Rev 13 to Pc 43,Part 3, Svc Water Strainers
ML20138K617
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/30/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
PC-43, NUDOCS 9702190071
Download: ML20138K617 (9)


Text

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30.1997 f-( - Date RECORD DSS PROCEDURE VERFED CURREN"f AND CHECKED FOR TEAPOR/.RY CHANGES !F TELD COPIES REQUIRED. USE PBF.002h 1AW NP 1.2 4 AND DO tiOI COMPLETE THIS BLOCK BY: DATE:

1.0 PURPOSE 1.1 To remove sediment and fouling of service water strainers.

1.2 Operational check of the bus duct coolers low flow alarms.

1.3 To remove sediment deposits in the SFP service water lines.

1.4 To remove sediment deposits in the service water supply lines to the auxiliary feed pumps using the built in flush lines.

2.0 REFERENCES

IR 96-006, NRC Inspection Report; NRC Commitment for Operations procedures PMT/QC reviews.

l j

) 3.0 PRECAUTIONS AND LIMITATIONS 1 Coordinate with Control Room personnel to align equipment to allow securing service water long enough to clean strainers. '

l 4.0 INITIAL CONDITIONS Assemble the necessary tools, lubricants, and cleaning supplies. (Spare pans as required for safeguards equipment.) i

\

V '

9702190071 970210 y Page 1 of 9 PDR ADOCK 05000301:: -

INFORMATION USE

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13  !

SERVICE WATER STRAINERS January 30.1997 5.0 Procedure 5.1 Isolate, disassemble, clean and reinstall the following service water strainers.

INITIAL Strainer Component CLEANED YS-2920 K-2B YS-2919 K-2A YS-2918A K-3B YS-2918B K-3A YS-4432 HX-79, water treatment cooler YS-4435 HX-66A, auxiliary feed pump room YS-4430 HX-66, auxiliary feed pump room YS-4420 HX-39A&B, service building YS-4431 IHX-70, Electrical equipment room 1YS-2916 IHX-548, EH oil cooler 1YS-2917 IHX-54A, EH oil cooler lYS-2931 Vacuum prime pump seal YS-2983 Common vacuum priming pump seal lYS-2994 Condensate pump A 1YS-2990 Condensate pump B YS-2982 Heating boiler sample cooler 2YS-4431 2HX-70, Electrical equipment room 2YS-2931 Vacuum prime pump seal 2YS-2917 2HX-54A, EH oil cooler 2YS-2916 2HX-54B, EH oil cooler 2YS-2994 Condensate pump A 2YS-2990 Condensate pump B YS-4165 P-56A, water treatment vacuum pump YS-4166 P-56B, water treatment vacuum pump YS-4167 P-56C, water treatment vacuum pump YS-4439 HX-105A, Battery room cooler YS-4441 HX-105B, Battery room cooler YS-4434 HX-99, spray pump area YS-4433 HX-98, residual heat removal pump area YS-4421 HX-32B, auxiliary building YS-4422 HX-28B1, W-17 cooler YS-4423 HX-28B2, W-17 cooler YS-4424 HX-28A3, SSB AC chiller YS-4425 HX-28A 1/2, SSB AC chiller YS-4454 HX-194, gas analyzer cooler Page 2 of 9

.' l '

INFORMATION USE

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30.1997 b

4 EMI 5.2 Inspect for leakage at system pressure.

INITIAL Strainer Comoonent PMT YS-2920 K-2B i YS-2919 K-2A j YS-2918A K-3B YS-2918B K-3A YS-4432 HX-79, water treatment cooler YS-4435 HX-66A, auxiliary feed pump room

~

YS-4430 HX-66, auxiliary feed pump room YS-4420 HX-39A&B, service building YS-4431 IHX-70, Electrical equipment room IYS-2916 lHX-54B, EH oil cooler j 1YS-2917 IHX-54A, EH oil cooler lYS-2931 Vacuum prime pump seal YS-2983 Common vacuum priming pump seal

. lYS-2994 Condensate pump A 1YS-2990 Condensate pump B Os YS-2982 Heating boiler sample cooler 2YS-4431 2HX-70, Electrical equipment room 2YS-2931 Vacuum prime pump seal 2YS-2917 2HX-54A, EH oil cooler i 2YS-2916 2HX-54B, EH oil cooler 2YS-2994 Condensate pump A 2YS-2990 Condensate pump B YS-4165 P-56A, water treatment vacuum pump YS-4166 P-56B, water treatment vacuum pump YS-4167 P-56C, water treatment vacuum pump YS-4439 HX-105A, Battery room cooler YS-4441 HX-105B, Battery room cooler YS-4434 HX-99, spray pump area YS-4433 HX-98, residual heat removal pump area YS-4421 HX-32B, auxiliary building YS-4422 HX-28B1, W-17 cooler

, YS-4423 HX-28B2, W-17 cooler YS-4424 HX-28A3, SSB AC chiller YS-4425 HX-28A 1/2, SSB AC chiller m s YS-4454 HX-194, gas analyzer cooler

(\ -

Page 3 of 9 INFORMATION USE O

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR SERVICE WATER STRAINERS Jan 3 1997 O

Remarks:

6.0 AUXILIARY FEEDWATER PUMPS 6.1 Flush the south service water supply line to auxiliary feed pump suction via the bulls eye to the service water header by opening valve SW-140A.

6.2 Flush the north header in same manner as Step 6.1 above for SW-111 A.

  • CAUTION
  • SHOULD IP-29 REQUIRE COOLING WATER SUPPLY WHILE SW-137 OR 137B IS SHUT, IT MUST BE PROVIDED BY MANUALLY THROTTLING OPEN OF BYPASS VALVE, SW-137A.

6.3 Station a Level 3 dedicated operator in accordance with OM 3.26. Supply cooling water to IP-29 if required.

6.4 Shut SW-13 7 and 137B. Then disassemble, clean, and inspect lYS-2998.

Flush SW through the strainer body with the strainer removed.

Reassemble the strainer. Lock open and record the lock numbers of the following:

't SW-137 Red Lock No. /

SW-137B Red Lock No. /

fMI '

6.5 Inspect lYS-2998 for leakage at system pressure.

6.6 Secure Level 3 dedicated operator.

Page 4 of 9 INFORMATION USE ,

9

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30.1997 7q INITIALS 4

6.7 In the second and fourth quarters, perform the following on the firewater
backup cooling rupply

6.7.1 Shut FP-243 and 306.

6.7.2 Disassemble, clean and inspect YS-3795.

6.7.3 Flush firewater through the strainer body with the strainer removed.

6.7.4 Reassemble the strainer, YS-3795.

6.7.5 Open FP-243 and 306. Shut SW-135.

PMT 6.7.6 Inspect YS-3795 forleakage at system pressure.

6.7.7 Open cooling supply bypass, SW-137A and record PCV-3771 pressure on IPI-4458 psig.

6.7.8 Shut SW-137A. Then lock open and record the lock numbers of the following:

SW-135 Red Lock No. /

! FP-243 Red Lock No. /

FP-306 Red Lock No. /

aCAUTIONa SHOULD P-38A REQUIRE COOLING WATER SUPPLY WHILE SW-132 OR SW-132B IS SHUT, IT MUST BE PROVIDED BY MANUAL THROTTLING OPEN OF BYPASS VALVE SW-132A.

6.8 Station a Level 3 dedicated operator in accordance with OM 3.26. Supply

, cooling water to P-38Aifrequired.

^ (O ) .

4 Page 5 of 9 INFORMATION USE,

)

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 l SERVICE WATER STRAINERS January 30,1997 INITIALS 6.9 Shut SW-132 and 1328. Then disassemble, clean and inspect YS-2914.

Flush SW through the strainer body with strainer removed. Reassemble the strainer. Lock open and record the lock.

SW-132 Red Lock No. /

SW-132B Red Lock No. /

PMT 6.10 Inspect YS-2914 for leakage at system pressure.

6.11 Secure Level 3 dedicated operator.

3

  • CAUTIONa SHOULD 2P-29 REQUIRE COOLING WATER SUPPLY WHILE SW-115 OR SW-115B IS SHUT, IT MUST BE PROVIDED BY MANUALLY THROTTLING OPEN OF BYPASS VALVE, SW-115A.

6.12 Station a Level 3 dedicated operator in accordaace with OM 3.26. Supply cooling water to 2P-29 if required.

6.13 Shut SW-115 and 115B. Then dhassemble, clean and inspect 2YS-2998.

Flush SW through the strainer body with the strainer removed.

Reassemble the strainer. Lock open and record the lock numbers of the following:

SW-115 Red Lock No. /

SW-1ISB Red Lock No. /

PMT 6.14 Inspect 2YS-2998 for leakage at system pressure.

6.15 Secure Level 3 dedicated operator.

6.16 In the second and fourth quarters, perform the following on the firewater backup cooling supply: .

6.16.1 Shut FP-245 and 298.

6.16.2 Disassemble, clean and inspect YS-3796.

. Page 6 of 9 INFORMATION USE e

U

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30,1997

,o INITIALS 6.16.3 Flush firewater through the strainer body with the strainer removed.

6.16.4 Reassemble the strainer, YS-3796.

6.16.5 Open FP-245 and 298. Shut SW-112.

6.16.6 Open cooling supply bypass, SW-115A and record PCV-3772 pressure on 2PI-4458. psig 6.16.7 Shut SW-115A. Then lock open and record the lock numbers of the following:

SW-112 Red Lock No. /

FP-245 Red Lock No. /

FP-298 Red Lock No. /

PMT 6.17 Inspect YS-3796 for leakage at system pressure.

  • CAUTIONa SHOULD P-38B REQUIRE COOLING WATER SUPPLY WHILE SW-123 OR SW-123B IS SHUT, IT MUST BE PROVIDED BY MANUAL THROTTLING OPEN OF
BYPASS VALVE SW-123A.

, 6.18 Station a Level 3 dedicated operator in accordance with OM 3.26. Supply cooling water to P-38B if required.

6.19 Shut SW-123 and 123B. Then disassemble, clean and inspect YS-2913.

Flush SW through the strainer body with strainer removed. Reassemble the straincr. Lock open and record the lock numbers of the following:

SW-123 Red Lock No.

/

SW-123B Red Lock No. . /

P.MI 6.20 Inspect YS-2913 for leakage at system pressure.

/G

, 6.21 Secure Level 3 dedicated operator. ,

. Page 7 of 9 INFORMATION USE 4 4 0

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30,1997 INITIALS 7.0 BUS DUCT COOLER LOW FLOW ALARM CHECK 7.1 Umt i 7.1.1 Open ISW-425C.

7.1.2 Shut ISW-425B.

7.1.3 Ensure the Control Room receives the " Unit 1 Generator Bus Cooling Water Flow Lo" alarm.

7.1.4 Open ISW-425B.

7.1.5 Shut ISW-425C.

7.2 Unit 2

, 7.2.1 Open 2SW-425C.

7.2.2 Shut 2SW-425B.

7.2.3 Ensure the Control Room receives the " Unit 2 Generator Bus Cooling Water Flow Lo" alarm.

7.2.4 Open 2SW-425B.

7.2.5 Shut 2SW-425C.

8.0 SPENT FUEL PIT HX AND SW HEADER FLUSH NOTE: Nottfy Controlprior to theflush to monitor service water header pressure Flush only one heat exchanger at a time.

Flush the west service water supply header and spent fuel pit heat exchangers.

8.1 Noting original positions, fully open SW-660 and SW-661, spent fuel pit heat exchanger service water throttle valves.

8.2 Continue flushing until the bulls eye on the spent fuel pit service water radiation monitor is clear.

O Page 8 of 9

,INFORMATION USE o

NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30,1997 INITIALS 8.3 Return SW-660 and SW-661 to original positions.

8.4 Have Control shift the positions of SW-2930A and SW-2930B (SFP HX's outlet MOVs).

8.5 Noting original positions, fully open SW-660 and SW-661.

8.6 Continue flushing until the bulls eye on the spent fuel pit service water radiation monitor is clear.

8.7 Return SW-660 and SW-661 to original positions.

8.8 Have Control realign SW-2930A and SW-2930B to as-found positions.

9.0 ZURN STRAINER FLUSH Fully open the manual blowdown valve for the following Zurn strainers for a ,

minimum of 15 minutes, then shut the manual blowdown valve.

Blowdown  !

Zuni Isolation Valve Z-105A (CSR A/C) SW-338D Z-105B (CR A/C) SW-340D i

Z-104A (U1 supply) ISW-401D Z-104B (U2 supply) 2SW-401D Z-103 (PAB Zurn) SW-502E U1 CW Pump Seal Water Supply SW-39A U2 CW Pump Seal Water Supply SW-26A r

( .

Page 9 of 9

'