Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 ML20137P8441997-02-14014 February 1997 Rev 5 to Authorization of Changes,Test & Experiments (10CFR50.59 & 72.48 Reviews) ML20140G9351997-02-14014 February 1997 Rev 13 to ISTs IT 585, Leakage Reduction & Preventive Maint Program Test of Post-Accident Containment Atmospheric Sampling Sys (Refueling) ML20140G8921997-02-14014 February 1997 Rev 7 to ISTs IT 215, SI Valves (Cold Shutdown) ML20140G9401997-02-0707 February 1997 Rev 21 to TS Tests TS 10A, Containment Airlock Door Seal Testing ML20138K2991997-01-31031 January 1997 Rev 46 to OP 4D,Part 1, Draining RCS to CVCS Hut W/O Entering Reduced Inventory ML20138K2031997-01-31031 January 1997 Rev 6 to IT 380, Purge Valve Air Sys Check Valve (Quarterly) for Unit 1 ML20138K2551997-01-31031 January 1997 Rev 2 to IT 530B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) for Unit 1 ML20138K2411997-01-31031 January 1997 Rev 12 to IT 530, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 1 ML20138K3231997-01-31031 January 1997 Rev 9 to RP 6A, SG Crevice Flush (Vacuum Mode) ML20137P8551997-01-31031 January 1997 Brine Tank Standpipe Mod ML20138K3071997-01-31031 January 1997 Rev 38 to OP 9C, Containment Venting & Purging ML20138K2901997-01-31031 January 1997 Rev 2 to IT 535A, Leakage Reduction & Preventive Maint Program Test of Train a HHSI & RHR Sys (Refueling) Unit 2 ML20138K2641997-01-31031 January 1997 Rev 12 to IT 535, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 2 ML20138K4991997-01-31031 January 1997 Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device for Unit 2 ML20138K3181997-01-31031 January 1997 Rev 33 to RP 1B, Recovery from Refueling ML20138K3031997-01-31031 January 1997 Rev 1 to OP 4D,Part 5, Draining RCS to CVCS Hut W/O Entering Reduced Inventory & W/O SG Tubes ML20138K2251997-01-31031 January 1997 Rev 7 to IT 385, Purge Valve Air Sys Check Valve (Quarterly) for Unit 2 ML20138K4791997-01-31031 January 1997 Rev 15 to Ort 67, Component Cooling Water to & from Excess Letdown Heat Exchanger-Refueling Shutdown for Unit 1 ML20138K4701997-01-31031 January 1997 Rev 17 to Ort 59, Train Spray Sys CIV Leakage Test for Unit 1 ML20138K5041997-01-31031 January 1997 Rev 7 to Ort 50, PRT to Gas Analyzer Sample Line for Unit 2 ML20138K5161997-01-31031 January 1997 Rev 18 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 2 ML20138K4751997-01-31031 January 1997 Rev 19 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 1 ML20138K5231997-01-31031 January 1997 Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2 ML20138K7311997-01-31031 January 1997 Rev 9 to TS 80, Sampling of Emergency Fuel Oil Tank (T-72), Fuel Oil Storage Tanks (T-175A,B) & EDG Day Tanks (T-31A,B & T-176A,B)(Quarterly) ML20138K7171997-01-31031 January 1997 Rev 6 to TS 37, Containment Spray Nozzles Check (Frequency of Less than or Equal to Five Yrs) for Unit 1 ML20138K3121997-01-31031 January 1997 Rev 43 to RP 1A, Preparation for Refueling 1998-09-30
[Table view] |
Text
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30.1997 f-( - Date RECORD DSS PROCEDURE VERFED CURREN"f AND CHECKED FOR TEAPOR/.RY CHANGES !F TELD COPIES REQUIRED. USE PBF.002h 1AW NP 1.2 4 AND DO tiOI COMPLETE THIS BLOCK BY: DATE:
1.0 PURPOSE 1.1 To remove sediment and fouling of service water strainers.
1.2 Operational check of the bus duct coolers low flow alarms.
1.3 To remove sediment deposits in the SFP service water lines.
1.4 To remove sediment deposits in the service water supply lines to the auxiliary feed pumps using the built in flush lines.
2.0 REFERENCES
IR 96-006, NRC Inspection Report; NRC Commitment for Operations procedures PMT/QC reviews.
l j
) 3.0 PRECAUTIONS AND LIMITATIONS 1 Coordinate with Control Room personnel to align equipment to allow securing service water long enough to clean strainers. '
l 4.0 INITIAL CONDITIONS Assemble the necessary tools, lubricants, and cleaning supplies. (Spare pans as required for safeguards equipment.) i
\
V '
9702190071 970210 y Page 1 of 9 PDR ADOCK 05000301:: -
INFORMATION USE
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 !
SERVICE WATER STRAINERS January 30.1997 5.0 Procedure 5.1 Isolate, disassemble, clean and reinstall the following service water strainers.
INITIAL Strainer Component CLEANED YS-2920 K-2B YS-2919 K-2A YS-2918A K-3B YS-2918B K-3A YS-4432 HX-79, water treatment cooler YS-4435 HX-66A, auxiliary feed pump room YS-4430 HX-66, auxiliary feed pump room YS-4420 HX-39A&B, service building YS-4431 IHX-70, Electrical equipment room 1YS-2916 IHX-548, EH oil cooler 1YS-2917 IHX-54A, EH oil cooler lYS-2931 Vacuum prime pump seal YS-2983 Common vacuum priming pump seal lYS-2994 Condensate pump A 1YS-2990 Condensate pump B YS-2982 Heating boiler sample cooler 2YS-4431 2HX-70, Electrical equipment room 2YS-2931 Vacuum prime pump seal 2YS-2917 2HX-54A, EH oil cooler 2YS-2916 2HX-54B, EH oil cooler 2YS-2994 Condensate pump A 2YS-2990 Condensate pump B YS-4165 P-56A, water treatment vacuum pump YS-4166 P-56B, water treatment vacuum pump YS-4167 P-56C, water treatment vacuum pump YS-4439 HX-105A, Battery room cooler YS-4441 HX-105B, Battery room cooler YS-4434 HX-99, spray pump area YS-4433 HX-98, residual heat removal pump area YS-4421 HX-32B, auxiliary building YS-4422 HX-28B1, W-17 cooler YS-4423 HX-28B2, W-17 cooler YS-4424 HX-28A3, SSB AC chiller YS-4425 HX-28A 1/2, SSB AC chiller YS-4454 HX-194, gas analyzer cooler Page 2 of 9
.' l '
INFORMATION USE
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30.1997 b
4 EMI 5.2 Inspect for leakage at system pressure.
INITIAL Strainer Comoonent PMT YS-2920 K-2B i YS-2919 K-2A j YS-2918A K-3B YS-2918B K-3A YS-4432 HX-79, water treatment cooler YS-4435 HX-66A, auxiliary feed pump room
~
YS-4430 HX-66, auxiliary feed pump room YS-4420 HX-39A&B, service building YS-4431 IHX-70, Electrical equipment room IYS-2916 lHX-54B, EH oil cooler j 1YS-2917 IHX-54A, EH oil cooler lYS-2931 Vacuum prime pump seal YS-2983 Common vacuum priming pump seal
. lYS-2994 Condensate pump A 1YS-2990 Condensate pump B Os YS-2982 Heating boiler sample cooler 2YS-4431 2HX-70, Electrical equipment room 2YS-2931 Vacuum prime pump seal 2YS-2917 2HX-54A, EH oil cooler i 2YS-2916 2HX-54B, EH oil cooler 2YS-2994 Condensate pump A 2YS-2990 Condensate pump B YS-4165 P-56A, water treatment vacuum pump YS-4166 P-56B, water treatment vacuum pump YS-4167 P-56C, water treatment vacuum pump YS-4439 HX-105A, Battery room cooler YS-4441 HX-105B, Battery room cooler YS-4434 HX-99, spray pump area YS-4433 HX-98, residual heat removal pump area YS-4421 HX-32B, auxiliary building YS-4422 HX-28B1, W-17 cooler
, YS-4423 HX-28B2, W-17 cooler YS-4424 HX-28A3, SSB AC chiller YS-4425 HX-28A 1/2, SSB AC chiller m s YS-4454 HX-194, gas analyzer cooler
(\ -
Page 3 of 9 INFORMATION USE O
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR SERVICE WATER STRAINERS Jan 3 1997 O
Remarks:
6.0 AUXILIARY FEEDWATER PUMPS 6.1 Flush the south service water supply line to auxiliary feed pump suction via the bulls eye to the service water header by opening valve SW-140A.
6.2 Flush the north header in same manner as Step 6.1 above for SW-111 A.
- SHOULD IP-29 REQUIRE COOLING WATER SUPPLY WHILE SW-137 OR 137B IS SHUT, IT MUST BE PROVIDED BY MANUALLY THROTTLING OPEN OF BYPASS VALVE, SW-137A.
6.3 Station a Level 3 dedicated operator in accordance with OM 3.26. Supply cooling water to IP-29 if required.
6.4 Shut SW-13 7 and 137B. Then disassemble, clean, and inspect lYS-2998.
Flush SW through the strainer body with the strainer removed.
Reassemble the strainer. Lock open and record the lock numbers of the following:
't SW-137 Red Lock No. /
SW-137B Red Lock No. /
fMI '
6.5 Inspect lYS-2998 for leakage at system pressure.
6.6 Secure Level 3 dedicated operator.
Page 4 of 9 INFORMATION USE ,
9
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30.1997 7q INITIALS 4
- 6.7 In the second and fourth quarters, perform the following on the firewater
- backup cooling rupply
6.7.1 Shut FP-243 and 306.
6.7.2 Disassemble, clean and inspect YS-3795.
6.7.3 Flush firewater through the strainer body with the strainer removed.
6.7.4 Reassemble the strainer, YS-3795.
6.7.5 Open FP-243 and 306. Shut SW-135.
PMT 6.7.6 Inspect YS-3795 forleakage at system pressure.
6.7.7 Open cooling supply bypass, SW-137A and record PCV-3771 pressure on IPI-4458 psig.
- 6.7.8 Shut SW-137A. Then lock open and record the lock numbers of the following:
SW-135 Red Lock No. /
! FP-243 Red Lock No. /
FP-306 Red Lock No. /
aCAUTIONa SHOULD P-38A REQUIRE COOLING WATER SUPPLY WHILE SW-132 OR SW-132B IS SHUT, IT MUST BE PROVIDED BY MANUAL THROTTLING OPEN OF BYPASS VALVE SW-132A.
6.8 Station a Level 3 dedicated operator in accordance with OM 3.26. Supply
, cooling water to P-38Aifrequired.
^ (O ) .
4 Page 5 of 9 INFORMATION USE,
)
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 l SERVICE WATER STRAINERS January 30,1997 INITIALS 6.9 Shut SW-132 and 1328. Then disassemble, clean and inspect YS-2914.
Flush SW through the strainer body with strainer removed. Reassemble the strainer. Lock open and record the lock.
SW-132 Red Lock No. /
SW-132B Red Lock No. /
PMT 6.10 Inspect YS-2914 for leakage at system pressure.
6.11 Secure Level 3 dedicated operator.
3
- CAUTIONa SHOULD 2P-29 REQUIRE COOLING WATER SUPPLY WHILE SW-115 OR SW-115B IS SHUT, IT MUST BE PROVIDED BY MANUALLY THROTTLING OPEN OF BYPASS VALVE, SW-115A.
6.12 Station a Level 3 dedicated operator in accordaace with OM 3.26. Supply cooling water to 2P-29 if required.
6.13 Shut SW-115 and 115B. Then dhassemble, clean and inspect 2YS-2998.
Flush SW through the strainer body with the strainer removed.
Reassemble the strainer. Lock open and record the lock numbers of the following:
SW-115 Red Lock No. /
SW-1ISB Red Lock No. /
PMT 6.14 Inspect 2YS-2998 for leakage at system pressure.
6.15 Secure Level 3 dedicated operator.
6.16 In the second and fourth quarters, perform the following on the firewater backup cooling supply: .
6.16.1 Shut FP-245 and 298.
6.16.2 Disassemble, clean and inspect YS-3796.
. Page 6 of 9 INFORMATION USE e
U
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30,1997
,o INITIALS 6.16.3 Flush firewater through the strainer body with the strainer removed.
6.16.4 Reassemble the strainer, YS-3796.
6.16.5 Open FP-245 and 298. Shut SW-112.
6.16.6 Open cooling supply bypass, SW-115A and record PCV-3772 pressure on 2PI-4458. psig 6.16.7 Shut SW-115A. Then lock open and record the lock numbers of the following:
SW-112 Red Lock No. /
FP-245 Red Lock No. /
FP-298 Red Lock No. /
PMT 6.17 Inspect YS-3796 for leakage at system pressure.
- CAUTIONa SHOULD P-38B REQUIRE COOLING WATER SUPPLY WHILE SW-123 OR SW-123B IS SHUT, IT MUST BE PROVIDED BY MANUAL THROTTLING OPEN OF
- BYPASS VALVE SW-123A.
, 6.18 Station a Level 3 dedicated operator in accordance with OM 3.26. Supply cooling water to P-38B if required.
6.19 Shut SW-123 and 123B. Then disassemble, clean and inspect YS-2913.
Flush SW through the strainer body with strainer removed. Reassemble the straincr. Lock open and record the lock numbers of the following:
SW-123 Red Lock No.
/
SW-123B Red Lock No. . /
P.MI 6.20 Inspect YS-2913 for leakage at system pressure.
/G
, 6.21 Secure Level 3 dedicated operator. ,
. Page 7 of 9 INFORMATION USE 4 4 0
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30,1997 INITIALS 7.0 BUS DUCT COOLER LOW FLOW ALARM CHECK 7.1 Umt i 7.1.1 Open ISW-425C.
7.1.2 Shut ISW-425B.
7.1.3 Ensure the Control Room receives the " Unit 1 Generator Bus Cooling Water Flow Lo" alarm.
7.1.4 Open ISW-425B.
7.1.5 Shut ISW-425C.
7.2 Unit 2
, 7.2.1 Open 2SW-425C.
7.2.2 Shut 2SW-425B.
7.2.3 Ensure the Control Room receives the " Unit 2 Generator Bus Cooling Water Flow Lo" alarm.
7.2.4 Open 2SW-425B.
7.2.5 Shut 2SW-425C.
8.0 SPENT FUEL PIT HX AND SW HEADER FLUSH NOTE: Nottfy Controlprior to theflush to monitor service water header pressure Flush only one heat exchanger at a time.
Flush the west service water supply header and spent fuel pit heat exchangers.
8.1 Noting original positions, fully open SW-660 and SW-661, spent fuel pit heat exchanger service water throttle valves.
8.2 Continue flushing until the bulls eye on the spent fuel pit service water radiation monitor is clear.
O Page 8 of 9
,INFORMATION USE o
NUCLEAR POWER BUSINESS UNIT PC 43 PART 3 OPERATIONS PERIODIC CHECKS MINOR Revision 13 SERVICE WATER STRAINERS January 30,1997 INITIALS 8.3 Return SW-660 and SW-661 to original positions.
8.4 Have Control shift the positions of SW-2930A and SW-2930B (SFP HX's outlet MOVs).
8.5 Noting original positions, fully open SW-660 and SW-661.
8.6 Continue flushing until the bulls eye on the spent fuel pit service water radiation monitor is clear.
8.7 Return SW-660 and SW-661 to original positions.
8.8 Have Control realign SW-2930A and SW-2930B to as-found positions.
9.0 ZURN STRAINER FLUSH Fully open the manual blowdown valve for the following Zurn strainers for a ,
minimum of 15 minutes, then shut the manual blowdown valve.
Blowdown !
Zuni Isolation Valve Z-105A (CSR A/C) SW-338D Z-105B (CR A/C) SW-340D i
Z-104A (U1 supply) ISW-401D Z-104B (U2 supply) 2SW-401D Z-103 (PAB Zurn) SW-502E U1 CW Pump Seal Water Supply SW-39A U2 CW Pump Seal Water Supply SW-26A r
( .
Page 9 of 9
'
.