ML20129J440

From kanterella
Jump to navigation Jump to search
Telcon W/S Clark of Houston City Magazine on 791121 Re D Swayze Allegations.Allegation Concerning Falsified Records Re Plant Quality Substantiated
ML20129J440
Person / Time
Site: 05000000, South Texas
Issue date: 11/27/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17198A238 List: ... further results
References
FOIA-84-393 NUDOCS 8506100091
Download: ML20129J440 (1)


Text

-

g f ** %qjg UNITED STATES

['g', ) s.. y g NUCLEAR REGULATORY COMMISSION

Q\\,M(/. r REGION IV o,, M' * @ D[

611 RYAN PLAZA oRIVE, $UITE 1000 AR LINGToN, TEXAS 76012

%,

  • s.J

,o w

,=

November 27, 1979 Docket No. 50-498 50-499 MEMORANDUM FOR: File FROM:

W. C. Seidle, Chief, RC&ES Branch

SUBJECT:

TELEPHONE CALL FROM MAGAZINE REPORTER REGARDING SOUTH TEXAS PROJECT (STP), DN 50-498; 50-499 On November 21, 1979, Ms. Sara Clark, reporter for the Houston City Magazine, called to discuss the Dan Swayze allegations regarding STP. She specifically asked if records ha'd, in fact, been falsified which raised questions about the quality of the plant. I informed her that we were unable to substantiate this allegation.

She riso asked if we had investigated all of Swayze's allegations.

I informed her that we had.

f F-W. C. S 'i le, Chief Reactor onstruction and l

Engineering Support Branch ec:

W. A. Crossman C. E. Wisner.

H. S. Phillips W. G. Hubacek/

i 1

i 8506100091 B40620 PDR FOIA OLASSPIS4-393 PDR

,1

-_!