform Work. '

I O p .E DSS Notifica+ ion Req Y Ops DSS Signature- -

.._ Date /d._ /@.$ /#

===============================================_ ==================== l SpeciaL Nortfication- ,

1 1

1 1

Number n' Steps- 001 l 4:ct i OO - 00000 - 120014i - 00000 HFG Ccde- "'ech hanua! Cntt ?-

================================================r==================
  • WORM OF. DER CLOSECUT
  • e l

l

==================:---------===========.============================

Group Head Signature: _. _____ DaTe: _2:: /.7_/ f_7

=========================m______===============================================  !

l l

l

- . ._- . - -.- .-, - . _ _ ~ - .

c W 4 y *GRIGINAL . ********** PBNP ********** WO No: 46112560M WO Pr.iority: 6

  • UNIT 2
  • MWO
  • UNIT 2
  • Resp Group- MTN ********** STEP DETAIL ********** Step Print 42/20/06 Equipment: PS AC 60iR-2-R40 System- RH HP Zone-

. Equipment Name- RH PIPING SUPPORT Physical Locationi 9/U2C

' Sequence No: Of Need Date 55crt Desc: BROKEN TACK WELDS Sched Stert Dete-

=============================================================================-

PLANNED: WORK PROCEDURES:

Crew- MM MM Shift: 2: 2

C lass : 430 410 _

==========================================_==============_====:================ -

Unrk P!an Descrip+:cn-REMOVE SADDLE AND REPLACE WITH SUPPORT PER ATTACHED IWP.

======_============================================================

OC REVIEW REQUIRED- Y NELSON, MIKE MPS DATE- i22096

_==_=======____ = ____ ___.. ________ _._______ _______._ ___ =======_====

1v 0R. K PCRFORMED -

_ . _ _ . EcLW_ N... ___ hf.c _

^

. _ _ .kb. . b

_ _ .u. . _ _4

..td _ _ pd. _ _M._ .. ..

_ _ _ _ - _ - _ _ _ _ _ _ _ _ _ G _ _Q _'T_ . L4.%_ __9. 4__CO. .l _a. - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .

_w _ _o_2. _ _M._ .._.)_ _ . ._t_+

_ _M_d_.. ._ ?_ ____T.

_ ..ED_5.% _3.h. . ___/.__M_ _ __._2%.

_ .. __ _o. _ _02.G.E_. _. ___.__ _. _ ___ _ ____ __ _____ __ ___.. _ _._

,A

] ===============================================================================

l n'rF_ : QAR ~]. 3.4_l _ _. _ _ _ _. _ _7_2_.^1_l __ - _-___-____

6

_ _ . _ _ _ __.__. .____ _ _ _ . . _ _ _ _ . _T5_2.w _ _ _ _ _ _ _ll.iYk_ _ _9_01_- N'U _ _. _

_7.M_ . S W 3. .a.-

___ ______ ______.___ _____ ____ _tu2L___._____B.11____ ______ya__ __JA.?

;==================:.:==================================================

i 4 ".,' T !J A'_ IJ.",_.I< . - "W.,...4l- __ ____ _ ._________ .__._._____ ___ _____. ______ __

e oH_F . . _ _ . _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _

^

WOP.KrR ____@.c___ __.8_1_0.___. ___._____._ _..__.____

- C.. A CS - _..______

.____i_ _._ ___I_____

,4 e _ 14. . -.nA r R.ae . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ . _ _ _ _ . . . _ .

Ta_ r. A!_ H O. n. e. .."> - ____Ak*______t.t_.o._______.___.___.____________.___.

____.S..._____.i_____________________..___.

4

_i q:. t.v pn p. aeu R,E ,o i E F. f. Mnt

. M .3

.===============================_.===========================================

FARTS USED LIST ATTACHED- Y / N '

WO TAGS REMOVED: 'N / t WORK COMPLETE DATE: l_ /.].0.g'_D EM'r'LOV, EF. NL:'M' DER - a

' M.PLOYrE - N AM:_ - __ . _ _ _ _ _ _ _ _ _ . . _ _ _ . .

==============.__. .============.=========r .===========

i

  • WORK COMPU TED
  • Cause Failure Code- PM / " / NRN / _ N .__

v.s Found-Out of Spec- V -

o / NA Machine Hirtory Review Required- Y /N Fall.ed Cotoonent e Corrective Action- a v.ra." M NA/RP ~____ ___ Downtime- _ . _ _ hrs LIN:_ " Uc'r.RVISOR- ._ .NAMr- _ ,_ . _.._______. DATE- ./_//2 '77

================__. . ___================ . _ ====r ,

,f========================

i

  • EQUI ' MENT RETU7N TO SERVICI
  • Oper ab ! L i tv. Post Testino.- _ . _ _ _ _ d_/+ _ __.________ _________._._ .._. _ ________ __

EQUIP. TAKEN 00S - DATE ./E/.L/f( TIME : @_s>__ RETURN DATE: _1/E/f2 TIME :/2fu__

C p e r a b i i :' t v. Proc.s Performed __ ___._ __ ______.______ _ ___. ___.___ ___._____.____

NON OPa" SUPV: i

! I i ._' i'_ i .N A. M P_ - . _______________ LATr: _ _. ./ _ _ ./ _ _

"ua" a" .

. NA.ME . .a /. 2_2. _. _ _ _ _. _ _ _ _ _ _ _ _ _ _ D'Z___ A. T/5.. E _ / Z7_

. Cyb>^52s*v f.

  • ^

6: 11 76 A 96IL&ov/

.L; , . 9 612- S% 7~

Work Order / Document No. M A 9 6-7.3 Return to Service Testinoe Reviews s

INITIALS Pre-Relesse / Pre or Post-RTS_

Work Groun Post-Maintenance Testing UT o4 w J L- .$ 4- -

<W -

,17 - % a 4- H.~ e s V p7

/ gd

^

& 'n i e 'M' See ion XT Ecuiement/Y / N .-

V f Ocembilifv Testir a X_)sne Inse . ice Testine

- A)m rus-4IWN Yib.i _ . _ .

1 1 ENGINEERING RENTEW

... }

no A.u rncrNA<- Pdr n/

.R AV t '

sac :ccc ssatwsame er.,tw b-m

H.; .

WCC TRACKING  % J Sp :

V  !

L PgIGINAL ********** PBNP **uu***** L0 iJo 9692596 W0' Priority: M

  • UNIT 2
  • MWO
  • UNIT 2
  • Resp Grcup: MTN **u M**** HEADER PAGE ** u****** Sten i'rint- 12/20/c6 Equ i p enen t : PS AC 60iR-2-R40 Sys tera : RH H:' Zone-Equiproert Harae- RH PIPING SUPPORT Physical Location- 8/U2C Discovery Date: 10/10/96 F rob terq Description-UPGRADE SUPPORTS TO REDUCE VIBRATION PER IWP 96-073. (RRM 96-0041)

Originator.: W, NE ME Cutage ID- U2R22 Activity: 8525 Tag / Sticker Placea: N .No: 100044 Ta9/ Sticker Lctn-Job Type- MODIFICATION SUPPORT Pr o.i ec < ID: Condition Renort:

Work Fun: tion- WORK ORDEP Mod Ret 4: 96 - 073

===================================================================

QA: Y SEIS: i Operab .:tv Pre-Test- N Procedures-IR: Y LCO: N EG N PMT: Y Cperability Post-Test- N Procedures- .

SSA: N CIV: N MRULE Y A/P: P CACC: ,

RRN - - - --

Tecn Spec Ref: 3. 3. A . ; .;

QA Codes- 15 Sect XI Class- 2 Tants Needed- a.d3

=================[ = = _ = =5 =6 =Y/

==_;=======================================_=====

= = =. = /_. A / A Wark Plan / Ins + ructions reviewed. P!anner- WLSON, tiIKE MPS LINE SUPERVISOR- J NAME: .s_______.__ DATE- /_ /J..T;

============__. ===========:_. i===================

Plant Ccrd>t ions- COLD SHUTDGUN Inr tion r crrrat Pam * +

  • Other Conditians- BEFORE START-UP Transient Combust!.5t.e dern - u Fire Darrier Penetration Perrq+v- N %P N d

Eq u ! prien t Isola ion Re.eired- N FME Al Isoi.a+ ion Tag Serier ?: _ _ _ _ _ . . _ _ _ _ _ . _ _ . _ _

Operability Pre-Test CotopLete.'____ Equipr9ent Isolation as requested. ___

Fermission granted to perforrq Work. j'-

0 s DSS Noti #irstion Reo. Y Ops DSS Signature: Da+e: /.A/f3/f4 Special Notification- '

liunber of Steer- 001 Acct t 00 - 00000 - *20044i - 00000 MFG Code- Tech FarusL,Cnti. 2 I

============================================.:================================== .

  • IJORK ORDER CLOSE00T *
==================-================================================

Group Fead Sioreture- . _____

Date: d /_"/_/9 J

================_ _. =========================================

, . . - . . ~ - . .. - . . ..

i a- .

    • e 1 4j . .

C 'ORIGINAi_ - ********** P9NP ********** WO No C6i2 8 00i WO Priority: M

  • UNIT 2
  • MiJO
  • UNIT 2
  • Resp Group- MTN ********** STEP DETAIL ********** Sten Print- 42/20/06 1 Equipmer+ PS C 60iR-2-R40 Systea* RH HP 7.one' l Equipmen+ Name: RH PIPING SUPPORT  !

1 Physica! Locetion- 8/'J2C i

. Sequence No: 01 Neeri Date 11/2T/9< i Shor~ Desc CRACKED TACK WELDS ON BOTTOM SADDLE Sched Start Date-

===================================================================

PLANNED: WORV PROCEDURES:

Creto MM MM Shift- 2 2 C f a _e. _r

  • A TA) . 4 s. rJ _.
===================================================================

. Wor t: Plan Description-g$l'T~; C SUPPORTS PER ATTACHED MOD.

UfertMW

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =a= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

QC REVIEW REQUIRED- Y NELSON. MIKE MFS DATE- 122M6

=========_:====:==========

=at1RK = =PERFORMED-

= = = = = = = =______ ._ = = =5_ = = = k_ _: =.r=w

. . _ . _ _ _ n* lc.<c =_=_g$_ = =.= _ = - =.I_=_=4.

. .(. ._ . __M_ _ .._%.0. 73

__ %_ ,. . _op - _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ . . . . _ _ _ _ _ _ . _

_~- _ . . _ _ _ . _ . . . _ _ _ _ . . . _ . _ . _ . _ . _ . . _ _ _ _. . . . . . . . . . _ . . - . . _ _ _ . _ _ . _ _ _ _ . _ _ . . . .

wcvw_e.p _.h...u_ .._B_......_...._._.._...__.p...

2. G. . . .& a h. . .,.......- /.. w .3 __._.. ._ _.. -. ...

==========================================================================-.

]

MT. r. . _______.___ _.___......-_. ____ _____ . . _ _ _ _ _ _ . . _ _ _ _ _ . . . . _ _ . . _ _ .

i p.qw . ___ 5_2 .

3W l

_ _. _ _ _..Ci. I. . ._-. . 0._.L... a-'. __ ____

4

_... .____ -_...____._ ____ ___ _ _7_)0 _ _ _ _ _ . . . _ _ . .

4

____ __.__ _ ___. ____ __.._. ____ _l M.7A __.__ __l_a_ @_e._ .. __________

;====-:=========================_==================================

G C ~. U Al U S F. D

  • CREU: _________ -________ _________ _________ _________ \
v. t. .v er . _ _ .

UCRKER CLASS- _ _ _ f l. p_. _ _ . _ _6.1.0. _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ ._ _

. t1:.1t1EF_ n r r g, .p.uy _r.ow.c .

a ____.l__.__.____l._________________._.. . _ _ _ . . . . _ .

TOTAL HOURS- ___ ____2._0_-_____.______._____._______. 1 T.T._' r.XP0.m. . R.T/."T._ r* /. riR_r.C.

===================-==========================================

PARTS USED ' !ST ATTACrlED- 'N UO TAGS REh0VED " ' N / ^

WCRK COMPLETE DATE. i / /0,/),,7 E m. i . e

.n, i. - rrc .

.t we. n. yr_e. .q n. .r_ ..

= = = = = = . _ = =a- = = = = = = = = _ _ _ _  :====_========================_. , = = = = = = = = = = = = = = = = = -

  • WORK COMPLETED
  • Cause Failure Code
  • FM / -

/ NRM / . 6 Q.__

As Found-Dut of Spec Y / /4A t Mschine History Review Required- Y/N Failed Connonert- awra Correct!ve Action: NA/RP.@._~ ________ DawntiMe: _ irs LINE SUPERVISOR: " ' ' ' '

NAME: , .___ DATE- ./_v.2 /f;

= = = = = = = = = = = = _:= = .===============.___ ====================  !

l EQ WPM.E.i47 RETURN TO SERVICE #

Op=.rahi.i.i.v, 7'o

. . . . s + T a_ s t .i n c. : _ _... _-/.s.^__._ _._ _ _ _ _ _ _ _. _ _ _._ _ _ _ _ _ _ _._ _ _ __ . _ . _ _ . . . _ _ _ .

1 EQUIP. TAKEP 005 -- DATE /.t /t_._/_4 TIME: /_>_.6/_ RETURN DATE- _ / _f_ _ TIME:- c__ -

i Dr=rsbit:

a N. P r o. m. . P.=..rfo.rma..d.__..________._.___.__._____._____________._.__________

NON ops" a" PV- I ' ' '- t ( !

.v.. .e., .

NAMEj __,,.__,__ n _ _______ __. . DATE: -_./ ./_.:

2

.. t. ___._. ____ _ r. r . 2_._ . _ _ . .

4,e

i

.}

. 9$,32s y

  • 9 6//T.T6 4 s & >- z- bo V

'h/ "E hh Work Order / Document No. M A 9 6-7.3 -

Return to Service Testing Reviews INITIALS 1 Pre-Release / Pre or Post-RTS -

1 e

Work Groun Post-Mais- - == Testing UT a& we i=A~ b6 -

<W .

,1 7 - 1 a 4- M. w s V 9Y

/ zW

^ ^ nI

% *I See icn XI Esuinment/Y / #

V /

d Ocembilirv Testine l

da me 1

Insenic- Testing davus.

.. o /

'~

. r as_.

v ENGINet.dNG REVTEW Sg. AhtnwA/AL PuY Y'

t-SECT ~ON XI ENCINEER!NC RE'<1E%

. // -

a McNL .

l l

)

l

( #.[

2, ,

i

Spp- =y

.. ave O

s nwt nerg f% f ' -

9 1

.g.~ ORIGINAL . ocua**cceo PBNo **o******* WO No 96i2604 I

WO Prfority: M

  • UNIT 2
  • NO
  • UNIT 2
  • R;sp Group
  • MTN ********** HEADER PAGE ********** S*ep Print: 12/20/96

' E<tu i pmenT : PIPE AC 0152N-06 Sys en- CC HP Zone-Equipnent'Name: SUPPLY HEADER THRU RHX TO RETURN HEADER

.Physica L Location: CC Dircovery Date- *0/40/cd Problem

Description:

' UPGRADE. SUPPORTS TO REDUCE VIBRATION PER IWP 96-0T3. (RRM 96-0070.)

Driginator: .: . C. Outage ID: U2R22 Activity: 9525 ag/ Sticker Pl. aced: N ,_No: 100046 Tag / Sticker Lc';n-Job Type MODIFICATION SUPPORT- Project ID: Condition Report: -

Work Function: WORK 0,RDER Mod Req 4: 96 - 073 '

c========u=====================================================================

QA: Y SE~S: i Operabitity Pre-Test: N Procedures-SR: Y. LCO: N EO: N PMT Y Operability Post-Test- N Prcre Jures'  ;

SSA: L CIV: N MRULE Y  ;

A/P: P CACC: i RRN: - - - -

Tech Spec Ref- 3.3 l 04 Codes: 06

~

Sect XI Class: 2N i ccLs Needed- l

///h # 96 70 <

======================_============================================

kerk P'.ar/Instructiors reviewed. Ptanner-NELSON, HII'E MFT

INE SUPERVISOR- NAME:. ,______. DATE- _4/J. /f7
==========. .=============___ =================

P.ent Conditions- COLD SHufD0wN Ignition Control Permii i Other Ccnditiens- BEFORE START-l? Trensient Ccenb ust 4 bte Ferai+- N re Barrier Penetration Pereit- N %P '

Equipment Ise:.arien Required N Pi4E N Isota-ion Tag Series t- _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _

Operabi!.ity Pre-Test Complete. __.__ Equipoent Isotation es requertei. _...

Permission granted to perform Work. g' N + e /A/O/_f_.4 Ops DSS Notification Ret- Y Ops DSS Signe+itre: ,

======================_=========-:===============.__

ts.

.====================

See:ial Notific.>T ion-hunber ci-Steps- 00i Acci t 00000 - 1200141 - 00000

'!FG Code- , Tech Hanuat Cntt t-

=======================.=======:========================_:===========
  • WORK ORDER CLOSEOUT *

==o======================---==================================================v Group Head Signature:

=e=============_:========a____

_. ____ Date A./.?_/f

============:g===================

I. . s O

  • v* ORIGINAL * * *o* * *n n PENF n*coc*cau* WO No 9612604001 WO Priority: M * . UNIT 2
  • MUD
  • UNIT 2
  • Resp Group: MTN ********** STEP DETAIL ********** Sterr Pr i nt : 12/20/06 i H:' Zone -

Eq.u i p ment : PIPE AC 0152N-06 System: CC Equipment Nane: SUPPLY HEADER THRU RFX ~0 RETURN HEADER j Pnysica! Location: CC Need Da te 4 4 /2"//C, !

Sosuence No: 01 Short Desc: ADD SUPPORT TO REDUCE VIBRATION Sched Start Da w i o=============================================================================: -

PLANNED: WORK PROCEDiJRES-Crew: MM MM i Shift: 2 2 C! ass 4i0 430 .-  :

==============================================================================:

Work Plan

Description:

I INSTALL SUPPORT PER ATTACrED IWP AND DRAWINGS. .

============ =:

================.:=========================================i3====DATE-OC REVIEW REDUIRED Y NELSON. MIKE MPS q (, O 6220?6

=-b  :

= = = PERFORMED-W:1RK ======= -- =.b= = = = = = = = = d= t Ieg=u Md ------- ==== a = =-[=[= -

(q(5-= =g=i-- fLr=====

l,


..------...M--...----.6----------------.-------------.----.--%1--------------------------------------...--.

1 I

-.__-___.__._-_-__-__-___---__----_--_-.--QtE__-_----_--_--3_5.6-..-

oa '

l

. .D. f4_,. -7. -0 g.3..1.

.NHX yWo . _ f. fe_. .t.- 5.2..

M._ . - - --- _- _--_ .- - -- - - --- . .o3.%-- - -- 23 - ij9h.io. . .. .

. . _//2.. .. .-- -_-- _ .G 25 -_ -- .. 1. .

8..Q -- _ _ _

_ .Jh2~ - - - - - - _l.1%..--__--

. -- - - -- - _ . . _ - . - _ - - - -- - _ _ _ - - - .. _ _ - - _ - - _ 4 (Std

======================================.========================================.

HTE in. cIW_35. a. gu.aq. - - ---------- c, ore . 1.3333-- 7.3 W. ---- - - - 7 7. 0.1.-- . . - .

m ,,, .

4. /2211 y.D_9A L4q% X W,, ,.,

.rcM. G_-- __J- 52 h .nr mqN M J

m sn .-_270L._... Qt4

=============c========a======================>

ACTUAL US~D- FRry --- . --- ..----- -- --------

<eshM_T 13 3*R.* -- ------

W+ *R=

.m l. r.7 - - --- -_-----

J0Wrm~ r, bs e _..lj..6.

f -_- --- W- /O - . _._--..--

8)O & -Q NUMEF.r. a OF dOh5:a -

---A.--------.1--..--- . - . - - - dl..----- --.. .. --

T O T. AL Ho. "s P " - -- A. ---- --. 9. -

C 0 -----.- - - dd ~------ . .. .

TTL EXPOCURE/ STEP (MREM..) -- AQ. ..-- --- (oo-- --- 69--.- - />.- ---- ------ -

=====================-.====- =================================================-= 1

. I F9RTS USED LIST ATTACHED- ' /N  !

90 TAGS REMOVED Y WORK COMPLETE DATE )_/1l'.R"/ {

EMPLOYEE NUMBER J ,/ N /^ " * ' 5! EMPLOYEE NAME .. -- f. -- ---.- ---. 1

=================:=.  ::=============================_ ================= 1

  • WORK COMPLETED
  • Ca ure i"a i !.ure Code - PM / '?VC / NRM / ______.

As Found-Out of Spr.c- Y r e i, l e:I ..,omponent -

/N/$ Machire Histerv Review Required- / N n

'- ./1// Dcwntime- ___ hrs CorretTive i..INE SUPERVrSOR.

Acticn:: NA/RP n / _i._

. ",1 _ - _.N.AMF _ . _ -- . _ _- _ D AT. F. /. . W / 6. .

==============_. .-- =========a--__----=--.-======================== 1

  • Ew +iEM ~ RETURN TO SERVICE
  • Cperabttitv. M ENIP. TAKENPost 00S -Test i.ng : /j/ t . /ff .-----------

TIME 51.9_ -------------- - .---1/f.//.2 --- ---TIME M.. .4A DATE: ,

RETURN DATE:

Operab;!!tv. Procs Fer formeri . ....------ -- -- --- -- -------- --- ---- - --- .

NON OPS SUPV- ! ' ' ' ! ! ! NAMr -

._-_------_ pq..r -

/ /_

up.ME- D e i. c *l.- --o -~ t h.

DSS- .. . ! .a,,-... ------ ----

9 613263#

s' -

96 1176 A  ;

9 61 : bo v/

>l~

l ' *

9 6 o s ss r-Work Order / Document No. M A 9 6-73 Return to Service Testing Reviews umu.s Pre-Refense / Pre or Post-RTS i Work Groue Post-Maintensne
Testina y y tJ T eG we tel- /_ $$1 ,

r/ T- % ab H~ w s V gg ,

97

/ 4,f 1

l

[ ci Secion XI Eeuiement/Y / N V /

Orembilifv Tes:ine d a ne-

[pf)3-"Ica Tasting dab nd-

-o t )

s s s I

ENGibtz.-dNG RENTEW l

Ato AulnerNAL pur S E- ON Yi ENGiWER!NC 2.E'1Ew l'

ScNP, .

e

  • q (f .

ORIGINAL WCC wou*unuoun TRACKINGPPNP *****e**** WO No- C6132d3 WO Priority: M

  • UNIT 2
  • MWO
  • UNIT 2
  • Rosp Group: MTN ********** HEADEF PAGE ********** , 5tep Prir- i2/20/96 Etuipment: HS-21 Systen: AF HP Zone Equipment Name- HX-iA SG AUX FEEDUATER LINE SNUBBER

?hysical Location 72/U2C/ WEST Discovery Di.Te- 14/26/96 Prob!.es

Description:

REMOVE SNUBBER PER IWP 96-073.

CNEED BEFORE STARTUP*

Originator: Outage ID: U2R22 Activity- 8525

' Tao /St!cker Placed- N }io - 100230 Tag / Sticker Lctn:

Job Type: MODIFICATION SUPPORT Pro.iect ID: Condi' ion Reoort-Work Function: WORK ORDER Mod Ren ?: 96 - 073

===================================================================

QA: Y SEIS: i Operabilitv Pre-Test N Procedures-SR Y LCO: N EQ N PMT Y Operability Post-Test: N Procedures-

.SSA: N CIV: D MRULE Y A/P- P CACC-RRN- - - - -

Tech Snec Ref- 3.4.A.4 04 Codes: 15 Sect XI Class 2 Tools Needed' 4 $7

= = = = = = = f=/ k g/ r,.yg.fy

= = = = = = = = _:= = = = = =_ ======================================================= *96-69 Work Pl.an/ Instruct ient reviewd. Planr -

NFIRON. MIME MPS

'LINE SUPERVISOR- NAriE ._._.__ __ DATE- .. t /.J. / f7

================= ========r._____ =========================z t' tant C on:l i t i ons : COLD SHUTDOWN lanition Contra Permir N Other Carditionr- BEFORE STARTUP Transier- Combus*ible c erai- N Fire Barrier Penetra+ ion Perniv N RWP f Equipment T.ro t a t i on Req u i red - N FME- N Isolation Te9 Serier ?- _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ .

Operabrlity Pre-Test Comotete. ____ Equipmen* Isolation as resuesTed. _

Pernirsion grar.ted tc nerfora Work. /" ' '> a c e : ./,t//l/ff Ops DSS Notificaiton Ret' Y Ops DSS Signature-

=======-;================================__ . =========.====

Speciat Natification- #

l l

kunber of Stepr: 001 A:c' t 00000 - 1200141 - 00000 4FG Ccde- GRIN Tech Manua' CntL ?! 00409

==:.:==========_==============.=======2=============-a==========================2

  • WGRK ORDF_R CLOSECUT
  • _ .h WW. . .D. ese _ Sh _ . . m.m . _. _ap. _

Groun Fead Signature ___ __

Date: .2./J_/S

e====================m__.. ==================2====================

i 1

. .- . . . _ - _ - . . . . _ - ._~ - - --=

.r,. .

2. ,

s W GRIGINAL - uw**uMM*ux PBNP. *****uuu** WO No' 9613263001 f W3 Priority: M.

  • UNIT 2
  • MWO
  • UNIT 2 *  ;

Resp Grcup: MTN ********** S~EP DETAIL ********** Step Print: i2/20/96  !

Equiptwnt: HS-21 .

System: AF HP Zone:  !

Equipment Name: HX-1A SG AUX FEEDWATER LINE SNUBBER Physical Location: 72/U2C/UEST  ;

Sequence No Oi Need Date Sched Start Date:

Short Desc: ' REMOVE SNUBBER PER IW 96-073

===============================================================================,

PLANNEP: WORK PROCEDURES: .

Crew: MM .

j- Shif' 2 l

' Class: 410 ._ ,

l

===============================================================================;

Wori: Fi.an

Description:

i REMOVE SNUBBER PER IWP 96-73.

SAVE SF BDER FOR KERRY CRAFT.

a, .::==============================================================

! CC REV: EQUIREDt Y NELSON, MIKE MPS DATE: i22096 i t

=====u a _e .

U0RK FEr. MED:

= = =. = = = r = = ====__======-=====b..=================

kt.rnch-- = __ d =_=_=SM ___RMb=f_ _ an

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ [._ _ W. . _______*Mo- _ _e W_. _ _ . . ________

__~_.@_.. _______ _ _________-

. l h

,. _.o._ _f. 3..ts)_

_E._d__f_x._________%___e_....____9.._____i___f_E_/Lf_}4.i._.c"-

. J.P____ h... /.2 sy _._. _________________5_

' = _ 5_ 4 J _2_ 0... - ____ _ _ _____

e

_._____.___..___'1_ __.. _________________________ __..___.______ ________________ ___

=.:.uu.==========================_===================================

i

.* irr- - ___ _..___ ____-_____ __________

g49:

. f ggn,_.-_ _____.____ ______- _

i i

T

========================================_==================================:==:: .1 e-C l ed .. iJeED. C,EU.

n . ______ __ _________ _________ ___.____.__ _________

r HIFT.- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ .

W R. n (. a ! ___ ___ __ . _ _ - _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ . _ _

, N..JMBC_R 0~ t WORKrPwN ____.1________L__________________________-._.

4-TOTAL HOURS: ____5____ ___5 __-_ _ _______ ___ ____ _________

TTL EXPOSURE /STrP (MRrM.): ___.S____

n===========================h============================

PARTS USED LIST ATTACHED' fY f

' WD TAGS REMOVED Y / N / ftA) WORK COMPLETE DATE
././ J_,/,17

_i MP' OYrr NUMBE.R

-- _r M 5'L O Y E- r N A M. _C .

========____ ,====================== a=====
  • WORK COMPLETED
  • Cause Failure Code? PM / @ / NRM / ______

. As Foun-i-Out of Spec : Y /@/ NA Machine History Revieu Required: Y /N Fai1.ed "omponent: ./. _n. sme _ _ _ _  !

i i

Corrective Action: @'/RP/RE/ #' _______ Dotant i me ____ irs ,

~ ~

LINE SUPERVISOR- NAME- ____ _ DATE: _/_ /. 2 /F_2. l, o ================ .=============____ .::===================== 4

  • EQU.L ME. RETHRN 4 TO SERVIEE* *

.Operabilitv. Post Ta. sting- __

W ___ __ __.

EQUIP. TAKEN 005 - DATE bLAJ_/u ______e________________________.-_____[.77IME TIME: 92.d_ RETURN DATE J /f_/ d?M.

Operabilitv. P r o c s P e r f o r et e d _ _ _ __ _ _ _ _ __ _ _ _ _ __ _ _ _ _ _ _ _ __ _ _ _ __ __ _ _ __ _ _. <'

i NCN OPS SUFV i i! !_I_I i NAME: _ _______ ________ __ DAT.E- /

DSS:

NAME: .

...______ DATE: _Z_ /I._.._

  1. 2_ i/,

J .

9 6132s v f .

, 9 6 s /z r6 4

' b- s & > s ta ys e s , z s, s -

Work Order / Document No. M 8 9 6-73 Return to Service Testing Reviews umu.s Pre-Relesse / Pre or Post-RTS Work Gmun Post-Maintenance Testine t/ T e4 w sh $$ ,

<W -

r/ T - % o& M -,-# s V Sd 97 /

A -

See ion XI Ecuiement/Y / W V /

Ormbilifv Testine A)ene InseMe- Testine A)a nd-h' -

ENGibtr..dNG REVTEW J

Ala Ah1DerNAL PMY

/ i SE ~~~ON VI ENGiNTER'NC o.E'AEW _

NcN? -

.