Discusses Allegations by Brown & Root Auditor Concerning Audit Deficiencies Including 10CFR50.55e Const Deficiency & Qualifications of Site Project Engineers
ML20126J163
Person / Time
Site: 05000000, South Texas
Issue date: 07/18/1980
From: Crossman W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17198A238 List: ... further results
References
FOIA-84-393 NUDOCS 8506100519
Download: ML20126J163 (2)


Text

,

l

}

Y[' Wtouh'o,,

UMTED STATES

. NUCLEAR. REGULATORY COMMISSION i

(

)

=$EES"a-Jul'y 18,1980 Docket No. 50-498 50-499 i

MEMORANDUM FOR: File THRU:

Seidle, Chief, RC&ES Brar.3.

,u, -.

u-FROM:

W. A. Crossman, Chief, Projects Section

SUBJECT:

ALLEGATIONS BY A BROWN & ROOT AUDITOR CONCERNING AUDIT DEFICIENCIES AT THE SOUTH TEXAS PROJECT The Resident Reactor Inspector was advised by an HL&P representative on 1

July 2,1980, that there had been disagreement over responses provided to a Brown & Root site auditor of his audit findings listed in B&R Audit No. 36 of June 3, 1980. The notification and alleger identification is documented in a memorandum to the Confidential Source Index File, dated July 9, 1980.

The B&R auditor contacted the STP RRI on July 14, 1980, and outlined generally his concerns as follows:

1.

A construction deficiency, reportable within the context of 50.55(e) was identified but was not reported within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. The alleger has a " confidential" internal B&R memorandum, dated May 12, 1980, which identifies the deficiency. The deficiency was not reported until June 3, 1980.

2.

A person was hired in as a clerk / typist and was later put in a site-project engineering position.

He doubts that the person is qualified.

l 3.-

The B&R site auditors don't have necessary discipline knowledge to j

perform audits.

i 4.

The alleger claims to have been intimidated and inferences have been made as to possible loss of his job.

I 8506100519 B40620 PDR FOIA GLASSIS4-393 PDR

/

,,m_-

,,..__w.4

---.v-

- -,., -., - -. ~,, -

---..,.,.-c,..-e

.-.-,r--.--n,.

m.

..m.

- n

.. - _,,. ~, _. -, -.. -,.

O d

File - DN 50-498; 50-499 July 18, 1980 5.

Corrective action responses to his audit findings address only the specific problem and not the causi.

=

W. A. Crossman, Chief Projects Section cc:

R. E. Hall R. K Herr..

C.' E. Wisner W. G. Hubacek H. S. Phillips C. R. Oberg O

e l

4 l

/

l i

i r

?

O p %.y

~ UW1ED s1 ATEs I#*

- f g

NUCLE AR REGUL ATORY COMMISSION

$ y/."",,.

/

s e

namow ev e

sii avAw n Ara onivt. aunt ioco g.i./l:( ! )S

, y'.

Antinoton.Te xAs n.wir k.-

July 9,1980 a...+

Docket flo. 50-498 50-499

,MLtioRAftDUM FORT M1e

.... A. Crossman. Chief. Pyp.jgets,Spetton,.

W TifRus TROM:

}{. S. Phillips, Resident inspector. STP f o

[

SUBJECT:

RESPONSE TO BROWN 8 RODT AUDIT f 35 i

On 7/2/80 a licensee representative notified me advising there had been disagreements over responses provided to Mr. Charles Williamson, a Brown

& Root QA Auditor.

Two or.three meetings were held between Mr. Williamson and BER construction personnel to discuss audit responses which were considered inadequate.

As a result of the discussions. Mr. Williamson perceived that he was being harassed.

Mr. Williamson met with Dr. Knox Broom, BAR Senior Vice President, to

's' express his concerns.

The responses are to be revised.. Mr. Williamson was told he was free to express his concerns to the NRC at anytime.

It is my judgement that 1 should not become involved until HL&P/B&R manage-ment have exhausted all effort to resolve the matter.

I will continue to track the matter.

f m$h s H. S. Phillips, Resident inspector South Texas Project em g

- -